Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

Install 3 Aeration Ditch Mixers at Watewater Treatment Plant

Active
FA4887-09-R-0011Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract involved the acquisition and installation of three aeration ditch mixers at the Wastewater Treatment Plant at Luke Air Force Base, Arizona. The scope of work included purchasing necessary components, electrical excavation and wiring, relocating oxygen probes and associated circuitry, installing one Davit crane and three bases for mixer sites, and fabricating modifications or replacements to the existing catwalk to support the mixer installations. Additional tasks encompassed testing equipment and performing all necessary work according to the Statement of Work. The estimated project value ranged between $100,000 and $250,000 and fell under the NAICS code 237110. The contracting approach was expected to be a firm-fixed-price construction contract awarded to a single offeror. This acquisition was designated as a total HUBZone set-aside, thus restricting competition exclusively to HUBZone-certified companies. All responsible sources within this category were eligible to submit proposals, with the solicitation and related updates made available online. Communications regarding the solicitation were to be directed in writing to identified points of contact at the 56th Contracting Squadron. Notably, the solicitation was ultimately cancelled in its entirety, and the government held no obligation to reimburse any costs incurred by interested parties during the proposal process.

General Info

Acquisition of three aeration mixers at Luke AFB, HUBZone set-aside, solicitation canceled.

NAICS

237110 - Water and Sewer Line and Related Structures Construction

Place of Performance

13970 Gillespie Drive, LUKE AFB, AZ, 85309, USA

Set-Aside

HZC

Documents

5

09-R-0011-0002 Amendment - Aeration Ditch Mixers

DOC, High priority: read this first3 pages · amendment
High

09-R-0011-0003 Amendment Summary of Changes

DOC, High priority: read this first2 pages · amendment
High

09-R-0011-01 Aeration Ditch Mixers WWTP Amendment

DOC, High priority: read this first2 pages · amendment
High

09-R-0011 Aeration Ditch Mixers WWTP

DOC, High priority: read this first47 pages · rfp
High

SOW - Install 3 Aeration Ditch Mixers

DOC, High priority: read this firstsow
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

3 updates
PhaseSolicitation
Posted

Presolicitation

Notice updated

The notice description changed. The point of contact changed.

Notice updated

The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Type Changed

Presolicitation → Solicitation

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA4887 56 Cons Cc
Contacts2 people available
OfficeLUKE AFB, AZ, 85309-1217, USA
Office AddressLUKE AFB, AZ, 85309-1217, USA
Contacts
Joshua WoleryBase Operations Contracts Manager
Eric HinschContracting Officer

Full Description

Show more
NOTE: THIS SOLICITATION HAS BEEN CANCELLED IN IT'S ENTIRETY. NOTE: SEE INFORMATION ADDED TO DESCRIPTION RESTRICTING COMPETIION TO HUBZONE COMPANIES. The 56th Contracting Squadron, Luke Air Force Base, AZ intends to issue a Request for Proposal (RFP) for acquisition of aeration ditch mixers at Luke AFB, AZ. The principal work is to purchase and install 3 aeration ditch mixers at the Wastewater Treatment Plant. Type of work will consist of the following: purchasing necessary components to be installed, electrical excavation and backfill, electrical wiring, relocation of oxygen probes and associated circuitry and controls, purchase and installation of 1 Davit Crane and 3 Bases to be installed at each mixer site, and fabrication to modify or replace the existing catwalk to support the weight of the mixers as required, testing of equipment, and all other work necessary to perform said work in accordance with the Statement of Work. The magnitude of this project, expressed in dollars, is estimated between $100,000 and $250,000. The North American Industry Classification System (NAICS) number for this effort is 237110. It is anticipated that a firm-fixed price construction contract will be awarded. The Government intends to issue a single solicitation and make a single award to one offeror. This acquisition will be a competitive total HUBZone set-aside reserved ONLY for HUBZone certified contractors. All responsible sources may submit a proposal, which shall be considered by the agency. The solicitation and all subsequent notices and amendments will be posted on the Internet at http://fedbizops.gov. The Government will not reimburse any interested parties for monies spent to provide a response to the subsequent solicitation notice. Any questions in regards to this notice must be submitted in writing or via email to the Contracting Office, Joshua Wolery, joshua.wolery1@luke.af.mil, 623-856-7179, x272 or Eric Hinsch, eric.hinsch@luke.af.mil , 623-856-9665, or facsimile at 623-856-3438. Please reference Solicitation Number FA4887-09-R-0011 in your requests.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont in North Carolina with a project estimate of 16,690,000 dollars. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and comprehensive upgrades to the Morgans Branch Pumping Station. Key infrastructure improvements include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The contractor is responsible for delivering a fully operational station featuring mechanical and electrical systems, including pumps, a generator, and odor control equipment, along with new gravity sewers and manholes. The contract is a small business set-aside and will be awarded to the responsible bidder submitting the lowest responsive bid. Bids must be submitted using the EJCDC C-410 form and include a bid bond, evidence of signing authority, and MWBE compliance documentation. Performance and payment bonds are required upon award. Project administration follows EJCDC standard general and supplementary conditions, with payments processed monthly via applications for payment reviewed by the Engineer. Final acceptance is contingent upon a substantial completion inspection, the resolution of a punch list, and a final inspection conducted by the Owner, Contractor, and Engineer.
Don Moorhead Construction, Inc.

POSTED

about 7 hours ago

DEADLINE

in 20 days
View Details

More opportunities from Department Of Defense → FA4887 56 Cons Cc

Same awarding agency

NAICS: 335921
New
Federal
56 CS FOC to Flightline and Wx Equipment, Luke AFB
Solicitation # F3YCFA6173AC01
This firm-fixed-price solicitation, number F3YCFA6173AC01, is a 100 percent Small Business set-aside under NAICS 335921 for the engineering, furnishing, installation, and testing of new 12-strand single-mode fiber optic cable at Luke Air Force Base, Arizona. The project involves connecting Radar Approach Control to several critical facilities, including the Air Traffic Control Tower, Base Operations, Command Post, and various flightline and weather equipment such as Localizers, Glide Slopes, TACAN, and GATR, as well as meteorological stations. The installation will utilize a combination of existing manhole and handhole duct systems and direct burial. The contractor is responsible for providing all new, rust-proof, and corrosion-resistant materials, labor, and supervision, as no government-furnished equipment will be provided. The period of performance is not to exceed 180 calendar days, with a requested delivery date of July 1, 2027. Award will be granted to the responsible vendor with the lowest priced, technically acceptable quote, evaluated based on design, a quality control plan, and performance history via the Supplier Performance Risk System. Technical teams must be certified to EFI&T TC Comm FOTS, and supervisors must hold factory certification from equipment manufacturers. All work must comply with strict environmental guidelines regarding hazardous materials and lead-based paint, and personnel must adhere to Department of the Air Force security and base access protocols. Final acceptance is contingent upon successful OTDR and Optical Power Meter testing in accordance with TIA 526-7 and a final project walk-through.
Fiber Optic Cable Manufacturing

POSTED

1 day ago

DEADLINE

in 20 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS