Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Subcontract opportunity from Texas was posted on June 1, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Hot Mix Asphalt Type D Production (Special Mix)

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 324121
New
SLED
804_2027 PLANT MIX - PRIMARY
Solicitation # IFB-131588
The Virginia Department of Transportation is soliciting bids for the 804_2027 Plant Mix - Primary contract (Solicitation IFB-131588), with a response deadline of December 16, 2026. The project is located in Highland County, Virginia, specifically on Route 250 within the Staunton District. The contract will be awarded to the lowest responsive and responsible bidder, with tie bids decided by lot. Prequalification is required for all applicants, and bids must be filed electronically through the Bidx portal. The scope of work involves the production of asphalt concrete conforming to specific mix types and VDOT Road and Bridge specifications. Key deliverables include the submission of a job mix formula for Engineer approval and the integration of hydrated lime at a minimum rate of 1% by weight of total dry aggregate. Quality control is stringent, requiring the contractor to perform gradation and asphalt binder content tests every 500 tons of production and report flat and elongated particles. Acceptance is based on nuclear density measurements and visual examinations conducted by the Engineer. Administrative requirements include strict adherence to the Davis-Bacon Act, the Build America, Buy America Act, and various non-discrimination laws including Title VI of the Civil Rights Act and the Americans with Disabilities Act. Contractors must provide one hour of paid sick leave for every 30 hours worked. Payment is processed via monthly progress estimates scheduled by the first letter of the contractor's company name. Performance and payment bonds are required, and contractors without a payment bond must provide certification from suppliers and subcontractors that all previous bills have been settled.
Virginia Department of Transportation

POSTED

1 day ago

DEADLINE

in about 1 month
NAICS: 324121
New
SLED
761_2027 PLANT MIX - SECONDARY
Solicitation # IFB-131586
The 2027 Plant Mix - Secondary project, managed by the Virginia Department of Transportation, involves the production and placement of asphalt concrete surface mixtures using Balanced Mix Design (BMD) criteria. The scope includes the delivery of approximately 1,180.820 tons of Asphalt Concrete Type SM-9.0A and 23,898.260 gallons of tack coat. Work must adhere to VDOT Specifications Section 211 and 315, with specific Performance + Volumetric Optimized (BMD P+VO) criteria for various mix types. The contract is awarded to the lowest responsive and responsible bidder, and prequalification is required. Bids must be submitted electronically by December 16, 2026, and must include a bid bond and vendor surveys for all prime contractors, subcontractors, and suppliers. Contractors must comply with extensive federal and state regulations, including the Davis-Bacon Act, the Copeland Act, and Title VI of the Civil Rights Act of 1964. All materials permanently incorporated into the project must meet Buy America and Build America, Buy America Act (BABA) requirements. Quality control is stringent, with asphalt density and binder content verified through nuclear density measurements and ignition tests, while pavement markings must meet AASHTO/NTPEP or VDOT certifications. Payment is based on tonnage via the Department eTicketing portal. Additionally, the contractor must provide performance and payment bonds and adhere to strict drug-free workplace and equal employment opportunity standards.
Virginia Department of Transportation

POSTED

2 days ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

The contract requires the production of D-GR HMA Type D PG 64-22 hot mix asphalt, a specialized mix designed to meet specific engineering standards and approved by the Texas Department of Transportation. The material is intended for delivery to Site 3 in Wichita, with strict adherence to TxDOT’s mix design requirements and quality control protocols. All production must comply with regulatory specifications to ensure performance under local climatic and traffic conditions, and the submission of the mix design must receive formal TxDOT approval prior to commencement. This subcontract is classified under NAICS code 324121, indicating its focus on asphalt paving and related materials manufacturing. Although the solicitation and response deadlines are both listed as June 1, 2026, the contract likely requires advance preparation and submittal of documentation prior to that date to allow for review and approval timelines. The place of performance is in Wichita, and all work must be executed in accordance with TxDOT’s operational and logistical guidelines for local maintenance and paving projects. No additional set-aside information or point of contact is provided, suggesting the contractor must reference the posted plans on the TxDOT FTP site for full technical specifications and compliance procedures.

General Info

Produce TxDOT-approved D-GR HMA Type D PG 64-22 asphalt for delivery to Wichita, complying with strict quality and regulatory standards.

Agency

Texas Department of Transportation

Place of Performance

Wichita, TX, USA

Set-Aside

NONE

Documents

This scope was carved out of 6502-29-001.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Wichita County — CSJ 6502-29-001 — June 2026 Letting — Local-Let Maintenance

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyTexas Department of Transportation
ContactsNo contacts available
OfficeN/A
Organization / Agency
Texas Department of Transportation
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Production of D-GR HMA Type D PG 64-22 for delivery to Site 3, requiring specific mix design and TxDOT approval.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS