Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Initial Study No. 8631 and Unclassified Conditional Use Permit No. 3813

Forecast
IS 8631 / CUP 3813State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Initial Study No. 8631 and Unclassified Conditional Use Permit No. 3813 authorize the establishment of a solid waste processing facility on a 159.68-acre parcel located at 8486 E. Elkhorn Avenue in Fresno County, near Kingsburg, California. The project is designed for an existing dairy established before October 23, 2007, situated within the AE-20 Exclusive Agricultural Zone District. The facility's infrastructure will include four Biofiltro wastewater processing beds, one lift station, one mechanical separator, one weeping wall, and a concrete wall used to divide an existing settling cell into two separate cells. The Fresno County Department of Public Works and Planning served as the lead agency, conducting an environmental review that resulted in a Mitigated Negative Declaration, indicating that the project would not have a significant effect on the environment provided specific mitigation measures for cultural and tribal resources are implemented. Regulatory compliance requires the applicant to obtain an operating permit from the Fresno County Environmental Health Division and submit technical reports to the California Regional Water Quality Control Board. Additionally, the facility must adhere to the operational and development requirements of the Fresno County Fire Protection District. Public review and hearings were conducted between July and August 2025, with final determinations issued in October and November 2025.

General Info

Solid waste facility approved in Selma, CA, under CEQA with county permits and environmental compliance required.

Place of Performance

E. Elkhorn Ave. and S. Highland Ave., Kingsburg, CA, 93662

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

1 update
PhaseForecast
Posted

forecast

Notice updated

The notice description changed. The point of contact changed.

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more

Full Description

Show more
Allow a solid waste processing facility, consisting of four (4) Biofiltro wastewater processing beds, one (1) lift station, one (1) mechanical separator, one (1) weeping wall, and one (1) concrete wall to split an existing settling cell into two cells on an 159.68-acre parcel for an existing pre-October 23, 2007 dairy located within the AE-20 (Exclusive Agricultural, 20-acre minimum parcel size) Zone District.

Similar Contracts

Same NAICS industry code

NAICS: 541620
New
SLED
RFP for Preparation of an Initial Study Under CEQA
Solicitation # RFP-PLN-2504
The County of San Benito is soliciting proposals for the preparation of an Initial Study under the California Environmental Quality Act (CEQA). This project, identified as RFP-PLN-2504, requires the selected contractor to perform services in accordance with the Public Resources Code and the California Code of Regulations. The scope of work is divided into three primary tasks: project management, scope of services, and a traffic impact analysis. To support the study, the County has provided reference materials from planning files PLN250084 and PLN180004, which include grading and utility plans, a mitigated negative declaration, and various technical reports. Proposals must be submitted electronically via the OpenGov system by December 7, 2026, at 5:00 pm. The submission must be split into a technical proposal and a separate cost proposal using a specific pricing table. Award selection is based on a points-based scoring system that weights cost at 30%, firm qualifications at 25%, experience in similar CEQA analysis at 25%, and the quality of the written scope of work at 20%. The County reserves the right to award the contract to the highest-rated proposer rather than the lowest bidder. The resulting contract will be governed by the County of San Benito's Standard Contract, featuring a net-30 payment term with invoicing occurring one month in arrears. Contractors must certify compliance with various federal non-discrimination laws, including the Americans with Disabilities Act and the Civil Rights Act of 1964, and must provide a debarment certification. Final project schedules, including milestones and critical paths, will be required from the proposer, while specific insurance and indemnification terms will be finalized during the negotiation process.
Planning

POSTED

about 12 hours ago

DEADLINE

in 20 days
View Details
NAICS: 541620
New
International
Source Water Protection Plan - Baptiste Lake
Solicitation # 235899
The Regional District of East Kootenay is seeking a qualified consultant to develop a comprehensive and implementable Source Water Protection Plan for Baptiste Lake in British Columbia. The scope of work involves characterizing the lake and watershed as a drinking water source, identifying hazards and vulnerabilities, and evaluating current protection measures, governance, and climate-related risks. The final deliverables must include a detailed Source Water Protection Plan with recommended actions for land use and monitoring, a practical implementation plan with budget-level cost estimates, and a monitoring framework with decision triggers. The plan must align with the Edgewater Water System Master Plan, Interior Health permit conditions, and DFO screening requirements. The contract is expected to be awarded by December 18, 2026, with a project start-up meeting scheduled for mid-January 2027, a draft report due by May 28, 2027, and a final report due by July 2, 2027. Proposals are evaluated on a 100-point scale, with 40 points allocated to the project team and experience, 40 points for project understanding and methodology, and 20 points for the fee. The selection process prioritizes the highest overall ranking and best value rather than the lowest bid. Submissions must be delivered in PDF format to the designated Engineering Technician by the closing deadline.
Regional District of East Kootenay

POSTED

about 15 hours ago

DEADLINE

in 24 days
View Details

More opportunities from California → Fresno County

Same awarding agency

NAICS: 212321
New
SLED
CEMEX Rockfield Quarry Modification Project - Environmental Impact Report No. 7763 and Unclassified Conditional Use Permit Application Nos. 3666 and 3667
Solicitation # 2020060123
CEMEX Construction Materials Pacific LLC has applied to the County of Fresno for Unclassified Conditional Use Permits 3666 and 3667 to continue and modify aggregate mining and processing operations at the Rockfield Quarry. The project spans two locations in Fresno County: the Plant Site, covering approximately 138.5 acres, and the Quarry Site, covering approximately 352.4 acres. The total project lifespan is estimated at 100 years and is divided into two operational stages. Stage 1 involves concurrent operations at both sites for up to 30 years, including the extraction of hard rock at the Quarry Site to depths of 600 feet, the installation of a new processing plant at the Quarry Site, and the replacement of the existing asphalt plant at the Plant Site with a modern Hot Mix Asphalt plant. During this phase, annual aggregate sales are projected to increase from 1.4 million tons to 3.0 million tons over ten years. Stage 2 involves the relocation of all plant operations, including the ready-mix concrete and hot-mix asphalt plants, from the Plant Site to the Quarry Site for approximately 70 additional years. This transition eliminates interplant hauling and focuses all production and recycling of concrete and asphalt debris at the Quarry Site, maintaining annual sales of 3.0 million tons. Upon completion of mining at both sites, the land will be reclaimed as open space, riparian, and open water wildlife habitat. The project is subject to Environmental Impact Report No. 7763, which evaluates environmental effects and outlines mitigation measures under the California Environmental Quality Act guidelines.
Construction Sand and Gravel Mining

POSTED

1 day ago

DEADLINE

N/A
View Details
NAICS: 221114
SLED
San Luis West Solar Project
Solicitation # 2024110679
San Luis West Solar, LLC proposes the construction and operation of the San Luis West Solar Project in southern Fresno County, California, located approximately 10 miles northwest of Kettleman City. The project consists of a 125-megawatt solar photovoltaic electric generation facility coupled with a 30-megawatt battery energy storage system. The total project area encompasses approximately 1,100 acres, including 770 acres of solar panels and associated infrastructure such as a project substation, operations and maintenance building, and transmission easement areas. The facility is designed to inject electricity into the PG&E grid, with the battery system providing energy discharge during peak electrical load periods. The project is subject to comprehensive environmental review under the California Environmental Quality Act, with a Final Environmental Impact Report completed in October 2025. Key technical assessments have been conducted regarding air quality, greenhouse gases, noise, geology, soils, and water supply. Biological evaluations have focused on the protection of special-status species, including the western burrowing owl and Crotch's bumble bee. The project also includes a detailed Reclamation Plan to ensure the site is restored to agricultural conditions following an anticipated operational lifespan of at least 35 years. Construction was anticipated to commence in 2025, with a desired commercial operation date of December 31, 2025.
Solar Electric Power Generation

POSTED

12 days ago

DEADLINE

N/A
View Details
NAICS: 221114
SLED
Rosemary Solar and Energy Storage System Complex
Solicitation # 2024110253
The Rosemary Solar and Energy Storage System Complex project involves the construction, operation, and eventual decommissioning of a 140-megawatt photovoltaic solar and battery energy storage facility in unincorporated Fresno County, California. Spanning approximately 1,172 to 1,212 acres of agricultural land, the project includes three interconnected generation sites, an on-site substation, and a generation-tie line of up to 2 miles connecting to the PG&E Crescent Substation. Additional infrastructure improvements include the reconductoring of 5 linear miles of the PG&E Helm to Crescent 70 kV transmission line and the raising of a portion of the Crescent Switching Station-Schildner 70 kV power line. The project has undergone a comprehensive environmental review process under CEQA, resulting in a Final Environmental Impact Report and a Notice of Determination certifying that the project will not have a significant environmental effect, provided that adopted mitigation measures and monitoring plans are implemented. Key regulatory considerations include the protection of special-status species, such as the Fresno kangaroo rat and blunt-nosed leopard lizard, and compliance with flood control permits and hazardous waste packaging and labeling regulations. The project received approval from the Fresno County Department of Public Works and Planning on May 21, 2026, and from the Westlands Water District on July 21, 2026, with the latter agreeing to provide construction water for up to two years.
Solar Electric Power Generation

POSTED

5 months ago

DEADLINE

N/A
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS