Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on August 22, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

HSR25-28 Invitation for Bids for Ballast

Closed
HSR25-28State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 335921
New
Federal
56 CS FOC to Flightline and Wx Equipment, Luke AFB
Solicitation # F3YCFA6173AC01
Solicitation F3YCFA6173AC01 is a firm-fixed-price requirement for the engineering, furnishing, installation, and testing of new 12-strand single-mode fiber optic cable at Luke Air Force Base, Arizona. The project involves connecting Radar Approach Control to several key facilities, including the Air Traffic Control Tower, Base Operations, Command Post, and various flightline and meteorological stations. The work will utilize a combination of existing manhole/handhole duct systems and direct burial methods. The contractor is responsible for providing all new, rust-proof, and corrosion-resistant materials, labor, and equipment, as no government-furnished materials will be provided. The period of performance is not to exceed 180 calendar days, with a requested delivery date of July 1, 2027. This requirement is strictly set aside for SBA Certified Women-Owned Small Businesses under NAICS 335921. Award will be granted to the lowest priced, technically acceptable quote, with evaluations focusing on design, a quality control plan, and past performance via the Supplier Performance Risk System. Technical teams must be certified to EFI&T TC Comm FOTS, and supervisors must hold factory certifications from equipment manufacturers. Proposals are due by November 9, 2026. A mandatory site visit is scheduled for November 4, 2026, requiring advance registration by October 26, 2026, and the presentation of a REAL ID or government-issued passport for base access. All work must comply with Luke AFB environmental guides, including strict hazardous material and lead-based paint regulations.
FA4887 56 Cons Cc

POSTED

about 5 hours ago

DEADLINE

in 12 days

General Info

Documents

2

Draft IFB HSR25-28 for Ballast Q4 2025

PDF, High priority: read this first156 pages · ifb
High

IFB HSR25-28 Ballast Invitation for Bids

PDF, High priority: read this first164 pages · ifb
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

2 updates
PhaseClosed
Posted

Solicitation

Notice updated

Response deadline changed from Feb 19, 2026 to Dec 22, 2025. NAICS code changed from 237990 to 335921. The notice description changed.

Notice updated

Response deadline changed from Dec 22, 2025 to Oct 21, 2025. The point of contact changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → High Speed Rail Authority
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts
Trevor Newhouse

Full Description

Show more
08/22/2025: The California High-Speed Rail Authority (Authority) anticipates releasing a new Invitation for Bids (IFB) to purchase commoditized ballast (crushed igneous rock) materials necessary to complete the First Construction Segment of its high-speed rail track. 
A draft IFB is available for review as an attachment to this Cal-eProcure event. This draft IFB will be considered for approval and official release by the Authority's Board of Directors at its meeting scheduled for August 28, 2025, and is subject to change and approval by the Authority's Board of Directors. 
Posting of this draft IFB does not constitute acceptance of bids. The draft IFB or its approval, if granted by the Board of Directors, does not constitute a release of the final IFB. Release of the final IFB will occur via notice and posting on Cal-eProcure. 
Questions regarding this procurement may be submitted only upon final approval of IFB by the Board of Directors and release on the California State Contract Register.
Each materials contract will be issued through multiple Notices to Proceed (NTPs) as described below. The estimated cumulative value for all materials contracts (steel OCS poles, rail, concrete ties, ballast, OCS system components, and fiber optic cable) is not-to-exceed $507.1 million for NTP 1.
- NTP 1: The initial authorization to be issued for the manufacture and supply of Materials for use in construction on the 119-mile First Construction Section.
- NTP 2: To be issued at the Authority's option for the manufacture and supply of Materials for use in construction on the northern extension (Merced to Madera).
- NTP 3: To be issued at the Authority's option for the manufacture and supply of Materials for use in construction on the southern extension (Poplar Avenue in the County of Kern to Bakersfield). 
The scope of work for this specific procurement and resulting contract is to provide Ballast materials, composed of crushed igneous rock, for use in construction on the 119-mile First Construction Section, with an estimated lead time of two to three weeks for NTP 1. 
General requirements for each material are provided in the IFB and draft agreement. The Contractor shall not perform any Work unless the Authority, in its sole discretion, issues a Notice to Proceed (NTP) and Purchase Order for such work. The actual amount of Work requested by the Authority is subject to the availability of funding. In addition, all materials must be newly manufactured goods and conform to the technical specifications provided by the Authority. All materials supplied must be Buy America and Build America, Buy America Act (BABA) compliant, in accordance with 49 U.S.C. § 22905 and 2 C.F.R. part 184. 
Information regarding the Pre-Bid Conference and Small Business Workshop is available on the Authority's website.  
The anticipated schedule for this new procurement is as follows: 
- IFB Release: Q4 2025
- Virtual Pre-Bid Conference: TBD
- Bid Due/Opening Date: TBD
- Notice of Proposed Award: TBD
- Anticipated Contract Execution and Notice to Proceed: TBD
Questions regarding this procurement should be submitted to Kathryn Talattad at contact@example.gov or +1 (555) 000-0000.

More opportunities from California → High Speed Rail Authority

Same awarding agency

NAICS: 541350
New
SLED
HSR26-26 Re-Bid #2 Fresno Building Inspection
Solicitation # HSR26-26
The California High-Speed Rail Authority is seeking a contractor for the HSR26-26 Re-Bid #2 Fresno Building Inspection project. This informal solicitation requires a contractor holding a valid Class A or B license from the California Department of Consumer Affairs, Contractors State License Board to perform comprehensive on-site building inspections at the Fresno Office located at 1111 H Street, Fresno, CA. The scope of work involves evaluating major building systems, including plumbing, sewer, drainage, electrical, HVAC, roofing, building envelope, security, life-safety, and visible structural components. The contractor must assess these systems for condition, functionality, safety, regulatory compliance, and potential risks based on current federal, state, and local building codes. Key deliverables include a comprehensive written inspection report with narrative descriptions and photographs, a prioritized list of corrective actions categorized by urgency, and rough order-of-magnitude cost estimates for repairs. The performance period spans from November 1, 2026, through January 31, 2027, with a draft report due within ten business days of completing on-site work and a final report due five business days after receiving feedback. Bids are due by November 6, 2026, at 2:00 PM. Award selection will be based on the lowest responsible responsive bid, with a 3% to 5% incentive applied for Disabled Veteran Business Enterprise participation. Required submission documents include a cost sheet, bidder certifications, and a Payee Data Record.
Building Inspection Services

POSTED

5 days ago

DEADLINE

in 9 days
View Details
NAICS: 238910
SLED
Re-Bid HSR26-24 Clearance and Demolition Services at 16608 8th Avenue, Hanford, CA 93230
Solicitation # HSR26-24
The California High-Speed Rail Authority is soliciting bids for Right-of-Way clearance and demolition services at 16608 8th Avenue, Hanford, CA. The project involves the demolition and removal of a 1,390 square foot single family home and a 672 square foot garage. The scope of work includes the removal of all structures, foundations, and debris, as well as the testing and abatement of lead paint and both friable and non-friable asbestos. Additional requirements include capping sewer lines, site restoration through discing and backfilling, and the implementation of a Storm Water Pollution Prevention Plan or Water Pollution Control Program. The contract term is scheduled from December 1, 2026, through November 30, 2027, with a possible 12-month extension. Bidders must possess specific licenses and certifications, including Class A or Class B and C-21 licenses, C-22 or ASB certification, a C-57 well-drilling license, and a HAZ certificate for hazardous substance removal. Required submissions include a bid bond, and performance and payment bonds are mandatory if the bid exceeds 10,000 and 25,000 dollars, respectively. The award will be based on the lowest responsive and responsible bid, with preferences provided for certified Small Businesses, Microbusinesses, and Disabled Veteran Business Enterprises. All bids must be submitted in a sealed envelope, printed single-sided without binders, and delivered by October 28, 2026, at 3:00 PM.
Site Preparation Contractors

POSTED

21 days ago

DEADLINE

in about 5 hours
View Details
NAICS: 331420
SLED
HSR26-28 Invitation for Bids for Copper Conductors
Solicitation # HSR26-28
The California High-Speed Rail Authority has issued Invitation for Bids HSR26-28 for the procurement of OCS Copper Conductors to support the First Construction Segment of its high-speed rail track. The scope of work requires the contractor to supply high-conductivity 150mm2 Copper Tin contact wire and 65mm2 Bz catenary/messenger wire for the SNCF S220 OCS system. All materials must be Buy America compliant per 49 U.S.C. 22905 and meet various international standards, including EN 50149, IEC 63190, EN 50182, and EN 50326. The contractor is responsible for the direct handoff of materials to the Authority's onsite contractor at railheads located in Kern and Fresno Counties. The contract will be awarded to the lowest responsible responsive bidder based on the total contract bid price for years one through three. Bids are due by November 13, 2026, at 12:00 PM PST and must include a bid bond equal to 10 percent of the total bid amount. Submission requirements are strict, requiring a hard-copy bid form in a separately sealed envelope, along with a comprehensive bid package submitted both in hard copy and as a single searchable PDF. Bidders must also certify compliance with non-discrimination, lobbying, and labor laws, and commit to small business goals, including a 25 percent goal for small businesses and a 3 percent goal for disabled veteran business enterprises. Contract administration includes electronic monthly invoicing and a requirement for the contractor to submit a detailed delivery plan within 30 days of the Notice to Proceed. Quality assurance involves potential inspections at the place of production and final acceptance testing at the destination. Any products failing random sample reviews will result in a Non-Conformance Report requiring a root cause analysis and corrective action plan. All shipments must adhere to specific packaging and marking standards, including detailed packing sheets that reference the Authority's contract number and item descriptions.
Copper Rolling, Drawing, Extruding, and Alloying

POSTED

23 days ago

DEADLINE

in 16 days
View Details
NAICS: 335929
SLED
HSR26-39 Invitation for Bids for Aluminum Conductors
Solicitation # HSR26-39
The California High-Speed Rail Authority has issued Invitation for Bids HSR26-39 for the procurement of Overhead Contact Systems (OCS) Aluminum Conductors to support the First Construction Segment of its high-speed rail track. The scope of work requires the manufacture and delivery of a complete portfolio of conductors based on the SNCF S220 OCS system, specifically 217,754 meters of Aluminum-Steel static/ground/earth wire (93.3mm2) and 214,334 meters of Aluminum-Steel auxiliary/feeder wire (288mm2). Materials must be delivered to railheads in Kern and Fresno Counties, with the contractor providing a direct handoff to the Authority's onsite contractor. The contract will be awarded to the lowest responsible responsive bidder based on the total bid price. Bids are due by November 19, 2026, at 12:00 PM PST and must include a bid bond equal to 10 percent of the total bid amount. Submissions require a specific format consisting of a hard-copy bid form in a separately sealed envelope and a comprehensive bid package submitted both in hard copy and as a single, searchable PDF. Key compliance requirements include mandatory Buy America certification per 49 U.S.C. 22905, adherence to various European (EN) standards, and compliance with federal procurement standards under 2 C.F.R. Part 200. Additionally, bidders must provide certifications regarding small business, DVBE, and DBE status, as well as disclosures regarding organizational conflicts of interest and the use of generative AI. The contractor is required to submit a detailed delivery plan within 30 days of the notice to proceed and must maintain a quality control system approved by the Authority. Inspection and testing may occur at the place of production, with final acceptance conducted at the destination. Payment will be processed electronically in accordance with the California Prompt Payment Act, with undisputed invoices paid within 45 days. The procurement also mandates compliance with prevailing wage laws, the Americans with Disabilities Act, and various executive orders regarding Russia sanctions and labor practices.
Other Communication and Energy Wire Manufacturing

POSTED

23 days ago

DEADLINE

in 22 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS