Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

HWY 29 & Trubody Site Telecommunication Facility / Site Plan Approval Modification (P26-00210-SPA)

Forecast
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

NAICS

N/A

Place of Performance

State Highway 29 and Ragatz Lane, Napa, CA, 94558

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more

Full Description

Show more
Site Plan Approval Modification to modify an existing telecommunication facility to include: a) removal and replacement of nine (9) antennas; b) removal of twelve (12) Remote Radio Units (RRU’s); and, c) installation of three (3) RRU’s.

More opportunities from California → Napa County

Same awarding agency

NAICS: 541620
SLED
Napa County Regional Climate Action and Adaptation PlanThe Napa County Regional Climate Action and Adaptation Plan is a coordinated regional initiative led by Napa County in partnership with the cities of American Canyon, Calistoga, Napa, St. Helena, and the Town of Yountville, aimed at reducing greenhouse gas emissions and enhancing climate resilience across the county. The plan targets key emission sources including vehicle travel, electricity use, natural gas consumption, and local land use practices, with measurable strategies organized across sectors such as energy, transportation, waste, and land use. Implementation timelines span from near-term actions starting in 2026 to long-term goals extending through 2045, with annualized cost estimates ranging from $386,085 in 2030 to $718,500 by 2045, reflecting projected investments in emissions reduction and adaptation measures. The plan includes specific project actions with clear performance targets and financial projections, though it does not conform to traditional federal procurement structures or include standard FAR clauses, contract line items, or formal bid evaluation criteria. The plan requires rigorous environmental compliance under CEQA, Cal/OSHA, CALGreen, and state and federal endangered species protections, with mandatory biological surveys, qualified biologist oversight, and habitat conservation measures. Construction and project activities must adhere to strict protocols including equipment decontamination to prevent invasive species spread, use of certified weed-free materials, installation of tire track stations, and implementation of spill prevention plans. All personnel must undergo environmental training, and work may be halted immediately if special-status species are detected. Mitigation efforts must include permanent conservation of affected lands via easements, and coordination with CDFW and USFWS is required for any project impacting protected species or habitats. Submission of proposals is due by August 31, 2026, via email, postal mail, or through an online portal, with oversight coordinated by Jesse Gutierrez, Principal Planner – Sustainability at Napa County’s Department of Planning, Building and Environmental Services. While the initiative involves significant environmental and infrastructure investment, it is structured as a policy implementation framework rather than a competitive procurement, with no formal contracting officer, COR, COTR, payment office, or federal accounting identifiers designated.
Environmental Consulting Services

POSTED

4 months ago

DEADLINE

N/A
View Details
NAICS: 541620
SLED
Fulton Ranch Vineyard Agricultural Erosion Control Plan (ECPA) #P23-00326-ECPA
Solicitation # P26-00176-ECPA
The contract pertains to the implementation of an agricultural erosion control plan for the development of a 4.79-acre vineyard on three parcels within a larger 182.78-acre property in Calistoga, California, with approximately 3.66 net acres designated for planting in five distinct vineyard blocks. It authorizes land-disturbing activities on slopes exceeding 5%, including the clearing of oak woodland, Douglas fir forest, and ruderal vegetation within defined limits, as well as earthmoving, land contouring, and the installation and ongoing maintenance of erosion and runoff control measures necessary to support agricultural infrastructure. The project was approved by the Napa County PBES Director on July 14, 2026, and the associated plan is formally identified as ECPA #P23-00326-ECPA. The activity is governed under the jurisdiction of Napa County, with the place of performance specified as Calistoga, CA 94515, and the primary point of contact is Pamela Arifian, Planner III, who can be reached via email or phone for administrative and regulatory inquiries. Dirk Fulton, Manager and General Partner, is listed as a secondary contact, indicating direct ownership or operational involvement in the project. The plan is publicly accessible through the California Environmental Quality Act database via the linked online portal, ensuring transparency and compliance with state environmental standards. No set-aside or NAICS classification is applied, reflecting its status as a local agricultural development subject to county-level environmental review.
Environmental Consulting Services

POSTED

4 months ago

DEADLINE

N/A
View Details
NAICS: 541620
SLED
1260 Shady Brook Vineyard Track I Agricultural Erosion Control Plan (ECPA) P25-00011-ECPA
Solicitation # P25-00011-ECPA
The project, identified as P25-00011-ECPA, involves the development of approximately 1.3 gross acres of vineyard within a 41.8-acre parcel located at 1260 Shady Brook Lane in Napa, California. Approved by Napa County on June 29, 2026, the scope of work includes land disturbing activities on slopes greater than 5%, the clearing of oak woodland and ruderal lands, earthmoving, land contouring, and the installation of agricultural infrastructure. The project is supported by a Mitigated Negative Declaration under CEQA, concluding that the development will not have a significant environmental effect provided specific mitigation measures are implemented. Key technical requirements include a soil loss analysis and hydrologic analysis to ensure that sediment delivery and peak runoff do not exceed pre-project levels. Environmental protections are central to the contract, requiring the preservation of oak woodlands, pre-construction surveys for Crotch's bumble bee between April and August, and the installation of protective fencing around Napa bluecurl and Green monardella populations. Additionally, a water availability analysis confirmed that groundwater demands for the vineyard are within the site's recharge capacity. The project is managed by Daniel and Deborah Chen and implemented by Applied Engineering, Inc., with oversight from the Napa County Planning, Building and Environmental Services Department.
Environmental Consulting Services

POSTED

5 months ago

DEADLINE

N/A
View Details
NAICS: 541330
SLED
230 Long Ranch Road LLC Vineyard Development Agricultural Erosion Control Plan #P24-00114-ECPA
Solicitation # P24-00114-ECPA
The 230 Long Ranch Road LLC Vineyard Development project, identified by Agricultural Erosion Control Plan #P24-00114-ECPA, involves the development of a vineyard on a 48.42-acre property in St. Helena, California. Approved by the Napa County PBES Director on June 8, 2026, the scope of work includes clearing vegetation, earthmoving, and land contouring to develop approximately 14.8 to 18.8 gross acres of vineyard, consisting of four vineyard blocks with approximately 12.1 to 15.8 net planted acres. The project specifically addresses land disturbing activities on slopes greater than 5% and requires strict adherence to erosion control measures to ensure no net increase in soil loss or runoff. Environmental compliance is a central component of the contract, governed by the California Environmental Quality Act (CEQA). A Mitigated Negative Declaration was adopted following a public review period from November 27 to December 27, 2025. Key environmental mandates include the retention of at least 3.0 acres of chamise alliance habitat and the preservation of 4.1 acres of Scrub Interior Live Oak habitat. The project also requires preconstruction surveys for nesting birds, protection of special-status plant species, and a three-year monitoring period for any replaced vegetation. Technical adequacy has been verified by the Napa County Engineering Division, and the project is subject to a specific grading season from April 1 through September 15. Administration of the project is handled on a time and materials basis, with the Napa County Planning Division overseeing inspections of fencing and habitat preservation before earthmoving begins.
Engineering Services

POSTED

6 months ago

DEADLINE

N/A
View Details
NAICS: 541620
SLED
Crush Partners Vineyard Track I Agricultural Erosion Control Plan Application (ECPA) P25- 00003-ECPA
Solicitation # P25-00003-ECPA
The Crush Partners Vineyard project, identified by permit P25-00003-ECPA, involves the development of approximately 18.3 gross acres of vineyard within a 27.98-acre parcel located on Wooden Valley Road in Napa, California. The scope of work includes clearing grassland, earthmoving with approximately 1,000 cubic yards of cut and fill, and the installation of erosion and runoff control measures on slopes greater than 5 percent. The project consists of 7.8 acres of replanted existing vineyard and 7.8 acres of new vineyard, totaling approximately 15.6 net planted acres. Performance requirements include maintaining a permanent cover crop and vineyard avenues with a minimum vegetation cover density of 75 percent to prevent soil loss and manage peak storm flow. The project was approved by Napa County on August 3, 2026, following a Negative Declaration under CEQA indicating no significant environmental impacts. Key technical requirements include a 35-foot setback from ephemeral streams, adherence to a grading season from April 1 through September 15, and preconstruction nesting bird surveys between February 1 and August 31. The project is supported by comprehensive analyses, including a Water Availability Analysis for groundwater use, a Landslide Hazard Evaluation, and a Biological Resources Reconnaissance Survey to protect oak woodlands and special-status species. Administrative terms specify that the applicant, Rob Lloyd, is responsible for all county processing fees, with payments due within 30 days of billing.
Environmental Consulting Services

POSTED

6 months ago

DEADLINE

N/A
View Details
NAICS: 237990
SLED
AXR Napa Valley Winery - Major Use Permit Modification, Variance, and Viewshed
Solicitation # P22-00417
The AXR Napa Valley Winery project, approved by the Napa County Planning Commission on June 3, 2026, involves a major modification to Winery Use Permits P08-00099 and P04-0541. The scope of work includes the construction of a 17,190 square foot type I wine cave and the conversion of several existing structures for tasting and hospitality purposes, including a 1,492 square foot barrel storage building, a 1,204 square foot outdoor crush/tank pad, and the 4,147 square foot main floor of the historic Hirsch residence for office and tasting room use. These modifications are intended to support an expanded marketing program and an increase in both employees and visitor traffic at the St. Helena, California location. Infrastructure improvements are a central component of the project, featuring water and wastewater system upgrades and the installation of a left turn lane and driveway modifications on Highway 29. To facilitate these improvements, the project includes a variance to the 600-foot winery setback from SR 29 for aboveground wastewater structures and an Administrative Viewshed Permit for cave portals and utility improvements on slopes between 15 and 18 percent. The project is governed by a Mitigated Negative Declaration, with specific mitigation measures and monitoring plans adopted as conditions for approval. Administrative oversight is managed by Hannah Spencer of the Napa County Planning, Building, and Environmental Services Department.
Other Heavy and Civil Engineering Construction

POSTED

6 months ago

DEADLINE

N/A
View Details

Research this forecast and prepare for the solicitation

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS