Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity was posted on May 29, 2014. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Improving Patient Care Remodel - Parker, AZ

Awarded
14-161-SOL-00008Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for the Inland Empire Utilities Agency. This project, located in California with a specific focus on the Riverside and Los Angeles project areas, is designated as a set-aside for Disadvantaged Business Enterprises (DBE) under the Department of Transportation. The solicitation was posted on October 21, 2026, with a response deadline of November 4, 2026. A critical component of this contract is strict adherence to six Good Faith Effort (GFE) requirements designed to secure project financing and expand upon State Water Resources Control Board standards. Bidders must provide proof of publicity, including online postings for 30 consecutive days and a one-day print newspaper advertisement, as well as evidence of utilizing the Small Business Administration and Minority Business Development Agency. These specific documents must be submitted with the bid package to avoid being deemed non-responsive. Additionally, documentation of DBE outreach may be submitted up to three business days after the bid closing date. Failure to comply with these GFE mandates will result in the disqualification of the proposal.
RT CONTRACTOR CORP

POSTED

22 minutes ago

DEADLINE

in 13 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The project involves the creation of a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. Additionally, Option 1 includes a separate 17,978 square foot laboratory facility with similar structural specifications and the demolition of Building 1272T, a 548 square meter engineering facility. The scope of work encompasses comprehensive site improvements, including landscaping, parking, exterior lighting, telecommunications, and underground stormwater retention systems. Pricing is requested across a wide range of trades, including demolition, abatement, concrete, masonry, structural steel, mechanical, electrical, plumbing, and fire protection. This is an SBA set-aside solicitation for small businesses and other designated disadvantaged business categories. All work must adhere to Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact the primary point of contact to receive the formal bid invitation and documents via Building Connected before the response deadline of November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

22 minutes ago

DEADLINE

in about 1 month
NAICS: 236220
New
CITY OF GREENFIELD WASTEWATER TREATMENT PLANT UPGRADE PROJECT
Solicitation # city-greenfield-wastewater-treatment-plant-upgrade-project
The City of Greenfield Wastewater Treatment Plant Upgrade Project involves the construction of a new 2.0 million gallons per day wastewater treatment plant located at 41901 Walnut Avenue in Greenfield, California. The project scope is divided into four distinct phases: site preparation including soil stabilization and facility relocation; construction of the plant featuring a packaged Membrane Bioreactor, headworks, UV disinfection, SCADA systems, and various support buildings; decommissioning and demolition of existing facilities; and finish facilities including the Walnut Avenue extension and a second sludge handling unit. The total duration for the project is 915 calendar days, with a critical requirement to maintain existing plant services and regulatory compliance throughout the first two phases. Managed by C. Overaa & Co., the solicitation is open to various small and disadvantaged business enterprises, including DBE, SDVOSB, and WOSB. A significant local hiring goal requires that 50 percent of the total construction workforce be residents of Monterey, San Benito, or Santa Cruz counties. Subcontractors must utilize the Textura electronic invoicing system and agree to the Overaa standard agreement without modification. Bids are due by November 10, 2026, following a mandatory pre-bid meeting held on October 5, 2026. Performance and labor bonds for 100 percent of the subcontract price may be required, and all subcontractors must provide a waiver of subrogation endorsement for workers compensation insurance.
C. Overaa & Co.

POSTED

22 minutes ago

DEADLINE

in 19 days
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
J & J Contractors, Inc. is soliciting bids for the P1102 Weapons Magazine and Ordnance Operations Facility project located at the Naval Submarine Base New London in Groton, Connecticut. This comprehensive construction project has a duration of 1828 calendar days and involves the creation of six Containerized Long Weapons Storage units, two Box G magazines, and one Box H earth-covered high-explosive magazine. The scope includes the installation of overhead cranes, reinforced concrete floors, grounding and lightning protection, and intrusion detection systems. Additionally, the project requires the construction of a new Ordnance Operations building, a Truck Inspection facility, and a Sentry building, alongside the demolition of 18 existing magazines and two other buildings. The technical requirements encompass extensive sitework, including clearing, rock excavation, grading, and the implementation of rigid inclusions and load transfer mats for foundations. Due to the impact on existing wetlands, mitigation efforts are required. Infrastructure improvements include new access roads, paved loading areas, landscaping, and a complete electrical utility system featuring primary and secondary distribution, transformers, and telecommunications. This solicitation is set aside for various small business categories, including SDB, WOSB, HUBZone, and VOSB. Interested parties must respond by October 31, 2026.
J & J Contractors, Inc

POSTED

22 minutes ago

DEADLINE

in 9 days
NAICS: 236220
New
SLED
Colville Fuels, Coyote Ridge Golf Course, Secondary Emergency Exit from Clubhouse Basement
Solicitation # Request-for-Bid-Coyote-Ridge-Golf-Course-Secondary-Emergency-Exit-from-Clubhouse-Basement.pdf
Colville Fuels LLC is soliciting firm fixed price bids for the construction of a code-compliant secondary emergency exit from the clubhouse basement at Coyote Ridge Golf Course in Washington. The scope of work includes site preparation, structural modifications such as saw cutting reinforced concrete walls, and the installation of an ADA-accessible route featuring ramps, landings, and handrails. The contractor is responsible for all permitting, structural engineering, weatherproofing, and ensuring that interior and exterior finishes match the existing clubhouse architecture. Project acceptance is contingent upon successful inspections by the Authority Having Jurisdiction and final approval by Colville Fuels. This is a price-based solicitation where the award will be made to the lowest responsive and qualified bidder, subject to budgetary limits and Indian preference requirements per Colville Tribal Code Chapter 10-3. Bidders must demonstrate technical and financial capacity, provide a detailed project schedule, and submit a subcontracting plan. Required insurance includes Commercial General Liability of at least 1 million dollars per occurrence, Business Automobile Liability, and Worker's Compensation. Bids are due by November 20, 2026, with a targeted contract award date of December 4, 2026, and a weather-dependent completion goal of March 31.
Confederated Tribes of the Colville Reservation

POSTED

43 minutes ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

The Indian Health Service Division of Engineering Services-Dallas is seeking bids for the Improving Patient Care Remodel at Parker Indian Hospital in Parker, Arizona. This project involves the remodeling of 6,913 square feet within the hospital outpatient area, requiring comprehensive demolition and finish work across carpentry, plumbing, mechanical, and electrical trades. The contract is structured as a firm fixed-price award with an estimated project magnitude between 500,000 and 1,000,000 dollars. This opportunity is 100 percent set aside for small businesses registered in SAM.gov under NAICS code 236220 for Commercial and Institutional Building Construction. Award decisions will be based on price and other price-related factors. Interested bidders were encouraged to attend a pre-bid conference and site visit on May 1, 2014, and are responsible for accessing all architectural specifications and drawings via the Federal Business Opportunities webpage.

General Info

Agency

N/A

Contract Value

$30,655.67

NAICS

236220 - Commercial and Institutional Building Construction

Place of Performance

Parker Indian Hospital 12033 Agency Road, PARKER, AZ, 85344, USA

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseAwarded
Posted

Combined Synopsis

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyN/A
Contacts2 people available
OfficeN/A
Organization / Agency
N/A
Office AddressN/A
Contacts
Dan D. FinleyContracting
Robyn L. Red TomahawkProcurement Technician

Full Description

Show more
The Indian Health Service (IHS), Division of Engineering Services-Dallas, solicits bids for a small business set-aside for the construction project titled "Improving Patient Care (IPC) Remodel" at the Parker Indian Hospital. The remodel will involve multiple trades to remodel 6,913 square feet of the hospital's outpatient area. Work will include demolition and finish work from carpentry, finish, plumbing, mechanical, and electrical trades. The government anticipates awarding a firm fixed-price contract from this solicitation. The magnitude of this project is between $500,000 and $1,000,000 and is 100% set-aside for small business participation. This project is advertised as an Invitation for Bid (IFB) with a full set of recent architectural specifications and drawings. Price and other price related factors will determine the awardee. Work to be performed under this project will be within the North American Industry Classification System (NAICS) code 236220, Commercial and Institutional Building Construction. Bids are solicited from only business concerns with active registrations in SAM.gov, and North American Industry Classification System (NAICS) Code 236220 must specifically be included in the Bidder's approved business plan. There will be a pre-bid conference and site visit on May 1, 2014 at 8 am (Mountain Standard Time) at the Parker Indian Hospital, Parker, AZ. Please refer to Section L-2 of the IFB for more information about the pre-bid conference. Those firms who intend to submit a bid are strongly encouraged to attend the pre-bid conference and site visit. All documents related to this IFB are available as attachments to this Federal Business Opportunities (FBO) webpage. No hard copies are available, nor will telephone requests be accepted. Bidders are responsible for downloading copies of all documents pertaining to this solicitation, including the IFB, at this webpage. Any Amendments issued to the IFB will be posted to this FBO webpage. It is the Bidder's responsibility to monitor this website for notices or solicitation amendments. This requirement was previously published under Pre-Solicitation Notice 14-161-SOL-00008P on April 2, 2014.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS