Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Hiram Butler House Rehabilitation

Open
PE-66398-NONST-2027-000000030State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Kennesaw is soliciting a Construction Manager at Risk for the rehabilitation of the Hiram Butler House located at 2382 Pine Mountain Road, Kennesaw, GA 30152. The scope of work includes structural repairs, reroofing, painting, exterior repair of the brick envelope, and mechanical and electrical upgrades. The project has a total cost limitation of $550,000, which covers pre-construction, construction, contingency, and other owner-associated costs. Within this budget, a fixed maximum of $350,000 is allocated for all construction work excluding HVAC and HVAC-related work, which must be funded separately. Selection will be conducted through a qualification-based process. Interested firms must request the full RFQ Package from City Clerk Lea Alvarez to be eligible for consideration. Responses must be submitted in a sealed envelope containing the firm's name, address, and the project name, delivered to the City Clerk's office at Kennesaw City Hall by Friday, December 11, 2026, at 1:00 p.m. local time. Only firms on record as having received the RFQ Package will have their responses opened.

General Info

Kennesaw seeks a Construction Manager at Risk for Hiram Butler House rehabilitation.

Documents

1
TXT, High priority: read this firstrfq
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyGeorgia → City of Kennesaw
Contacts1 person available
OfficeN/A

Full Description

Show more
Project site is 2382 Pine Mountain Road, Kennesaw, GA 30152. Principal items include exterior repair work of the brick envelope, painting, reroofing, structural repairs, and mechanical and electrical upgrades to the Hiram Butler House at Smith Gilbert Gardens. Total stated cost limitation for the project is $550,000, inclusive of pre-construction, construction, contingency, and other owner associated costs. Within the total stated cost limitation, a maximum of $350,000 is available for all construction work excluding HVAC and HVAC-related work. This $350,000 limitation is fixed and shall not be increased by any savings or unused funds associated with the HVAC and HVAC-related scope. Funds allocated to HVAC and HVAC-related work shall remain separate from the $350,000 limitation applicable to all other construction work. The construction manager at risk will be evaluated and selected through a qualification-based process.
A full RFQ Package stating the full Response requirements can be obtained from the Kennesaw City Clerk¿s Office, upon request to Lea Alvarez, City Clerk, via email at Sign up to see this detail . Only a Response submitted by a Firm on record with the City Clerk¿s Office as having received the RFQ Package from the Issuing Office will be opened.
Responses must be submitted in a sealed envelope bearing on the outside the name of the Firm, the Firm¿s address, and the name of the Project for which the Response is submitted. If forwarded by mail, the sealed envelope containing the Response must be enclosed in another envelope addressed as specified above.
Responses will be received by the City of Kennesaw, Georgia at the office of the City Clerk located in Kennesaw City Hall at 2529 J.O. Stephenson Avenue, Kennesaw, Georgia, 30144 until: Friday, December 11, 2026, at 1:00 p.m. Local Time. Responses will be opened and the names read aloud.
The Owner reserves the right to reject any or all Responses, to waive formalities, and re-advertise.

Similar Contracts

Same NAICS industry code

NAICS: 236220
New
SLED
Building 262 Renovations FLETC Glynco
Solicitation # 70LGLY27RSSB00001
Solicitation 70LGLY27RSSB00001 is a total small business set-aside for a single firm fixed price contract to perform comprehensive interior renovations of Building 262 at the Federal Law Enforcement Training Center in Glynco, Georgia. The scope of work includes replacing corridor and classroom flooring with LVP and carpet tiles, fully remodeling restrooms, updating doors and life-safety components, and repainting interior surfaces. Technical upgrades involve installing raised flooring with integrated electrical distribution for classrooms, replacing variable air volume systems, and updating lighting controls and plumbing. The project is scheduled for a period of performance from January 11, 2027, to March 11, 2028, with a total duration of 425 calendar days after the notice to proceed. The procurement is managed by the Department of Homeland Security, with proposals due by November 18, 2026. Award evaluation is based on three factors of equal importance: past performance, corporate relevant experience, and price. Successful offerors must provide payment and performance bonds, as well as a bid guarantee of 20 percent of the bid price or 3 million dollars. Strict security protocols are in place, requiring background checks, FBI fingerprinting, and adherence to DHS non-disclosure agreements for personnel. All work must comply with ADA accessibility guidelines and prevailing wage determinations for the Georgia region.
Bristol Alliance of Companies

POSTED

about 2 hours ago

DEADLINE

in 5 days
View Details
NAICS: 236220
New
SLED
Repair Auto Maintenance Bldg 575
Solicitation # N40085-27-R-9000
Solicitation N40085-27-R-9000 is for the repair and modernization of the Auto Maintenance Facility, Building 575, at Marine Corps Base Camp Lejeune, North Carolina. The project scope is comprehensive, involving selective demolition, building envelope and roofing repairs, interior reconfiguration, and the installation of new finishes. Critical infrastructure upgrades include new HVAC systems, exhaust extraction, compressed air systems, a full NFPA-compliant fire suppression system, and updated electrical distribution, lighting, and building automation controls. Additionally, the project requires site improvements such as paving removal and replacement, drainage upgrades, and hazardous materials abatement. The contract has an estimated value between 10 million and 25 million dollars with a performance period of 730 days after award. Award will be based on the lowest price, with evaluation focused on two primary exhibit line items: building renovation and paving work. Proposals are due by November 23, 2026. Depending on the proposal value, contractors may be required to provide bid, payment, and performance bonds, with bid bonds set at 20 percent of the proposal amount. The work must adhere to the Davis-Bacon Act, the Buy American statute, and ADA accessibility guidelines. Invoicing is processed monthly via Wide Area Work Flow (WAWF) and requires extensive supporting documentation, including certified payrolls and updated construction schedules.
Bristol Alliance of Companies

POSTED

about 2 hours ago

DEADLINE

in 10 days
View Details
NAICS: 236220
New
SLED
Modify Transfer Facility NBK Bangor
Solicitation # N44255-25-R-1502
Solicitation N44255-25-R-1502 is a firm-fixed-price design-build contract for the renovation and modernization of Transfer Facility Building 6594 at Naval Base Kitsap Bangor, Washington. With an estimated magnitude between 10 million and 25 million dollars, the project involves comprehensive upgrades to the exterior enclosure, roof, plumbing, electrical, HVAC, and fire protection systems, as well as the construction of a 400 square foot addition for forklift battery charging. A critical requirement of the project is a two-phase execution strategy that ensures the facility remains operational and mission-capable between phases, necessitating multiple mobilization and demobilization cycles. Phase 1 encompasses the primary design for both phases and initial construction, while Phase 2 focuses on the installation of new building equipment, including a prefabricated paint booth and the replacement of a 40-ton bridge crane. The contract mandates strict adherence to NAVFAC, UFC, and IBC standards, alongside rigorous cybersecurity and environmental compliance, including Puget Sound Clean Air Agency regulations. Performance timelines require work to commence within 15 calendar days of award, with the base bid completion due within 360 calendar days and an optional seismic upgrade component due within 1082 calendar days. Liquidated damages are set at 4,137 dollars per day for the base bid and 280 dollars per day for the option. Proposals must be submitted via the PIEE portal by December 7, 2026, and include a completed schedule of prices and an executed bid bond. Award will be based on the proposal determined to be most advantageous to the government, with payments processed through the Wide Area WorkFlow system.
Bristol Alliance of Companies

POSTED

about 2 hours ago

DEADLINE

in 21 days
View Details
NAICS: 236220
New
Water Damage Restoration
Solicitation # G26-005
Solicitation G26-005 is a request for a single lump sum contract to perform multi-floor water damage restoration in Building 17 at the Grafton Job Corps Center in North Grafton, Massachusetts. Operated by Adams and Associates, Inc. for the U.S. Department of Labor, the project follows a fire sprinkler discharge that impacted the first, second, and third floors, including dormitories, offices, and medical areas. The scope of work involves architectural repairs such as drywall replacement, painting, ceiling tile and flooring installation, rubber wall base installation, electrical repairs, and the replacement of vanities and cabinets to restore the facility to its original condition. The total period of performance is 105 days, with substantial completion required within 90 days and final completion within an additional 15 days. This is an SBA set-aside opportunity open to small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified entities. Award will be based on best value, with evaluation weights assigned to price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). Bidders must attend a mandatory pre-bid site visit and provide a detailed cost breakdown, a 90-day bid guarantee, and proof of a valid Massachusetts Contractor's License. The contract is subject to the Davis-Bacon Act, NFPA-101 life safety codes, ADA, OSHA, and EPA regulations. Payment terms are Net 30, and the contractor must name Adams and Associates, Inc. as an additional insured on their automobile liability policy.
Grafton Job Corps

POSTED

about 2 hours ago

DEADLINE

in 3 days
View Details
NAICS: 236220
New
Springdale JCC –Dormitory Interior Renovation & Repairs
Solicitation # springdale-jcc-dormitory-interior-renovation-repairs
Career Systems Development Corporation, operating for the U.S. Department of Labor, is soliciting proposals for the interior renovation and repair of the North Wing dormitory at the Springdale Job Corps Center in Troutdale, Oregon. The project focuses on restoring water-damaged interior spaces to safe residential use, specifically targeting sixteen residential rooms and bathrooms, as well as mechanical rooms and common areas. The scope of work includes drywall installation, joint finishing, and painting for approximately 300 square feet of floor area in utility rooms and hallways, along with the temporary disconnection and re-installation of HVAC equipment, water heaters, and furnaces. This solicitation is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. The project is subject to the Davis Bacon Act under wage determination OR20260100, requiring the submission of weekly certified payrolls. Awarded contractors must provide payment and performance bonding for the full project value, as well as proof of liability and worker's compensation insurance, within ten days of award. Proposals must include detailed relevant experience, a comprehensive work plan addressing project phasing and occupied-building protection, and itemized pricing by room and trade. A minimum one-year workmanship warranty is required upon final acceptance by CSD.
Career Systems Development Corporation

POSTED

about 2 hours ago

DEADLINE

in 6 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS