Hydraulic Dredging Services

Active
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for Hydraulic Dredging Services, issued by the Department of Defense through the W076 Endist Galveston agency, involves the excavation and removal of approximately 870,000 cubic yards of sandy material. The project requires the use of hydraulic dredging equipment to extract the material and a pipeline system for slurry transport to designated placement areas. The work is scheduled to be performed in Matagorda and falls under NAICS code 238910. The opportunity was posted on December 19, 2025, and is managed as a subcontract for specialized dredging operations.

General Info

DoD subcontract for hydraulic dredging of 870,000 cubic yards of sand in Matagorda.

NAICS

238910 - Site Preparation Contractors

Place of Performance

Matagorda, TX, USA

Set-Aside

NONE

Documents

This scope was carved out of W912HY26RA005.

The full solicitation package (4 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Mouth of Colorado River (MOCR) Maintenance Dredging and Sargent Beach Beneficial Use (BU) Placement in Matagorda County, Texas

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W076 Endist Galveston
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Excavation and removal of approximately 870,000 cubic yards of sandy material using hydraulic dredging equipment, with slurry transport via pipeline to designated placement areas.

Similar Contracts

Same NAICS industry code

NAICS: 238910
New
SLED
DEMOLITION OF THE CAMP HILL SQUARE APARTMENTS
Solicitation # 2027-RFP-033
Solicitation 2027-RFP-033 is a request for proposals issued by the Housing Opportunities Commission of Montgomery County (HOC) for the demolition of the Camp Hill Square Apartments in Gaithersburg, Maryland. The project scope involves the demolition of five apartment buildings containing 51 vacant units and a management office, including the removal of all above-grade structures, slabs, foundation walls, footers, and lead walks. While above-grade utilities must be removed, underground utilities are to be capped or abandoned in place, and all asphalt, curbs, and gutters are to remain. Additionally, the contractor is responsible for removing dumped materials from the neighboring Emory Grove Village parcel. The initial period of performance is four months from the Notice to Proceed, and the contractor is responsible for obtaining all necessary raze permits and adhering to the Montgomery County Approved Sediment Control Plan. Proposals must be submitted via the OpenGov Procurement Portal by November 13, 2026, at 12:00 pm. Evaluation is points-based, with 20% of the score weighted toward the schedule and 15% toward the price proposal. Award criteria emphasize safety, expedited completion, and quality assurance. Mandatory requirements include 100% payment and performance bonds, comprehensive insurance, and strict adherence to HOC Contractor and Subcontractor Background Screening Requirements. Compliance with the HOC Works Program, Davis-Bacon Wages, Maryland Prevailing Wage Laws, and HUD certifications regarding debarment and suspension is required. Payment terms include a 30-day processing window following approval, with a 5% retainage held until final acceptance by HOC.
Real Estate

POSTED

about 8 hours ago

DEADLINE

in 16 days
View Details

More opportunities from Department Of Defense → W076 Endist Galveston

Same awarding agency

NAICS: 237990
New
Federal
FY27 Texas City Ship Channel Main Channel and Turning Basin
Solicitation # W912HY27X1CT1
The U.S. Army Corps of Engineers, Galveston District, is conducting a sources sought synopsis for the FY27 Texas City Ship Channel Main Channel and Turning Basin maintenance dredging project. This preliminary planning effort seeks to identify capable and qualified industry partners, including various small business categories such as 8(a), HUB-Zone, SDVOSB, and WOSB. The scope of work involves performing maintenance dredging using a pipeline, hopper, or mechanical dredge, with an estimated construction price range between 10 million and 25 million dollars. The project is expected to have a completion timeframe of 240 calendar days, with an anticipated award date in August 2027. Interested firms must be registered in SAM.gov and provide their UEI and CAGE codes. Responses are due by November 7, 2026, and must include evidence of technical competence, such as three examples of comparable projects completed within the last five years and proof of bonding capacity, including a 20 percent bid bond and 100 percent performance and payment bonds. All work must comply with the USACE Safety and Health Requirements Manual EM 385-1-1 and applicable federal, state, and local regulations. The procurement falls under NAICS code 237990 and is subject to FAR 52.219-14 limitations on subcontracting.
Other Heavy and Civil Engineering Construction

POSTED

about 11 hours ago

DEADLINE

in 10 days
View Details
NAICS: 237990
New
Federal
Gulf Intracoastal Waterway High Island to Causeway with Channel to Port Bolivar Maintenance Dredging
Solicitation # W912HY26BA019
Solicitation W912HY26BA019 is a firm-fixed-price contract issued by the U.S. Army Corps of Engineers, Galveston District, for maintenance dredging of the Gulf Intracoastal Waterway from High Island to Causeway, including the channel to Port Bolivar, in Texas. The project focuses on addressing shoaling within tributary channels across Chambers, Galveston, and Brazoria Counties. The scope is divided into a primary schedule involving approximately 959,000 cubic yards of dredging to be completed within 270 calendar days of the notice to proceed, along with five optional work items. These options include dredging at the Galveston Alternate Route, Offatts Bayou Channel, and Bolivar Ferry Channel, as well as beneficial use placement at the Joycelyn Nungaray area. The procurement is conducted via sealed bidding, with the award granted to the responsible bidder offering the most advantageous price. Bidders must provide a bid guarantee of 20 percent of the offer or 3 million dollars, whichever is less, and furnish 100 percent performance and payment bonds upon award. Key administrative requirements include electronic invoicing through Wide Area WorkFlow and compliance with the Buy American Act. The solicitation has been modified by two amendments, the most recent of which extended the bid opening date to November 3, 2026. Performance for the primary CLINs is expected within 165 calendar days from the notice to proceed, while option items have shorter specific lead times ranging from 5 to 25 days.
Other Heavy and Civil Engineering Construction

POSTED

1 day ago

DEADLINE

in 6 days
View Details
NAICS: 237990
New
Federal
FY26 HOUSTON SHIP CHANNEL, TEXAS BAYPORT FLARE HOPPER DREDGING
Solicitation # W912HY26BA018
The FY26 Houston Ship Channel, Texas Bayport Flare Hopper Dredging project is an unrestricted sealed bid solicitation issued by the US Army Engineer District Galveston. The project involves maintenance dredging of the Houston Ship Channel adjacent to the Bayport Flare and the Bayport Flare adjacent to the Bayport Ship Channel across Galveston, Harris, and Chambers Counties, Texas. Dredged materials are to be transported to and disposed of in Ocean Dredged Material Disposal Site zones D and F. The estimated price range for the project is between $25,000,000 and $100,000,000, with a performance period requiring work to commence within 10 calendar days of the notice to proceed and reach completion within 85 calendar days. Key technical requirements include the use of hopper dredging and adherence to the USACE National Dredging Quality Management Program. Contractors must implement an Endangered Species Protection Plan, specifically regarding sea turtle protection and relocation, which are listed as option line items. Contract administration will be managed through the Resident Management System and the Construction Management Platform for handling Controlled Unclassified Information. Bidders are evaluated based on total price and qualifications, with a 10 percent price evaluation preference granted to HUBZone small business concerns. Payments are processed electronically via the Wide Area WorkFlow system under fixed-price construction terms.
Other Heavy and Civil Engineering Construction

POSTED

1 day ago

DEADLINE

in 13 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS