Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Government Contract opportunity from Vermont was posted on May 4, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Hydrologic and Hydraulic Analysis with Dam Failure Modeling

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The contract seeks to perform updated hydrologic and hydraulic analyses focused on evaluating spillway capacity, flood routing, and dam failure inundation modeling to accurately determine the hazard classification of a dam. These analyses are critical for assessing potential risks associated with dam failure and informing emergency preparedness and infrastructure safety measures. The work will involve advanced modeling techniques to simulate flood scenarios under various failure conditions and to assess the downstream impact zones, ensuring compliance with current standards for dam safety evaluation. The contract is structured as a subcontract under NAICS code 541320, indicating it involves engineering services. It was posted on May 4, 2026, with a response deadline of June 19, 2026, providing a six-week window for proposers to submit their bids. Although the contracting agency is listed as the Vermont Department of Economic Development, the specific location of performance and point of contact details are not provided, suggesting the work may apply statewide or to a system of dams under state jurisdiction. This effort is part of broader infrastructure safety initiatives focused on enhancing public safety through precise risk assessment and data-driven hazard classification.

General Info

Perform hydrologic and hydraulic analyses to assess spillway capacity and dam failure hazards.

Agency

Vermont → Department of Economic DevelopmentView Agency

NAICS

541320 - Landscape Architectural ServicesView NAICS

Place of Performance

VT, USA

Set-Aside

NONE

Documents

This scope was carved out of 73704.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Fairfield Dam Inspection

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyVermont → Department of Economic Development
ContactsNo contacts available
OfficeN/A
Organization / Agency
Vermont → Department of Economic Development
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Perform updated hydrologic and hydraulic analyses, including spillway capacity evaluation, flood routing, and dam failure inundation modeling to determine hazard classification.

More opportunities from Vermont → Department of Economic Development

Same awarding agency

NAICS: 541330
New
SLED
Centerville Brook AOP Obstructions Design Planning Hyde Park
Solicitation # 75140
The Centerville Brook AOP Obstructions Design Planning project in Hyde Park, Vermont, focuses on restoring aquatic organism passage and improving stream connectivity. The primary objective is to advance the Centerville Brook Dam removal from a 30 percent preliminary design to a 100 percent shovel-ready final design. This scope includes full structural removal of the dam, stream channel restoration, sediment management of approximately 200 cubic yards of impounded material, and the relocation of a dry hydrant to a viable downstream location at Brook Road. The project aims to eliminate flood risks, reduce streambank erosion, and enhance habitat complexity through the use of timber grade controls and Beaver Dam Analogs. Additionally, the project has expanded to include preliminary 30 percent design planning for two downstream culverts at Centerville Road and Brook Road. These structures currently act as perched barriers to native brook trout and other aquatic species. The design process will evaluate whether these culverts require full replacement or can be improved through aquatic organism passage retrofits. Managed by the Lamoille County Planning Commission and supported by grants from the Lake Champlain Basin Program and the New England Interstate Water Pollution Control Commission, the initiative seeks to establish a natural stream channel to improve water quality and flood water capacity.
Engineering Services

POSTED

1 day ago

DEADLINE

in 20 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS