Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Washington was posted on August 20, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Holden Natural Drainage System (NDS)

Closed
PW#2024-051State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 561730
New
SLED
RFP#26-11193-A307 Turf Mowing, Management, and Maintenance of Patriot Centre and CCBC
Solicitation # 26-11193-A307
Henry County is soliciting proposals under RFP 26-11193-A307 for the turf mowing, management, and maintenance of the Patriot Centre and Commonwealth Crossing Business Centre (CCBC) in Virginia. The scope of work includes specialized maintenance for entrances, shoulders, embankments, open fields, and storm water management ponds, with specific requirements for mowing heights and frequencies ranging from weekly entrance maintenance to bi-monthly embankment care. The county may award the contract in its entirety to one vendor or split it between two separate vendors. Proposals are due by November 19, 2026, at 3:00 p.m. local time and must be submitted via eVA, USPS, or courier. Evaluation is based on a 100-point scale, prioritizing annual cost (30 points), project understanding (20 points), management approach (20 points), past experience (20 points), and resource availability (10 points). Qualified firms must provide a Virginia State Corporation Commission identification number, a valid State of Virginia Contractor’s License (A, B, or C), and certifications for applying fertilizers and herbicides. Mandatory submission documents include a signed Non-Collusion Statement, a Subcontractor Information Form, and proof of liability insurance. The contract includes a piggyback clause for other government agencies and requires strict adherence to non-discrimination and indemnity agreements.
Henry County

POSTED

about 4 hours ago

DEADLINE

in 27 days
NAICS: 561730
New
MJCC LAND MAINTENANCE RFQ
Solicitation # mjcc-land-maintenance-rfq
The Muhlenberg Job Corps Center, operated by Insights Training Group LLC, is soliciting fixed-price quotes for comprehensive ground maintenance services at its campus in Greenville, Kentucky. The scope of work covers approximately 50 acres and 35 or more buildings, requiring mowing, string trimming, edging, and cleanup to maintain turf height between 3 and 4 inches. The contract is for an initial one-year term with options for four additional one-year renewals. Award will be granted to the responsible offeror who is determined to be technically acceptable and provides the lowest price. To be considered technically acceptable, offerors must be registered in the State of Kentucky, verified through the SAM portal, and provide a detailed submission including a technical proposal, company qualifications, three references, an equipment list, insurance documentation, and a safety program. The contract is governed by the Federal Acquisition Regulation and requires strict adherence to the Davis-Bacon Act and Contractor Wage Rate Requirements, specifically Wage Determination Number KY20210041. Contractors must submit weekly certified payroll and a signed Statement of Compliance with every invoice to receive payment. Additionally, prime contractors must provide proof of their ability to secure performance and payment bonding, with payment bonds required for contracts exceeding 100,000 dollars. All quotes must be submitted electronically to mjccpurchasing@insightsllc.net by October 30, 2026.
Muhlenberg Job Corps Center / Insights Training Group LLC

POSTED

about 6 hours ago

DEADLINE

in 6 days
NAICS: 561730
New
SLED
Willow Tree Pruning
Solicitation # 2026
The City of Foster City is soliciting bids for the annual pruning of willow trees located in city parks and on city-owned property along public paths. The scope of work includes structural pruning, raising crowns for vertical clearance with a minimum live crown ratio of 66 percent, cleaning crowns of dead or diseased branches, reducing crown height or spread, and restoring previously damaged trees. The contractor is responsible for providing all necessary staff, materials, and equipment, and must adhere to strict prohibitions against lion tailing and the freefall of branches. Daily site cleanup is required, and the contractor must coordinate a pruning schedule with city staff at least 72 hours in advance. The project requires strict adherence to CALOSHA safety standards and the State of California Department of Transportation Manual of Traffic Controls for public safety and traffic management. The successful bidder must comply with all applicable prevailing wage laws and post the required wage rates at the work sites. Bids must be submitted by November 13, 2026, and include a completed Bid Response Form covering contact information, licenses, and any exceptions to the agreement terms. The primary point of contact for this solicitation is Park Supervisor Garrett Gotthardt. Work is specified for several locations, including Boothbay, Port Royal, Edgewater, Gateshead, and Sea Cloud.
City of Foster City

POSTED

about 7 hours ago

DEADLINE

in 21 days

AI Contract Overview

Show more

This contract involves a comprehensive project to improve water quality treatment for street runoff through the retrofitting of roadsides with bioretention treatment systems in Seattle, Washington. The scope includes extensive construction activities such as stormwater erosion control, site clearing, demolition of existing pavement and drainage infrastructure, excavation, utility adjustments, and the installation of new surface drainage systems, bioretention cells, and structural soil facilities. The project also encompasses site preparation, survey work, dewatering, temporary stormwater bypass, and the reconnection and testing of drainage and water services. Final site restoration involves paving, landscaping, and installation of sidewalks, curbs, and ramps, ensuring the area is returned to a functional and aesthetically pleasing state. The project's estimated cost is approximately $1.18 million, with a focus on enhancing stormwater management and environmental sustainability. Located on SW Holden Street between 16th and 18th Avenues in Seattle, the project is managed by the Washington Public Works Department, with solicitation details posted under PW#2024-051. The project response deadline is September 10, 2025. Key contact for the project is Kai Fan, reachable via email or phone. The contract emphasizes environmental protection, utility coordination, and final site restoration, aiming to improve urban water quality through innovative stormwater treatment infrastructure.

General Info

Place of Performance

WA, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyWashington → Public Works
Contacts1 person available
OfficeN/A
Organization / AgencyWashington → Public Works
Office AddressN/A

Full Description

Show more
Project Description: This Project will provide water quality treatment for street runoff by retrofitting the roadsides with bioretention treatment systems. This Project consists of the following elements of Work including but not limited to: construction stormwater erosion control (submittal, implementation, and maintenance of the Construction Stormwater Pollution Prevention plans (CSECP/SWPPP, TVSPP, SP, & TDP)); health and safety plan; clearing and grubbing; demolition and removal of existing surface pavement, sidewalks, and curbs; excavation; temporary traffic control plan and implementation, including flagging; site preparation and staging; survey; removal and abandoning existing drainage structures and piping; dewatering; temporary stormwater bypass; protection, relocation, and/or adjustments of existing utilities, including water and gas services; reconnection to the existing drainage system; installation of new surface drainage systems, including storm drainage piping, drainage structures, bioretention cells, and modular structural soil cell tree facilities; flow testing; assist SPU crews with water service and meter box relocations/adjustment; television inspections; and final site restoration, including surface paving, pavement markings, sidewalks, curbs, driveway, curb ramps, final planting, and landscape construction.Engineer's Estimate: $1,178,000.00Project Location: This Project is located in the City of Seattle (COS) on SW Holden St between 16th Ave SW and 18th Ave SW.

More opportunities from Washington → Public Works

Same awarding agency

NAICS: 541330
New
SLED
2026 AC Water Main Replacement
Solicitation # 2026-RFQ-042
Solicitation 2026-RFQ-042 is a request for qualifications from the City of Mercer Island Public Works department for professional engineering services to design water system upgrades. The project focuses on replacing approximately 5,000 linear feet of aging asbestos cement water mains with ductile iron mains along SE 40th St and E Mercer Way. The scope is divided into two phases: Phase 1 involves water system and PRV vault replacement on SE 40th St from Greenbrier Ln to 97th Ave SE, and Phase 2 extends the replacement to 97th Ave SE and the 3700 and 3800 blocks of East Mercer Way. Additional components for replacement include fire hydrants and water services. The design must comply with the Reduction of Lead in Drinking Water Act and the City of Mercer Island Standard Details Water. The project follows a goal-based timeline with bid-ready plans for Phase 1 due by Q2 2027 and Phase 2 by Q3 2027, with overall construction completion targeted for Q2 2028. Qualified firms must be licensed in the State of Washington and submit a Statement of Qualifications limited to 12 pages, including a proposed timeline and three references from the last five years. Selection is at the sole discretion of the City, and the awarded firm will negotiate a scope and fee schedule using the City's standard professional services agreement. Administration is managed by the City Manager, with payments issued via City warrant within 45 days of receiving a proper monthly invoice.
Engineering Services

POSTED

3 days ago

DEADLINE

in 11 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS