Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

HM-4 TMS Detection Technology Replacement, EA 03-4G200

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The California Department of Transportation District 3 is implementing the HM-4 TMS Detection Technology Replacement project, identified as EA 03-4G200, to modernize ramp-metering and Traffic Management System elements across various state routes in Sacramento and Placer counties. The scope of work involves the rehabilitation, replacement, or relocation of existing equipment to ensure reliable operation of detection systems. Key technical activities include conduit trenching and cleaning, replacing electrical conductors and detection loops, and installing new Cast-in-Drilled-Hole pile foundations and poles. These poles will be equipped with Microwave Radar Systems, Microwave Vehicle Detection Systems, and flashing beacons, with new guardrails installed at light pole locations as required. Construction is anticipated to begin on May 7, 2027, with an estimated duration of 50 working days. All work will be performed within Caltrans Right-of-Way. The project has been granted a CEQA Class 1 exemption and a NEPA categorical exclusion, as it involves existing facilities with negligible expansion of use and no significant environmental impacts. The contractor must adhere to strict environmental and safety standards, including 2025 Caltrans Standard Specifications for air quality and noise control. Specific requirements for hazardous waste management are mandated, including the submission of Lead Compliance Plans for aerially deposited lead and unregulated earth material containing lead, as well as providing shipping records for treated wood waste.

General Info

Caltrans District 3 project upgrading TMS detection technology and ramp-metering in Sacramento and Placer.

Agency

California → Caltrans, District 3 - Marysville/Sacramento

Place of Performance

CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Caltrans, District 3 - Marysville/Sacramento
Contacts1 person available
OfficeN/A
Organization / Agency
California → Caltrans, District 3 - Marysville/Sacramento
Office AddressN/A
Contacts
Obaida AktherAssociate Environmental Planner

Full Description

Show more
The California Department of Transportation (Caltrans) proposes a HM-4 rehabilitation project along various state routes in Sacramento and Placer counties to rehabilitate, replace, or relocate existing ramp-metering and Traffic Management System (TMS) elements at multiple locations. The work includes conduit trenching, cleaning, and replacement of existing electrical conductors, installation of new Cast-in-Drilled-Hole (CIDH) pile foundations and poles equipped with Microwave Radar Systems (MRS), Flashing Beacons, and/or Microwave Vehicle Detection Systems (MVDS), installation of new guardrail at light pole locations where needed, and replacement of existing electrical detection loops.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
SLED
Water, Street & Drainage Improvements - W Phillipsburg Phase 2
Solicitation # PE-77648-NONST-2027-000000031
The Tift County Board of Commissioners is soliciting competitive cost sealed bids for the Water, Street and Drainage Improvements project for the West Phillipsburg Community Phase 2 in Georgia. The scope of work includes the construction of approximately 3,600 linear feet of twenty-foot-wide urban roadway featuring curb, gutter, base, and asphalt, along with the installation of storm drainage pipes and boxes. Additionally, the project requires the replacement of approximately 1,230 linear feet of 2-inch PVC water main, including the transfer of existing water services and the installation of fire hydrants. The project will be awarded as a single contract, with a timeline of 180 consecutive calendar days to reach substantial completion and 194 consecutive calendar days for final contract close-out. To be eligible, bidders must be pre-qualified Georgia Department of Transportation Contractors, and all watermain construction must be performed by a Licensed Utility Contractor. Mandatory submission requirements include a Bidder's Affidavit of Compliance with O.C.G.A section 13-10-91 regarding E-Verify, a bid bond or certified cashier's check for at least ten percent of the bid amount, and the contractor's license number clearly displayed on the bid envelope. The successful bidder must provide performance and payment bonds for one hundred percent of the contract amount from a Georgia-licensed surety company. Bids are due by 11:00 AM on November 17, 2026, to the Tift County Board of Commissioners in Tifton, Georgia.
Tift County Board of Commissioners

POSTED

about 11 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237310
New
Joliet Job Corps-Request for Quote Parking Lot and Road Repairs
Solicitation # joliet-job-corps-request-quote-parking-lot-road-repairs
Management & Training Corporation (MTC), operating the Joliet Job Corps Center for the U.S. Department of Labor, is seeking bids for a fixed-price, single lump sum subcontract for road and parking lot repairs in Illinois. The project scope includes the full-depth removal and replacement of approximately 62,500 square feet of asphalt pavement across five specific areas, the repair of five storm sewer drain structures, and the patching of five potholes. All work must be completed within 90 consecutive business days following a written Notice to Proceed, with all removed materials disposed of at an approved offsite facility. The estimated contract value ranges from $100,000 to $250,000. Bids are due by October 21, 2026, and will be awarded based on overall best value. Mandatory submission requirements include a physical site visit, a signed attendance roster, the MTC Bid for Lump Sum Contract form, a completed MTC Supplier Packet, and a detailed cost breakout on company letterhead. Because the project exceeds $25,000, bidders must provide a bid bond guarantee equal to 20% of the base bid, and the awarded contractor must provide performance and payment bonds from a surety company with at least an A- rating. The project is subject to Construction Wage Rate Requirements, necessitating compliance with prevailing wages and the submission of certified payroll reports. Payment is based on percentage of completion using AIA G702 and G703 forms, with a 10% retainage held until substantial completion.
Joliet Job Corps

POSTED

about 11 hours ago

DEADLINE

in 5 days
View Details
NAICS: 237310
New
SLED
RFP27-001 Cochran Mill Park Bridge Repair/Replacement
Solicitation # 27-001
The City of Chattahoochee Hills, Georgia, is soliciting sealed bids under RFP 27-001 for the repair and potential replacement of the Cochran Mill Park Trail Bridge located at 6875 Cochran Mill Road. The project scope involves a four-phase process including mobilization, demolition, steel preparation and coating, reconstruction of railings, and final cleanup. Key deliverables include the implementation of environmental containment measures using plastic sheeting to capture debris and the provision of a detailed work plan with specific cure times for primers and finish coats. The contract will be awarded to the highest scoring offeror based on a points system evaluating cost and pricing, technical qualifications and past experience, and the proposed project approach and schedule. Proposals must be submitted by 1:00 PM EST on November 19, 2026, and must include one original and two copies delivered to the Finance Department. Required documentation includes a signed cover sheet, a detailed line-item price breakdown, a disclosure form regarding campaign contributions and family relations, and resumes for all key personnel. The successful contractor must maintain primary insurance coverage and comply with various federal and state non-discrimination laws. The initial contract term is defined as the Notice to Proceed plus six months, and the City retains the right to cancel the contract based on poor performance assessments or through specific termination clauses for cause or convenience.
City of Chattahoochee Hills

POSTED

about 12 hours ago

DEADLINE

in about 1 month
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS