Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Anaerobic Digester Design & Installation

Open
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract involves the design and installation of anaerobic digesters for prime contractors working on dairy waste management projects for the Fresno County Department of Public Works and Planning. The scope of work includes engineering digester tanks, installing mixing and gas collection systems, and integrating these components with existing dairy waste lagoons to deliver a fully operational system. The project is located in California, specifically within the 93656 zip code area. To qualify for this contract, the provider must hold a Professional Engineering license and ensure all work complies with California environmental standards. The project falls under NAICS code 237990 and was posted on June 4, 2026.

General Info

Design and install anaerobic digesters for dairy waste management projects in Fresno, California.

Documents

This scope was carved out of C-1261238.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Initial Study Application No. 7608, Unclassified Conditional Use Permit Application Nos. 3642, 3643, 3644, 3645

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Read the full solicitation package

This scope is part of a larger contract. Its documents live on the prime.

  • 1 document on the prime contractFrom Initial Study Application No. 7608, Unclassified Conditional Use Permit Application Nos. 3642, 3643, 3644, 3645
Read the prime's documents

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

Posted

subcontract

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Fresno County
ContactsNo contacts available
OfficeN/A
Organization / AgencyCalifornia → Fresno County
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Designs and installs anaerobic digesters for prime contractors on Fresno County Department of Public Works and Planning dairy waste management projects. Engineers digester tanks, installs mixing systems and gas collection systems, and integrates systems with existing dairy waste lagoons. Requires Professional Engineering (PE) license and compliance with California environmental standards. Delivers a fully operational anaerobic digestion system.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
Colgate Penstock Rebuild And Tunnel Repair Project
Solicitation # 11494
The Yuba County Water Agency is soliciting qualifications for the Colgate Penstock Rebuild and Tunnel Repair Project in Dobbins, California. This project utilizes a Construction Manager/General Contractor (CMGC) delivery method, encompassing both preconstruction and construction services. The scope is divided into two primary components: the New Colgate Tunnel Project, which involves localized demolition, concrete repair, and anchor installation, and the Colgate Penstock Rebuild Project, which includes the installation of new penstock sections, foundation construction, excavation, and instrumentation. The project follows a phased timeline with design milestones reaching 100% completion by May 2027, with construction anticipated to begin in early fall 2027. The contract will be awarded on a best-value basis, with evaluation weights focusing heavily on project understanding and approach (20%) and constructability analysis methods (20%), followed by representative project experience (15%) and long-lead procurement strategies (10%). Applicants must demonstrate significant financial and operational capacity, including a minimum bonding capacity of $300 million and general liability insurance of at least $10 million per occurrence. All work must comply with California Department of Transportation Standard Specifications and prevailing wage requirements. Submissions must be submitted electronically via the Euna portal by December 17, 2026.
Yuba County Water Agency

POSTED

about 9 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237990
New
SLED
Norwich Waterfront Revitalization
Solicitation # 27-37
The Norwich Waterfront Revitalization project, managed by the City of Norwich, Connecticut, is a comprehensive construction effort with an anticipated duration of 270 days. The base bid scope includes the construction of a restroom and mechanical building, a combined splash pad and ice rink slab with utilities, a pre-engineered band shell with a concrete stage, and various site improvements such as concrete sidewalks, plazas, stairs, retaining walls, and bituminous concrete pavements. Additionally, the project covers essential storm, water, sewer, and electrical utilities, as well as landscaping. Bid alternates include the Rose Alley Pump Station force main replacement, West Main Street access, restroom building façade upgrades, a restaurant expansion at 150 Chelsea Harbor Drive, and boat launch removal and infill. The contract will be awarded to the lowest responsible and qualified bidder, with evaluation based on skill, ability, integrity, and past performance. For projects valued at $1,000,000 or more, contractors must be prequalified by the Connecticut Department of Administrative Services. Key financial and legal requirements include a 5% bid surety, and performance and payment bonds each equal to 100% of the total proposal price. The contractor must adhere to prevailing wage rates under C.G.S. § 31-53c and maintain commercial general liability insurance. Furthermore, the contract mandates a 25% set-aside for DAS-certified subcontractors, with a specific 6.25% goal for minority, women, and disabled-owned businesses. Proposals must be submitted via the City of Norwich Procurement portal by January 11, 2027.
DAS Procurement

POSTED

about 12 hours ago

DEADLINE

in about 2 months
View Details

More opportunities from California → Fresno County

Same awarding agency

NAICS: 212321
New
SLED
CEMEX Rockfield Quarry Modification Project - Environmental Impact Report No. 7763 and Unclassified Conditional Use Permit Application Nos. 3666 and 3667
Solicitation # 2020060123
CEMEX Construction Materials Pacific LLC has applied to the County of Fresno for Unclassified Conditional Use Permits 3666 and 3667 to continue and modify aggregate mining and processing operations at the Rockfield Quarry. The project spans two locations in Fresno County: the Plant Site, covering approximately 138.5 acres, and the Quarry Site, covering approximately 352.4 acres. The total project lifespan is estimated at 100 years and is divided into two operational stages. Stage 1 involves concurrent operations at both sites for up to 30 years, including the extraction of hard rock at the Quarry Site to depths of 600 feet, the installation of a new processing plant at the Quarry Site, and the replacement of the existing asphalt plant at the Plant Site with a modern Hot Mix Asphalt plant. During this phase, annual aggregate sales are projected to increase from 1.4 million tons to 3.0 million tons over ten years. Stage 2 involves the relocation of all plant operations, including the ready-mix concrete and hot-mix asphalt plants, from the Plant Site to the Quarry Site for approximately 70 additional years. This transition eliminates interplant hauling and focuses all production and recycling of concrete and asphalt debris at the Quarry Site, maintaining annual sales of 3.0 million tons. Upon completion of mining at both sites, the land will be reclaimed as open space, riparian, and open water wildlife habitat. The project is subject to Environmental Impact Report No. 7763, which evaluates environmental effects and outlines mitigation measures under the California Environmental Quality Act guidelines.
Construction Sand and Gravel Mining

POSTED

about 22 hours ago

DEADLINE

N/A
View Details
NAICS: 221114
SLED
San Luis West Solar Project
Solicitation # 2024110679
San Luis West Solar, LLC proposes the construction and operation of the San Luis West Solar Project in southern Fresno County, California, located approximately 10 miles northwest of Kettleman City. The project consists of a 125-megawatt solar photovoltaic electric generation facility coupled with a 30-megawatt battery energy storage system. The total project area encompasses approximately 1,100 acres, including 770 acres of solar panels and associated infrastructure such as a project substation, operations and maintenance building, and transmission easement areas. The facility is designed to inject electricity into the PG&E grid, with the battery system providing energy discharge during peak electrical load periods. The project is subject to comprehensive environmental review under the California Environmental Quality Act, with a Final Environmental Impact Report completed in October 2025. Key technical assessments have been conducted regarding air quality, greenhouse gases, noise, geology, soils, and water supply. Biological evaluations have focused on the protection of special-status species, including the western burrowing owl and Crotch's bumble bee. The project also includes a detailed Reclamation Plan to ensure the site is restored to agricultural conditions following an anticipated operational lifespan of at least 35 years. Construction was anticipated to commence in 2025, with a desired commercial operation date of December 31, 2025.
Solar Electric Power Generation

POSTED

12 days ago

DEADLINE

N/A
View Details
NAICS: 221114
SLED
Rosemary Solar and Energy Storage System Complex
Solicitation # 2024110253
The Rosemary Solar and Energy Storage System Complex project involves the construction, operation, and eventual decommissioning of a 140-megawatt photovoltaic solar and battery energy storage facility in unincorporated Fresno County, California. Spanning approximately 1,172 to 1,212 acres of agricultural land, the project includes three interconnected generation sites, an on-site substation, and a generation-tie line of up to 2 miles connecting to the PG&E Crescent Substation. Additional infrastructure improvements include the reconductoring of 5 linear miles of the PG&E Helm to Crescent 70 kV transmission line and the raising of a portion of the Crescent Switching Station-Schildner 70 kV power line. The project has undergone a comprehensive environmental review process under CEQA, resulting in a Final Environmental Impact Report and a Notice of Determination certifying that the project will not have a significant environmental effect, provided that adopted mitigation measures and monitoring plans are implemented. Key regulatory considerations include the protection of special-status species, such as the Fresno kangaroo rat and blunt-nosed leopard lizard, and compliance with flood control permits and hazardous waste packaging and labeling regulations. The project received approval from the Fresno County Department of Public Works and Planning on May 21, 2026, and from the Westlands Water District on July 21, 2026, with the latter agreeing to provide construction water for up to two years.
Solar Electric Power Generation

POSTED

5 months ago

DEADLINE

N/A
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS