Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Homeland Security was posted on April 3, 2019. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Install Condensate Return Plate Cooler

Closed
70Z0859P45958Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238220
New
WOJC - Multi-Building Plumbing Leak Repair Project
Solicitation # WOJC – Multi-Building Plumbing Leak Repair Project
Education and Training Resources is seeking quotes for a subcontracting opportunity to perform multi-building plumbing leak repairs at the Westover Job Corps Center in Chicopee, Massachusetts. The scope of work includes replacing leaking shower P-trap drain pipes in Rooms 123 and 213, repairing a cracked drain pipe in the pipe chase of Room 216, and replacing approximately ten linear feet of leaking heat pipe in both the Administration Building and King Hall. All work must comply with the Massachusetts State Plumbing Code, International Plumbing Code, and applicable federal, state, and local regulations. Contractors are responsible for all cutting, patching, and debris removal, ensuring that all materials used are new and of commercial quality. Interested bidders must submit a detailed quote by October 30, 2026, including a comprehensive cost breakdown of labor and materials, a proposed service schedule, and a bid valid for at least 60 days. Required documentation includes a current SAM.gov UEI number, active registration, W-9, business licenses, Massachusetts plumbing credentials, and certificates of liability insurance. The project is subject to various Federal Acquisition Regulation clauses, including the Davis-Bacon Act and Service Contract Act for prevailing wages, and requires the submission of weekly certified payroll reports. Award selection is at the sole discretion of ETR and is not based solely on the lowest bid. Performance and payment bonds are required for projects exceeding 35,000 dollars, with specific requirements increasing for projects over 150,000 dollars.
Westover Job Corps Center

POSTED

about 9 hours ago

DEADLINE

in 9 days

General Info

NAICS

238220 - Plumbing, Heating, and Air-Conditioning Contractors

Place of Performance

Commanding Officer, NESU Seattle ATTN: CGC MELLON 1519 Alaskan Way South Seattle, WA 98134 US, SEATTLE, WA, 98134, USA

Set-Aside

SBA

Documents

1

Updated_clauses_from_%2425K_to_%2449_999.00.docx

DOCX

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Combined Synopsis

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Homeland Security → Base ALAMEDA(00031)
Contacts1 person available
OfficeALAMEDA, CA, 94501, USA
Office AddressALAMEDA, CA, 94501, USA
Contacts
STACEY V REIDCONTRACT SPECIALIST

Full Description

Show more
1. SCOPE 1.1 Intent. This work item describes the requirements for the Contractor to remove the existing shell and tube type cooler from the steam return system and to install a plate type heat exchanger in its place. 1.2 Government-furnished property. Plate Type Heat Exchanger, NSN: 4420-01-626-5472 PN: UXP-005-M-6-UJ-12 3.1.2 Tech Rep. Not applicable. 3.1.3 Protective measures. The Contractor shall furnish and install suitable covering to seal off and protect all non-affected surfaces/equipment and spaces in the vicinity of the work area against contamination during the performance of work. Upon completion of work, remove protective material and inspect for the presence of contamination. Clean all equipment and spaces, contaminated due to improper protection, to original condition of cleanliness. 3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the below-listed: Sheathing Bulkhead insulation 3.2 General Information. The Coast Guard is going to replace the existing condensate cooler with a new plate type heat exchanger. Information on the Plate Type Heat Exchanger is listed below: Plate Type Heat Exchanger Mfr: Dover Company Model Name: Super Changer Model No.: UXP-005-M-6-UJ-12 MAWP: 150 psig @ 300 deg. F Net Wt: 149 lbs. Drawing No.: D-6-102448 Test Pressure: 195 3.3 Visual Survey. The Contractor shall perform the following work: 3.3.1 With the aid of ship's force, identify the location of the condensate cooler, shown on Detail 3-7C of CG Dwg 378 FRAM W 534-1. 3.3.2 Accompanied by the Coast Guard Inspector, inspect the area above the condensate tank in the aft starboard corner of the engine room upper level. Identify a location for the new condensate cooler. 3.4 Bilge cleaning and hotwork. The Contractor shall perform the following work: 3.4.1 Clean engine room bilges in way of the new condensate cooler installation to allow gas free certification and hot work. 3.2.4 Conduct all hotwork in accordance with SFLC Std Spec 074. All welds shall be continuous, 100% efficient welds. 3.5 Condensate Cooler Renewal. The Contractor shall perform the following work: 3.5.1 Disconnect the existing condensate cooler shown on Sheet 3 of CG Dwg 378 FRAM W 534-1. Remove the cooler and turn it over to the Coast Guard Inspector for disposition. 3.5.2 Receive the new GFM Plate Type Heat Exchanger. Transport the heat exchanger to the contractor's facility and pressure test the heat exchanger to the pressures listed on the label plate on the heat exchanger. Return the heat exchanger to the ship. 3.5.3 Fabricate and install a foundation for the new plate type heat exchanger in the location identified above. 3.5.4 Install the new GFM Plate Type Heat Exchanger onto the foundation. 3.5.4 Modify steam drain piping and condensate piping and salt water cooling supply and discharge piping to the new condensate cooler. Information on piping may be found in CG Dwg 378 FRAM W 534-1 and CG Dwg 378 W 256-1. For bidding purposes, assume 10 lin. ft. of piping for each of the four services (a total of forty (40) lin. ft. of piping) and one isolation valve for each of the four services (four (4) valves) will be required to be cropped out. Provide and install new isolation valves and new piping for each location. Relocate the temperature regulating valve in the cooler salt water discharge line to a new location nearer the new heat exchanger. All materials are to match those in the referenced drawings. Use new gaskets at each flange connection. 3.6 Inspections. The Contractor shall perform the following work: 3.6.1 In the presence of the Coast Guard Inspector, visually inspect the restored piping. 3.6.2 Conduct an operational test of the system to ensure that all flange connections are tight and that the heat exchanger is functioning properly. Conduct the operational test in the presence of the Coast Guard Inspector. 3.6.2.1 No hydrostatic testing of the new piping is required. Operationally test only. 3.7 Upon completion of system inspection, insulate all of the new piping as described in CG Dwg 378 FRAM W 508-1. Coat the new insulation in accordance with SFLC Std Spec 6310. 3.8 Touch-up preservation. The Contractor shall prepare and coat all new and disturbed exterior and interior surfaces to match existing adjacent surfaces, in accordance with SFLC Std Spec 6310, Appendix A (Cutter and Boat Exterior Painting Systems) and Appendix B (Cutter and Boat Interior Painting Systems), respectively, and as applicable. Abide by all touch-up requirements outlined in SFLC Std Spec 0000, Appendix A (Requirements for Preservation of Ship Structures). 3.8.1 Restore all interferences to their original condition in accordance with the General Requirements.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS