IFB26-025 Old Jesup Rd Drainage Improvement Project
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The Old Jesup Road Drainage Improvement project involves the complete removal of an existing 6' by 2.5' box culvert and associated storm pipes, followed by the installation of a double run of 48-inch Class III reinforced concrete pipe (RCP) with corresponding headwalls as specified in the construction plans. The scope of work includes cutting and removing the existing asphalt and 12-inch concrete road base, dewatering as needed, installing approximately 64 linear feet of new storm pipe, backfilling, grading, and restoring the site to its original condition. Additional tasks cover traffic control in line with approved plans, erosion and sediment control, bypass pumping if required to avoid upstream flooding, and final site stabilization through grassing. Issued by the Glynn County Board of Commissioners in Georgia, this project is solicited under IFB26-025 with bids due by February 11, 2026. The contractor must supply all necessary labor, materials, equipment, and skills to complete the work. Questions or communications about the contract can be directed to the primary point of contact, Maria Thompson. The project aims to enhance stormwater management and ensure road infrastructure stability at Old Jesup Road through the replacement and upgrade of critical drainage structures.
General Info
Place of Performance
Glynn County, GA, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
The work to be performed under this contract includes, but is not limited to, the following items: Road cut and removal of existing asphalt and 12 concrete road base, Removal of the existing box culvert and storm system and the installation of approximately 64 linear feet of 48-inch Class III RCP storm pipe and installation of Headwalls, Traffic control and maintenance of traffic in accordance with approved traffic control plans, dewatering operations as required to facilitate construction, backfilling, compaction, grading, and restoration of disturbed areas, borrow material placement and grading, as necessary, Storm drainage and structure installation, bypass pumping if necessary to prevent flooding upstream. Erosion and sedimentation control measures, grassing and final site stabilization.
More opportunities from Georgia → Glynn County Board of Commissioners
Same awarding agency
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS