Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on August 18, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

I-280 Comprehensive Multimodal Corridor Plan

Closed
S26117State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
SLED
RFP/RFQ - On-Call Engineering Services for Torrington Transfer Station/NRRA
Solicitation # EDC 11- 2026 -01
The Northwest Hills Council of Governments (NHCOG) is soliciting proposals under solicitation number EDC 11- 2026 -01 for on-call engineering services to support the Torrington Transfer Station and the Northwest Resource Recovery Authority (NRRA). The agency seeks a qualified firm specializing in Municipal Solid Waste and Recycling Transfer Stations to provide technical analysis, facility and operational capacity assessments, site planning, and permitting assistance. These services are intended to support ongoing operations and inform the NRRA Strategic Plan and future capital investment decisions, ensuring compliance with CT DEEP General Permits. Interested firms must submit their proposals by November 30, 2026, at 11:00 AM. Submissions must include a project management plan, key personnel resumes limited to two pages, three relevant references, a technical approach, and a detailed project timeline. A fee proposal containing hourly rates or lump sum allocations must be submitted in a separate sealed envelope. Evaluation will be based on personnel qualifications, experience with multiuse trails and waste facility planning, the proposed project approach, and the fee schedule. Awardees must provide proof of workers compensation, liability, and vehicle insurance, including a waiver of subrogation and naming the State of Connecticut and NHCOG as additional insureds within ten days of the award. Required documentation also includes a Non-Collusion Affidavit and certifications of non-discrimination.
DAS Procurement

POSTED

about 11 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

The Santa Clara Valley Transportation Authority (VTA) is soliciting proposals under RFP S26117 for the I-280 Comprehensive Multimodal Corridor Plan (CMCP). The project aims to update the October 2017 I-280 Corridor Study to identify transportation improvements along the I-280 corridor in Santa Clara County. The primary objectives are to expand active transportation facilities, relieve congestion, improve operations, and enhance safety, while ensuring that the proposed improvements do not increase Vehicle Miles Traveled (VMT). The selected contractor will provide engineering services to deliver technical memoranda, VMT analysis, and a final CMCP consistent with California Transportation Commission guidelines and Caltrans and FHWA standards. The contract has a primary performance period of six months, with a VTA option to extend for an additional six months. Award is based on a best-value ranking of technical evaluations, with cost negotiations occurring only with the highest-ranked proposer. Evaluation preferences include additional points for local firm participation and a business development program targeting Small Business Enterprises (SBEs) and Disadvantaged Business Enterprises (DBEs). Key deliverables include a base year validation, a list of net-zero VMT projects, and final board materials. The contractor must maintain a Quality Management Plan meeting VTA standards and adhere to strict invoicing requirements, including detailed personnel timesheets and a mandatory certification statement.

General Info

VTA seeks engineering proposals for the I-280 Comprehensive Multimodal Corridor Plan project.

Place of Performance

CA, USA

Set-Aside

NONE

Documents

4

Contract S 26117 - Professional Services Contract Form

PDF, High priority: read this firstcontract-document
High

RFP No. S26117 - I-280 Comprehensive Multimodal Corridor Plan

PDF, High priority: read this firstrfp
High

RFP No. S26117 – I280 Comprehensive Multimodal Corridor Plan

PDF, High priority: read this firstrfp
High

Santa Clara I-280 Corridor Study (October 2017)

PDF, Low priorityother
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Deadline changed

Response deadline changed from Sep 25, 2026 to Sep 18, 2026.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Engineering and Program Delivery
Contacts2 people available
OfficeSan Jose, CA, 95134, USA
Office AddressSan Jose, CA, 95134, USA
Contacts
Chris LillieProject Manager
Melanie RutnerContracts Admnistrator I

Interested Companies (64)

Drago VantageLoomis, CA
Elite Transportation GroupSunnyvale, CA
EntramPORT CHARLOTTE, FL

See All 64 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
VTA seeks proposals (each a "Proposal") from responsive and responsible qualified firms (each a "Proposer") to identify and evaluate a set of transportation-related improvement projects along the I-280 corridor in Santa Clara County to expand active transportation facilities, relieve congestion, improve operations, enhance safety, and either reduce Vehicle Miles Traveled (VMT) or at least cumulatively do not result in an increase in VMT for programming and implementation for the project titled below and further described in the Scope of Work (the "Project").

More opportunities from California → Engineering and Program Delivery

Same awarding agency

NAICS: 237310
New
SLED
US 101 Express Lanes Phase 5
Solicitation # C26031F
The US 101 Express Lanes Phase 5 project, solicitation C26031F, is a construction contract issued by the Santa Clara Valley Transportation Authority (VTA) to convert existing High Occupancy Vehicle (HOV) lanes into a dual express lane system. The project spans approximately 11 miles along US 101 from the US 101/SR 237 interchange in Sunnyvale to the Taylor Road Interchange in San Jose, passing through the cities of San Jose, Santa Clara, Sunnyvale, and Mountain View. Key construction activities include adding a second express lane in both directions, roadway widening, drainage construction, and the installation of tolling infrastructure. The work is estimated to take place between November 2026 and June 2031, with a total estimated construction cost within the right-of-way of 170.6 million dollars. The contract will be awarded to the lowest responsive and responsible bidder based on the total bid price submitted on Bid Form 1B. Bidders must comply with several regulatory requirements, including a 7.8 percent Disadvantaged Business Enterprise (DBE) participation goal, Buy America certifications, and California Labor Code prevailing wage requirements. Technical specifications mandate adherence to Caltrans Highway Design Manual standards and the Americans with Disabilities Act (ADA). The scope of work is supported by extensive geotechnical and foundation reports for multiple retaining walls, FAA determinations for temporary mobile cranes, and encroachment permits from local municipalities. Bids are due by 2:00 p.m. Pacific Time on October 29, 2026.
Highway, Street, and Bridge Construction

POSTED

5 days ago

DEADLINE

in 16 days
View Details
NAICS: 811192
SLED
Pre-Qualification: Guadalupe Light Rail Vehicle Wash Improvements
Solicitation # C25134F
The Santa Clara Valley Transportation Authority is soliciting pre-qualifications for Contract C25134F, the Guadalupe Light Rail Vehicle Wash Improvements project. This initiative involves the removal and replacement of the existing light rail vehicle wash system at Building F of the Guadalupe Division with a new hybrid drive-through and gantry wash system. The comprehensive scope of work includes civil and trackwork, electrical upgrades, plumbing, the installation of industrial wash equipment with water reclamation and filtration, and the construction of a prefabricated canopy structure. The estimated construction cost for the project is between 4.5 million and 5.5 million dollars. To be eligible for the subsequent Invitation for Bid, firms must be approved through a rigorous pre-qualification process. Bidders are required to submit a Statement of Qualifications and a completed qualification questionnaire via the OpenGov portal by October 30, 2026, at 2:00 pm PT. Mandatory requirements include a California contractor's license with at least 10 years of experience as a Class A or B General Contractor, as well as registration with the California Department of Industrial Relations. Evaluation is based on essential requirements, organizational performance, and project experience, with specific minimum scoring thresholds and potential interviews required for qualification. Additional mandates include maintaining liability insurance of at least 1 million dollars per occurrence and 2 million dollars aggregate, and providing a notarized statement of sufficient bonding capacity from an admitted surety insurer. Because the work occurs in an active light rail environment and involves the agency's only wash facility, the selected contractor must adhere to strict safety procedures and coordinate closely with the authority to minimize operational disruptions.
Car Washes

POSTED

8 days ago

DEADLINE

in 3 days
View Details
NAICS: 238210
SLED
Cerone Security Enhancements
Solicitation # C26102
The Santa Clara Valley Transportation Authority (VTA) is soliciting bids for solicitation number C26102, titled Cerone Security Enhancements. This construction project involves comprehensive security upgrades at the Cerone main entrance, including the installation of 10-foot chain link fencing, vehicular swing gates, manual and pedestrian gates, and electronic security systems such as card readers, intercoms, and CCTV cameras. The scope of work also encompasses the necessary electrical infrastructure, communications integration, and demolition of existing asphalt concrete pavement. The contract will be awarded to the lowest responsive and responsible bidder based on the total bid price submitted on Bid Form 1B. The project is classified as public work under Section 1720 of the California Labor Code, requiring the payment of prevailing wages. Bidders must maintain active registration in the System for Award Management (SAM) and comply with Buy America requirements and VTA's Business Development Program for Small Business Enterprises (SBE). Technical requirements include adherence to NFPA 70 and NFPA 70E standards, with specific mandates for NEMA-rated enclosures and strict packaging and labeling protocols for fiber optic cables. Bids must be submitted electronically via the VTA Procurement Website by the deadline of September 17, 2026, at 2:00 PM Pacific Time.
Electrical Contractors and Other Wiring Installation Contractors

POSTED

14 days ago

DEADLINE

in about 2 months
View Details
NAICS: 236220
SLED
Pre-Qualification: Guadalupe Division - Guard House
Solicitation # C26146F Pre-Qual
The Santa Clara Valley Transportation Authority is soliciting pre-qualifications for Contract C26146F, the Guadalupe Division Guard House project. This effort is a mandatory preliminary step to establish a list of qualified bidders for a subsequent Invitation for Bids. The project involves the installation of a pre-fabricated guard house at the Younger Avenue entrance, including a base bid for road expansion, a concrete slab, electrical and data utilities, guard gates, bollards, CCTV, exterior lighting, and accessible walkways. An optional component includes the procurement and installation of the guard house itself along with water and sewer connections. The estimated contract value ranges from 591,000 dollars for the base bid to 1.85 million dollars including Option 1, with an estimated construction duration of 267 calendar days. To be eligible, bidders must hold a California contractor's license with classifications Class B, C-10, C-7, and C-36, though specialty requirements may be met through licensed subcontractors. The pre-qualification process requires the submission of a completed questionnaire, a Statement of Qualification Certification Form, audited financial statements, and notarized bonding information. Evaluation is based on a pass/fail assessment of essential requirements and a scoring system for project experience and interviews, where a minimum score of 55 is required to avoid disqualification. Because the project is federally funded, all materials must comply with Buy America provisions. The response deadline for pre-qualification is November 30, 2026, with the final bid opening anticipated for January 2027.
Commercial and Institutional Building Construction

POSTED

18 days ago

DEADLINE

in about 1 month
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS