Improving Lake Superior outflow regulation and quantifying uncertainty
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The U.S. Army Corps of Engineers is seeking proposals to perform a comprehensive uncertainty analysis for new outflow rating equations related to a key water control structure on Lake Superior. This effort aims to improve the accuracy and reliability of discharge measurements vital to managing the Great Lakes under the Lake Superior Regulation Plan. The primary task involves working closely with a University of Michigan team that is developing these new rating equations using advanced physical and computational fluid dynamics models. The selected contractor must produce quantified uncertainty bands for discharge rates across various gate settings and water levels, integrating these results into the existing Large Lake Statistical Water Balance Model. This initial task has a 12-month timeline to ensure results can inform imminent studies. Additional optional work, subject to funding availability, includes the creation and calibration of a detailed three-dimensional hydrodynamic model of the St. Marys River using the Delft3D FM suite, focusing on the river's rapid section and encompassing a broad geographic domain from Lake Superior to Lake Huron. The model must incorporate the rating equations and uncertainty metrics developed in the primary task. The U.S. Government will provide calibration data and computational resources for this effort. Overall, the projects aim to deliver reliable uncertainty metrics that can be directly applied in USACE operational models to enhance water resource management and ecological outcomes within the Great Lakes system.
General Info
Agency
Place of Performance
Not specifiedSet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
A. The U.S. Army Corps of Engineers (USACE) invites proposals for a project to conduct a comprehensive uncertainty analysis for new outflow rating equations associated with a critical water control structure on Lake Superior. The primary focus of this funding opportunity is to enhance the accuracy and reliability of discharge measurements, which are fundamental to the effective management of the Great Lakes system under the Lake Superior Regulation Plan. The base task, along with both options, are all tasks that are related to improving Lake Superior outflow regulation. However, these tasks are not interdependent. The base, option 1 and option 2, are simply a priority given to these tasks if funding should be available.
Task 1:
Current operational procedures for the structure’s gates include partially open settings that are not accounted for in historical rating equations. To address this, new rating equations are currently under development by a team at the University of Michigan using advanced physical and computational fluid dynamics (CFD) modeling. A key requirement for a successful proposal under this announcement is a well-defined plan for the awardee to work collaboratively and integrate their efforts with the existing University of Michigan modeling team. This partnership will be essential to ensure the resulting uncertainty analysis is robust and directly applicable to the new ratings. The principal outcome of this work will be a quantified uncertainty band for discharge rates corresponding to various gate openings and water levels. The uncertainty analysis should use the publicly available Large Lake Statistical Water Balance Model, so the uncertainty values are consistent with already operational uncertainty models for all other components of the Great Lakes water balance. This task will require a 12 month performance period so the results can be used in an upcoming study.
Depending on availability of funding, the U.S. Army Corps of Engineers may award the following optional work:
Task 2:
The development and calibration of a high-fidelity hydrodynamic model of the St. Marys River built using the Delft3D FM suite. The scope of this model be the entire St Marys River from Point Iroquois on Lake Superior to the outlet of the River near Detour Village on Lake Huron. The domain shall include the North Channel of Lake Huron to Little Current Ontario but exclude connections to Georgian Bay. The model will be fully three-dimensional, focus on the St Marys Rapids and be able to incorporate the rating equations and uncertainty analysis proposed above. Delft3D FM must be used as the United States Government as well as partners at Environment Climate Change Canada both have access to this modeling suite. The United States Government will provide water level and velocity data to calibrate the model as well as computational resources.
Successful projects will deliver technically sound uncertainty metrics that can be immediately integrated into USACE operational models, contributing to improved ecological outcomes and more effective water resource management. As well as the ability to provide scopes of work for the additional tasks should they be funded.
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS