HVAC System Replacement - Phase 1
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The City of Stanton is initiating Phase 1 of its HVAC System Replacement project, which encompasses a full turnkey upgrade of rooftop air conditioning units at City Hall located at 7800 Katella Avenue. Work includes mobilization and demobilization, verification of improvement boundaries with city authorities, securing permits and inspections, and comprehensive removal and disposal of existing 15 or 17.5 ton rooftop units from the Stanton Corporate Yard at 8100 Pacific Street to the installation site. The contract requires the complete installation of new rooftop AC units, including associated roof framing, roofing repairs, curbing, duct modifications, gas and condensation piping, and integration with existing systems. All work must ensure proper airflow through testing and balancing of supply air CFM, installation of new thermostats, commissioning of the entire HVAC system, and cleaning of existing ductwork. Additional requirements involve temporary HVAC units, electrical work including fire alarm system shutdown protocols, zone damper adjustments, and miscellaneous carpentry, painting, patching, and demolition tasks necessary for full system integration and functionality. The project demands meticulous coordination of HVAC and electrical systems with thorough testing of every component to ensure operational compliance and efficiency. All materials and labor must be provided to deliver a fully functional, code-compliant system with no outstanding work. The City of Stanton serves as the contracting authority with Han Sol Yoo, Civil Engineer, listed as the primary point of contact for project inquiries. The work is set to occur within the city limits of Stanton, California, with a posted date of September 23, 2025, under a forecasted solicitation. While specific financial or bid details are not provided, the scope implies a high level of technical expertise, regulatory adherence, and integration capability across mechanical, electrical, and structural disciplines to complete the project as a cohesive, turnkey solution.
General Info
Agency
NAICS
Place of Performance
Stanton, CA, 90680Set-Aside
Documents
(1)AI Contract Breakdown
Uniform Contract FormatWhat is UCF?
Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.
Timeline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
