This Solicitation opportunity from California was posted on January 14, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
IFB #2025-13 Platform Holly Caretaker Maintenance & Oversight Services (PW)
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
General Info
Place of Performance
Santa Barbara, CA, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
** Attachments to the solicitation must be downloaded from CaleProcure or email us at contact@example.gov **
CaleProcure (Ca State Contracts Register) Event ID: 0000037477
Bid Log: Invitation for Bid (IFB) #2025-13 Title: Platform Holly Caretaker Maintenance & Oversight Services Project Location: Platform Holly, located in the Santa Barbara Channel, two miles from Coal Oil Point, in Santa Barbara County, California. Offers Due: February 11, 2026
NOTICE TO PROSPECTIVE BIDDERS Platform Holly stands in 211 feet (64 m) of water approximately two miles (3.2 km) southwest of Coal Oil Point (34°23'23.7"N 119°54'22.5"W). The platform was installed in 1965 and, until 2015, produced oil and gas from the South Ellwood Oil Field which was transported via subsea pipelines, to an onshore facility for processing and downstream transport to market.
The platform was shut-in after the 2015 Refugio Oil spill near Gaviota and, since 2017, has been under the control of the State of California through the Commission. The Commission has plugged and abandoned the platform's 30 wells, including removing the conductor casing, and plans to decommission the platform sometime after 2025.
In the interim, the Commission is hardening the platform to eliminate regular staffing needs by decoupling the platform from any shore-based utilities or power, removing oil production equipment, eliminating sources of spill risk, and installing solar power, security monitoring equipment, and navigation hazard avoidance equipment. This work is currently being performed by ExxonMobil and will be completed by Fall 2024. After hardening is complete, a caretaker period will begin. This will involve routine platform visits and remote monitoring to prevent trespass and ensure navigation safety systems remain operational. Purpose and Description of Services: The purpose of this contract is to provide a contractor to provide caretaker services for Platform Holly after hardening is complete.
Contact: contact@example.gov
Earlier notices in this NAICS code
Posted before this notice, open and closed
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
