ICDBG 2025 - $45,000.00
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The Choctaw Nation Housing Authority is soliciting bids for a home repair project in Keota, Oklahoma, for a 1,652 square foot brick home. The scope of work includes the installation of a 40-year, 26-gauge painted metal semi-hip roof, the replacement of the HVAC system with a minimum 14.3 SEER2-rated electric heat pump, plumbing upgrades including frost-free faucets and a dielectric union on the propane line, and electrical work involving new smoke/carbon monoxide detectors and bathroom lighting. All work must meet or exceed 2019 IRC standards, and the contractor is responsible for all permits, line locates, waste removal, and restoring the yard to mowing condition. This federally funded project is subject to Davis-Bacon Act wage requirements and provides preference to Indian organizations and Indian-owned economic enterprises. Prospective contractors are required to visit the project site before bidding, as change orders for identifiable site conditions will not be approved. Valid bids must be itemized, include a price expiration date, and be submitted exclusively through the Housing Bid Board. For payment processing, the contractor must provide an AHRI certificate for the installed HVAC equipment along with the invoice.
General Info
Place of Performance
Keota, OK, 74941, USASet-Aside
Documents
1AI Contract Breakdown
Uniform Contract FormatSign up to view the full breakdown with detailed analysis of each section.
View Full BreakdownEverything you need to bid on this one
Open the full contract in your free workspace.
- 1 solicitation documentRead every page
- AI contract breakdown13 sections, Uniform Contract Format
- Buyer contactEmail and phone
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
Response Deadline
Organization & Contact Information
Full Description
Special Instructions: All prospective contractors are required to visit the project site before submitting a bid. Change orders due to conditions that could have been identified during the site visit will not be considered or approved. Home is a 3-bed 2-bath, brick home, approx. 1652 sq. ft. shingle roof. Slab on grade. All work done must meet or exceed 2019 IRC. All applicable licenses apply. It is highly recommended contractor view job before biding. Contractor is responsible for all line locates and permits required Contractor will be responsible for cleanup and removal of all waste and repair yard back to mowing condition. Homeowner/Property Manager will select any/all colors used for the job. Contractor is responsible for all measurements, and count of materials needed.
Roofing: Semi-hip roof. Remove all shingles, felt, roof jacks, drip edge, and attic ventilations. Re-nail or replace decking as needed. Install new 40-yr, 26-gauge painted metal, 30# felt, (drip edge if required), rake, continuous ridge with vented closure strips at peak for proper ventilation, (May require decking at peak to be cut to allow for proper ventilation), and roof jacks, high heat roof jacks for any gas appliance penetrations and a minimum of 1 ½’ screws. Install screws at every rib when installing ridge cap. Use any and all flashing needed for complete and proper finish. Lathe roof if required. Participant to choose a color. Ensure all vent piping is properly attached at the appliance upon roof completion.
Mechanical-HVAC: Remove and replace the existing HVAC unit. Install a new minimum 14.3 SEER2-rated energy-efficient electric heat pump unit. Install new copper line-set, appropriate filter drier, thermostat, and registers. Replace all needed electrical from the service line to the HVAC unit, including breaker boxes, breakers, etc. Caulk all ceiling drops to drywall before air register installation. Seal the return air cavity with drywall for energy efficiency. Insulate the duct where needed. Replace the plenum if required for proper fitment of the new unit. If duct board is to be used for transition to plenum, all joints must be foil-taped, and an acrylic latex or mastic sealant is to be applied over foil-taped joints. Ductwork that is to be installed or replaced under the home should be insulated metal pipe; flex duct is not to be used underneath the home. The contractor will be responsible for the proper sizing of the new unit. The contractor must provide the AHRI certificate for the equipment to be installed with the invoice for payment.
Plumbing: Install a Dielectric union on the propane line. Remove and replace 2 outside faucets with frost-free faucets. Install a pressure release valve drain to drain into the drain that the drain pan goes to.
Electrical: Remove and replace the hall bathroom light, and install new smoke/carbon monoxide detectors throughout the house. Repair all damage due to electrical change outs, to include but not limited to drywall, paint, paneling, flooring, and ect.
Similar Contracts
Same NAICS industry code
More opportunities from Oklahoma → Choctaw Nation Housing Authority
Same awarding agency
Ready to Pursue This Opportunity?
Get AI-powered intelligence on this solicitation and the ones like it
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS