Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

This Government Contract opportunity from Georgia was posted on June 23, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

HVAC System Installation

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238220
New
Replace HVAC Systems in the following buildings on our campus –1.) 1091 – Glazing/Welding/Heavy Mechanics Bldg
Solicitation # 26-140
This project involves the replacement of a failing 10-ton gas-fired packaged HVAC unit at the Atterbury Job Corps Center in Edinburgh, Indiana, specifically within Building 1091. The contractor must install a new 12.5 SEER packaged unit utilizing non-R22 refrigerants, such as R-410A or R-454B, while reusing existing electrical disconnects, ductwork, and thermostat wiring. Following installation, the old unit and any recovered refrigerant must be labeled and left at the maintenance building for parts salvage. The award will be based on best value, evaluating price, quality, past performance, and schedule, rather than the lowest price alone. Eligible bidders must be registered in SAM.gov with a valid Unique Entity ID and hold a valid Indiana contractor's license. Proposals must be submitted as a single lump sum with a detailed cost breakdown and include a 90-day bid guarantee. Compliance with the Davis Bacon Act wage determinations and FAR 52.222-41(g) is mandatory. The contractor is required to provide a sequenced construction schedule within 10 days of the Notice to Proceed and must maintain specific automobile and workers' compensation insurance naming Adams and Associates, Inc. as an additional insured. Final acceptance is subject to a substantial completion walk-through, the correction of punch list items within 14 days, and the submission of certified payroll records and lien releases.
Adams & Associates, Inc.

POSTED

about 5 hours ago

DEADLINE

in 6 days
NAICS: 238220
New
CBP#3980 Cast Iron Replacement (Truth Dorm)
Solicitation # CBP#3980
Management & Training Corporation (MTC) is soliciting fixed-price, lump sum bids for a subcontracting opportunity to replace damaged cast-iron sanitary piping at the Charleston Job Corps Center in West Virginia. The scope of work involves removing and replacing a 4-inch no-hub cast-iron sanitary stack and associated piping within Room H-121 and adjacent rooms, which requires the demolition of approximately 40 cinder blocks and the subsequent restoration of the wall. The project is estimated between 25,000 and 100,000 dollars. Bids are due by October 5, 2026, and must be submitted via email to the designated points of contact. To be considered for award, bidders must complete a physical site visit, provide a detailed cost breakout on company letterhead, and submit a bid bond guarantee of 20 percent if the bid is 25,000 dollars or more. Awarded contractors with bids at or above 25,000 dollars must also provide performance and payment bonds for 100 percent of the contract price from a surety with at least an A- rating. The contract requires strict adherence to Construction Wage Rate Requirements and Davis-Bacon Act prevailing wages for Kanawha County. Additionally, bidders must provide a 12-digit Unique Entity ID, a 9-digit Tax ID, and complete the MTC Supplier Self-Certification form, including disclosures regarding debarment and suspension under FAR 52.209-6 for subcontracts exceeding 30,000 dollars. Final acceptance is contingent upon a successful leak inspection and the submission of closeout documents, including a Certificate of Release of Liens and Operation and Maintenance manuals.
Management & Training Corporation

POSTED

about 5 hours ago

DEADLINE

in 7 days
NAICS: 238220
New
Replace HVAC Systems in the following buildings on our campus –1.) ABL Dormitory
Solicitation # 26-141
Adams & Associates, Inc. is soliciting a single lump sum subcontract for the replacement of HVAC condensing units and compatible coils at the Atterbury Job Corps Center ABL Dormitory in Edinburgh, Indiana. The project requires replacing existing R-22 Bryant units with new 12.5 SEER packaged units utilizing non-R22 refrigerants, such as R-410A or R-454B. The scope includes the reuse of existing electrical disconnects, ductwork, and thermostat wiring, while all recovered refrigerant must be labeled and left on-site. Work must commence within 14 days of the Notice to Proceed, and a sequenced construction schedule must be submitted within 10 days of that notice. Eligible offerors must be registered in SAM.gov with a valid Unique Entity ID and hold a valid State of Indiana contractor's license. A mandatory site visit was scheduled for September 23, 2026, with proposals due by October 5, 2026. Award is based on best value, evaluated by price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). Requirements include compliance with EPA, OSHA, and Davis-Bacon Act wage determinations, as well as specific insurance coverages naming Adams and Associates, Inc. as an additional insured. Final payment is subject to net 30 terms and requires the submission of certified payroll records, release of liens, and a completed SF 1413.
Adams & Associates, Inc.

POSTED

about 5 hours ago

DEADLINE

in 6 days
NAICS: 238220
New
CBP#9772 HVAC Air Handling Unit (AHU) and Ductwork Cleaning Services
Solicitation # CBP#9772
Management & Training Corporation (MTC) is seeking bids for a fixed-price, lump sum subcontracting opportunity to provide comprehensive HVAC air handling unit (AHU) and ductwork cleaning services at the Edison Job Corps center in Edison, New Jersey. The scope of work involves the cleaning of twelve AHUs and associated components across two dormitory facilities, including the vacuuming and brushing of interior surfaces and the thorough cleaning of all accessible heating and cooling coils. The estimated price range for this project is between 100,000 and 250,000 dollars. Bids must be submitted via email by October 16, 2026, at 3:00 PM EST. To be considered for award, bidders must complete a mandatory physical site visit and sign an attendance roster. Required submission documents include the MTC Bid for Lump Sum Contract form, a detailed cost breakout on company letterhead, a completed supplier packet with W-9 and self-certification, proof of insurance, and three professional references. For bids equal to or exceeding 25,000 dollars, a bid bond of 20 percent of the base bid is required, and the awarded contractor must provide performance and payment bonds from a surety company with at least an A- rating. The contract requires strict adherence to federal and state regulations, including the Davis-Bacon Act for prevailing wage rates as specified in wage determination NJ20250036, and OSHA 30 CFR 1929 for construction site safety. Compliance with FAR clauses is mandatory, including reporting for first-tier subcontractors under FFATA for awards of 40,000 dollars or more and disclosure of debarment status for awards exceeding 30,000 dollars. Award decisions will be based on overall best value, and the contractor must provide weekly certified payroll reports and use AIA G7/02 and G7/03 forms for progress payment applications.
Management & Training Corporation

POSTED

about 5 hours ago

DEADLINE

in 18 days
NAICS: 238220
New
Replace HVAC Systems in the following buildings on our campus –1.) ABL Dormitory
Solicitation # 26-141
Adams & Associates, Inc., operating for the U.S. Department of Labor, is soliciting a single lump sum contract to replace the HVAC systems at the Atterbury Job Corps Center ABL Dormitory in Indiana. The project requires replacing existing R-22 Bryant air-cooled condensing units and coils serving common areas and dormitory wings A, B, C, and D with new 12.5 SEER packaged units utilizing non-R22 refrigerants such as R-410A or R-454B. The contractor must reuse existing electrical disconnects, ductwork, and thermostat wiring, and all recovered refrigerant must be labeled and left on-site. Work must commence within 14 days of the Notice to Proceed, and the contractor is required to provide a sequenced construction schedule within 10 days of that notice. Award will be based on best value, with evaluation weighted across price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). Mandatory requirements for bidders include attending a site visit on September 23, 2026, maintaining an active SAM.gov registration with a Unique Entity ID, and holding a valid State of Indiana Contractor's License. Proposals must be submitted by October 5, 2026, and include a detailed cost breakdown, insurance certificates naming Adams and Associates, Inc. as an additional insured, and certification of compliance with Davis Bacon Act wage rates. Final payment is subject to Net 30 terms and requires the submission of certified payroll records, a completed SF 1413, and the release of liens from all subcontractors.
Adams & Associates, Inc.

POSTED

about 5 hours ago

DEADLINE

in 6 days
NAICS: 238220
New
WOJC - Buried Domestic Hot Water (DHW) Pipe Repair
Solicitation # WOJC – Buried Domestic Hot Water (DHW) Pipe Repair
Education and Training Resources is seeking quotes for a subcontracting opportunity to repair a compromised buried domestic hot water pipe at the Westover Job Corps Center in Chicopee, Massachusetts. The scope of work requires the contractor to provide all labor, materials, and equipment to excavate a trench approximately 15 linear feet long and 8 feet deep, remove and repair up to 10 linear feet of piping with a diameter up to 4 inches, and install up to 10 linear feet of insulation. The project requires adherence to industry standards, local construction codes, and safety regulations, including OSHA and NFPA Standard No. 101. A one-year equipment and workmanship warranty is required, and final project acceptance is conducted by the center upon the completion of a signed punch list. Bids are due by 4:00 PM on October 2, 2026, and must include a completed bid sheet with a detailed cost breakdown, a proposed service schedule, and proof of required Massachusetts licensing. Mandatory administrative documentation includes a W-9, Vendor Acknowledgement Form, Certificates of Insurance, and an Anti-Lobbying Certification. Winning bidders must possess an active SAM.gov registration and a Unique Entity ID. The contract is subject to federal labor standards, including the Davis-Bacon Act and Service Contract Act, requiring the submission of weekly certified payroll reports. Award selection is at the sole discretion of ETR and is not based exclusively on the lowest bid.
Westover Job Corps Center

POSTED

about 5 hours ago

DEADLINE

in 3 days
NAICS: 238220
New
CBP6404 Bldg. 63B Drain Replacement
Solicitation # CBP6404
Management and Training Corporation (MTC) is seeking bids for a fixed-price, single lump sum subcontracting opportunity to perform plumbing repairs at the San Diego Job Corps Center in Imperial Beach, California. The project, identified as solicitation CBP6404, focuses on the replacement of the building 63B student restroom piping system to address three specific root intrusions identified during a September 2026 camera inspection. The scope of work includes locating and removing damaged pipe sections, installing compatible replacement piping, saw-cutting and removing concrete, and performing all necessary backfilling, compaction, and surface restoration. The estimated price range for this effort is between 0 and 25,000 dollars. Bids must be submitted via email to the designated points of contact by 3:00 PM PST on October 13, 2026. To be considered responsive, offerors must use the MTC Bid for Lump Sum Contract form, provide a detailed cost breakout on company letterhead, and complete a mandatory physical site visit. For bids equal to or greater than 25,000 dollars, a bid bond of 20 percent of the base bid is required, and the awarded contractor must provide performance and payment bonds from a surety with at least an A- rating. This is a small business set-aside opportunity requiring compliance with Davis-Bacon Act prevailing wages as per the San Diego County wage determination and adherence to various FAR clauses, including those regarding the Buy American Act and the Combating Trafficking in Persons. Final acceptance of the work is contingent upon a successful inspection by San Diego Job Corps Facilities Management to ensure all three root intrusion locations are repaired and operational. Payment is processed through pay applications using AIA G702 G703 forms or similar formats, with weekly certified payroll reports required. Final payment is subject to the submission of a Notice of Final Completion, a Certificate of Release of Liens, and complete Operation and Maintenance manuals. All work must be performed during the Center's regular business hours unless otherwise approved.
San Diego Job Corps Center

POSTED

about 5 hours ago

DEADLINE

in 15 days

AI Contract Overview

Show more

The contract titled HVAC System Installation under NAICS code 238220 pertains to the supply and installation of heating, ventilation, and air conditioning units along with associated ductwork for a project managed by the Georgia office of the Department of Transportation. The solicitation was posted on June 23, 2026, with a response deadline set for July 31, 2026, at 7:00 PM Eastern Time. This is a subcontract opportunity without a designated set-aside status, meaning it is open to any qualified bidder regardless of business size or certification. The place of performance is located within Georgia, though specific city or zip details are not provided. All bids must be submitted through the designated online portal linked in the contract data. The work requires full system integration, including equipment delivery, installation, and commissioning to meet operational standards for the agency’s facilities.

General Info

HVAC system installation in Georgia for DOT, bid deadline July 31, 2026, open to all qualified bidders.

Documents

This scope was carved out of RFP 484-073126.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Comprehensive Right of Way Support Services for the Transportation Investment Act Program

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGeorgia → Department of Transportation-2
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supply and installation of heating, ventilation, and air conditioning units and ductwork.

More opportunities from Georgia → Department of Transportation-2

Same awarding agency

NAICS: 541330
New
SLED
PNA 484-112326
Solicitation # PNA 484-112326
The Georgia Department of Transportation is issuing a Public Notice of Advertisement for statewide On-Call Roadway Design Services under solicitation number PE-48401-RFQ-2027-000000628. The scope of work involves a variety of projects including rural and urban roadway design for two-lane and multi-lane roads, rural and urban interstate highway design, and urban widening or reconstruction in residential, commercial, or industrial areas. Additionally, the services encompass specialized studies such as traffic operations, landscape architecture, traffic control systems, hydrogeological studies, bicycle and pedestrian facilities, and erosion and pollution control. All work must adhere to the GDOT Design Policy Manual and the AASHTO Policy on Geometric Design of Highways and Streets. The Request for Qualifications is expected to be issued on October 22, 2026, with statements of qualifications due by November 23, 2026. A strict communication restriction is currently in effect, prohibiting firms from discussing the solicitation or scope with GDOT staff, the Commissioner, or Board Members, with violations potentially leading to the rejection of a respondent's submittal. For contract estimation and payment, indirect cost rates for prime and subconsultants will be based on FAR cost principles per 48 CFR 31, capped at a maximum rate of 150 percent. The primary point of contact for this effort is Sharon Cyrus-Bogle within the GDOT Office of Procurement, Engineering and Design Services.
Engineering Services

POSTED

5 days ago

DEADLINE

in 24 days
View Details
NAICS: 237310
SLED
NTC-484-101626
Solicitation # PE-48401-RFQ-2026-000000627
The Georgia Department of Transportation has issued solicitation PE-48401-RFQ-2026-000000627 for various roadway and bridge construction projects across Georgia. Published on September 18, 2026, with a response deadline of October 16, 2026, the scope of work includes pavement milling and patching, the construction of bridges and approaches, installation of concrete curbs, gutters, and retaining walls, as well as the application of thermoplastic pavement markings and LED lighting. Key deliverables involve completed roadway improvements, drainage systems, traffic control implementation, and site restoration through permanent grassing. Bidders must submit proposals electronically via the AASHTOWare Project Bids software and provide a proposal guaranty in the form of a certified check, cashier's check, or bid bond. A current Certificate of Qualification is required for bids exceeding 2,000,000 dollars unless specifically waived. The contract mandates compliance with the Davis-Bacon and Related Acts for prevailing wages, updated Buy America special provisions for federal projects, and the State of Georgia's Statewide Sexual Harassment Prevention Policy. Additionally, bidders must document proposed Disadvantaged Business Enterprise utilization goals and ensure that all surety companies are licensed in Georgia and listed in the Federal Register.
Highway, Street, and Bridge Construction

POSTED

10 days ago

DEADLINE

in 18 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS