Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Hydrotechnical and Hydraulic Modeling Services

Active
International

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for Hydrotechnical and Hydraulic Modeling Services involves performing critical hydrologic and hydraulic analyses for prime contractors working on dam safety projects for the City of Moncton. The scope of work includes determining Probable Maximum Flood and Intensity-Duration-Frequency curves, as well as utilizing HEC-HMS for hydrologic modeling and HEC-RAS for hydraulic modeling. Additionally, the contractor is responsible for conducting dam breach analyses and inundation mapping in strict accordance with CDA Dam Safety Guidelines. The primary deliverables for this engagement consist of comprehensive flood study reports, detailed breach analysis maps, and the associated hydraulic model files. This opportunity is categorized under NAICS code 541330 and was posted on August 4, 2026, with a response deadline of September 21, 2026.

General Info

Subcontract for dam safety hydrologic and hydraulic modeling services for the City of Moncton.

Agency

City of Moncton / Ville de MonctonView Agency

NAICS

541330 - Engineering ServicesView NAICS

Place of Performance

CAN

Set-Aside

NONE

Documents

This scope was carved out of RFP26-048.

The full solicitation package (19 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Dam Safety Review - Tower Road and Turtle Creek Dams

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCity of Moncton / Ville de Moncton
ContactsNo contacts available
OfficeN/A
Organization / Agency
City of Moncton / Ville de Moncton
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs hydrologic and hydraulic analyses for prime contractors on City of Moncton dam safety projects. Determines PMF and IDF, performs hydrologic modelling using HEC-HMS, hydraulic modelling using HEC-RAS, and conducts dam breach analysis and inundation mapping per CDA Dam Safety Guidelines. Delivers flood study reports, breach analysis maps, and hydraulic model files.

Similar Contracts

Same NAICS industry code

NAICS: 541330
New
Scattergood GS. Units 1&2 Green Hydrogen-Reaady Modernization
Solicitation # scattergood-gs-units-12-green-hydrogen-reaady-modernization
Kiewit Power Constructors Co. is soliciting sub-quotes for the Scattergood GS Units 1&2 Green Hydrogen-Ready Modernization project, owned by the City of Los Angeles Department of Water and Power. The project requires a diverse range of technical and professional services, including civil, structural, mechanical, electrical, and instrumentation engineering support, as well as utility locating, geotechnical investigations, BIM/3D modeling, and environmental compliance monitoring. Additional required scopes include land surveying, LIDAR, hazardous materials surveys, and CPM scheduling. This solicitation specifically seeks participation from Disadvantaged Business Enterprises (DBE), Minority Business Enterprises (MBE), Women Business Enterprises (WBE), and Other Business Enterprises (OBE) that hold valid certifications from recognized agencies such as the SBA or CUCP. Interested firms must contact Kiewit to receive an Invitation to Bid via the Building Connected electronic system. Responsive bidders are required to hold a valid California Contractor’s license and provide acceptable insurance. Furthermore, responsible subcontractors and material contractors must provide bonding for 100% of their contract value, though Kiewit will reimburse bond premiums. Kiewit is a signatory to several collective bargaining agreements and prioritizes bidders who can maintain labor harmony on the project. The bid deadline is September 11, 2026, and all inquiries regarding licensing, insurance, bonding, or the project schedule should be directed to Lead Estimator Joe Bockelman.
Kiewit Infrastructure West Co.

POSTED

about 7 hours ago

DEADLINE

in 11 days
View Details
NAICS: 541330
New
Subcontracting Opportunity: City of Bend’s Southwest Sewer Improvement Phase 3, Project No. 1SSW3
Solicitation # 27-3214
Parametrix is seeking qualified subconsultants to provide civil engineering design and right-of-way services for the City of Bend’s Southwest Sewer Improvement Phase 3, Project No. 1SSW3. The primary objective of the project is to address sewer system deficiencies in southwest Bend by extending a gravity mainline sewer, installing service laterals to facilitate the conversion of properties from private septic systems to public sewer, and decommissioning existing pump stations. The scope may also include transportation improvements, such as ADA curb ramp and curb design. This project is funded by the Clean Water State Revolving Fund through the Oregon Department of Environmental Quality, with a total design and construction budget of 3,875,000 dollars sourced from the Water Reclamation Capital Improvement Program and Stormwater funds. The solicitation, identified as number 27-3214, is open to various small business set-asides, including SDB, WOSB, HUBZone, and SDVOSB. Proposals are due by September 29, 2026, and must be submitted electronically via the City of Bend eProcurement Portal. Evaluation is based on project understanding, team qualifications, and firm experience, with a potential optional interview. Key deliverables include a preliminary engineering report, a public outreach plan, and construction contract documents at 30, 60, 90, and 100 percent completion. The City aims to advertise for construction services in Fall or Winter 2027. Parametrix is actively pursuing a good faith effort to solicit firms with recognized federal, tribal, state, local, or independent DBE certifications.
Parametrix

POSTED

about 7 hours ago

DEADLINE

in 10 days
View Details
NAICS: 541330
New
SLED
RFQ26-06 On Call Professional Services
Solicitation # RFQ 26-06
The City of Dunwoody is soliciting proposals under RFQ 26-06 for qualified consulting firms to provide on-call professional engineering and related services for the Public Works Capital Projects and Stormwater Division. This is a master services agreement where selected firms will be awarded work through individual task orders based on a contracted rate schedule. The scope includes professional engineering services, with specific stormwater deliverables such as project narratives, quantity management reports, and technical drainage maps. Proposals must be submitted by October 23, 2026, via a thumb drive in a sealed envelope, containing a technical proposal, rate schedules, and an acknowledgement form. The selection process involves an administrative review followed by a technical evaluation scored out of 100 points, with a heavy emphasis on the qualifications and experience of the Project Manager and Key Team Leaders. While proposal rate schedules are required to establish billing rates, they are not used during the initial technical evaluation. Required qualifications include Georgia professional licensure for design seals, GDOT prequalifications, and specific Georgia Certified General Appraiser credentials for appraisal services. The contract is governed by the laws of the State of Georgia and requires consultants to maintain comprehensive insurance coverage, including general liability, auto, umbrella, and professional liability, all with a minimum of 1,000,000 dollars per occurrence or claim. Additionally, firms must comply with E-Verify and ADA standards. The City retains ownership of all intellectual property produced under the contract and may terminate the agreement for cause with 10 days notice or for convenience with 30 days notice. Hourly rates will be adjusted annually based on the Municipal Cost Index.
City of Dunwoody

POSTED

about 13 hours ago

DEADLINE

in about 1 month
View Details

More opportunities from City of Moncton / Ville de Moncton

Same awarding agency

NAICS: 541330
International
Professional Engineering Services – Moncton Coliseum (Arena): Heating System Modernization
Solicitation # RFP26-051
The City of Moncton is soliciting proposals under RFP26-051 for professional engineering services to modernize the heating and HVAC infrastructure at the Moncton Coliseum. The selected consulting firm will be responsible for the full project lifecycle, beginning with an Investment Analysis Report that evaluates four heating system scenarios, including city-identified options, a consultant-developed alternative, and a like-for-like replacement. This analysis will prioritize capital and lifecycle costs, energy efficiency, greenhouse gas emissions, and the utilization of refrigeration plant heat recovery. Upon authorization, the consultant will provide comprehensive design and implementation services, including conceptual and detailed design, tender documentation, construction administration, and commissioning support. The project is supported by an anticipated construction budget of approximately 4 million dollars. The evaluation process uses a weighted scoring system, with 85 points allocated to technical criteria such as project understanding, methodology, lifecycle analysis, and team experience. The performance period includes a design phase concluding in January 2027, followed by a construction phase from February to September 2027. Key contractual requirements include a work-for-hire classification for all intellectual property, minimum commercial general liability and automobile insurance of 2 million dollars per claim, and adherence to a net 30-day payment term. Proposals must be submitted electronically by October 6, 2026.
Engineering Services

POSTED

11 days ago

DEADLINE

in 17 days
View Details
NAICS: 811310
International
Inspection and Servicing of Emergency Generators
Solicitation # QP26-046
The City of Moncton is seeking a professional, licensed firm to provide comprehensive inspection, testing, and preventative maintenance services for Diesel, Propane, and Natural Gas emergency generator systems located at various municipal facilities. The scope of work includes monthly, semi-annual, annual, and five-year inspections, as well as on-demand repairs and servicing. Key technical requirements involve semi-annual testing of starter systems and engines under at least 30% load, and annual inspections featuring oil and filter changes alongside a two-hour full load bank test. Contractors must also perform specialized tasks such as infrared surveys of electrical connections and fuel oil testing, while documenting all activities in on-site logbooks and providing formal condition assessments using the City's specific rating matrix. The contract is structured as a twelve-month agreement beginning October 1, 2026, with two optional one-year renewal periods, and has an estimated annual value of approximately $40,000.00. To qualify, bidding firms must have at least three years of experience in emergency generator servicing and must employ technicians holding valid New Brunswick licenses for Natural Gas (ICE/IV-NG) and Propane (ICE/IV-P) internal combustion, each with a minimum of five years of related experience. Additionally, staff must hold Arc Flash certification and factory-training from major manufacturers like Caterpillar or Kohler. Successful bidders must maintain $2,000,000 in Commercial General Liability and Automobile Liability insurance. Due to the sensitive nature of certain sites, personnel assigned to the Codiac Regional Policing Facility must obtain RCMP Facility Access Level 2 security clearance. Proposals must be submitted digitally via the bids&tenders system by the deadline of September 22, 2026.
Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance

POSTED

about 1 month ago

DEADLINE

in 3 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS