ADA Shower
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The Choctaw Nation Housing Authority is soliciting bids for an ADA shower installation at a 1,350 square foot brick home located at 501 E Hagen Road in McAlester, Oklahoma. The project involves removing an existing tub and shower to install a low-entry shower base and surround using Swan-Stone or a comparable material with a minimum thickness of 1/4 inch; notably, FRP surrounds are prohibited. The scope of work includes installing a Delta or comparable mixing valve and handle, two ADA grab bars, a portable seat, and an adjustable height handheld shower faucet with a dedicated guide rod. Additionally, the contractor must repair or replace all affected drywall, trim, flooring, and paint, ensuring all work meets or exceeds 2019 IRC standards. Contractors are required to visit the project site before bidding, as change orders for conditions identifiable during a site visit will not be approved. Bidders are responsible for all permits, line locates, waste removal, and restoring the yard to mowing condition. Valid bids must be itemized, include a price good date, and be submitted exclusively through the Housing Bid Board. The award process applies the Housing Authority Indian Preference, favoring Indian organizations and Indian-owned enterprises, and Davis Bacon rules apply to projects valued at 2,000 dollars or more. The estimated award date is December 22, 2026, with a response deadline of November 22, 2026.
General Info
Place of Performance
McAlester, OK, 74501, USASet-Aside
Timeline
Response Deadline
Organization & Contact Information
Full Description
Special Instructions: Home is a 3-bed 2 bath, brick home approx. 1350 sq. ft. shingle roof. Slab on grade. All prospective contractors are required to visit the project site before submitting a bid. Change orders due to conditions that could have been identified during the site visit will not be considered or approved. Any questions please contact (Case Manager) Andrea Strawn at Sign up to see this detail or (Inspector) Kevin Mings at Sign up to see this detail
Plumbing: Remove and replace tub/shower. Install new low entry shower base and surround, with Swan-Stone or comparable, must be a minimum of 1/4” thickness. Replace shower handle and mixing valve with Delta or comparable. Install 2 ADA grab bars, adjustable height handheld shower faucet with its own adjustable guide rod apart from the grab bars. and portable seat. FRP will not be accepted as a tub/shower surround. Repair/replace any all drywall, trim, sub and finish flooring, and paint needed due to repairs.
Special Instructions: All work done must meet or exceed 2019 IRC. All applicable licenses apply. It is highly recommended contractor view job before biding. Contractor is responsible for all line locates and permits required Contractor will be responsible for cleanup and removal of all waste and repair yard back to mowing condition. Homeowner/Property Manager will select any/all colors used for the job. Contractor is responsible for all measurements, and count of materials needed.
Similar Contracts
Same NAICS industry code
More opportunities from Oklahoma → Choctaw Nation Housing Authority
Same awarding agency
Ready to Pursue This Opportunity?
Get AI-powered intelligence on this solicitation and the ones like it
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
