Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Defense was posted on June 8, 2014. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Install Radon Mitigation System

Closed
FA5270-14-R-0038Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 562910
New
Theatre Mold Remediation Scope of Work
Solicitation # AT25-0006
Solicitation AT25-0006 is a subcontracting opportunity with Adams and Associates, Inc. for comprehensive mold remediation at Theatre Building 1086 of the Atterbury Job Corps Center in Edinburgh, Indiana. The project was necessitated by a sprinkler system failure and requires the remediation of mold throughout the entire building, including the cleaning or replacement of damaged theater seating cushions. All work must be performed in accordance with ANSI/IICRC S520 standards, EPA guidelines, OSHA regulations, and the Micro Air Inc. Mold Testing report dated April 11, 2024. The contractor is required to provide a Certified Industrial Hygienist to conduct daily site visits and a final clearance walkthrough, as well as a detailed remediation plan covering containment, HEPA filtration, and waste handling. The contract will be awarded based on best value, with evaluation weights assigned to price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). Bidders must submit a single lump sum proposal on company letterhead, including a detailed cost breakdown, a timeline for substantial completion, and proof of a valid Indiana Contractor's License. Mandatory requirements include compliance with the Davis Bacon Act wage rates, a 90-day bid guarantee, and specific automobile and workers compensation insurance coverage naming Adams and Associates, Inc. as an additional insured. Performance must begin within 14 days of the Notice to Proceed, and payment is issued on Net 30 terms following the submission of certified payroll and release of liens.
Atterbury Job Corps Center

POSTED

about 10 hours ago

DEADLINE

in 19 days
NAICS: 562910
New
Maui JCC Mold Remediation and Removal of Water-Damaged Materials
Solicitation # maui-jcc-mold-remediation-removal-water-damaged-materials
Management & Training Corporation (MTC) is soliciting bids for a fixed-price, single lump sum contract to perform mold remediation and removal of water-damaged materials at the Maui Job Corps Center, specifically within Building 11. The project is necessitated by significant water intrusion following a severe windstorm on August 15, 2026. The scope of work includes the removal of mold-affected porous materials such as drywall and ceiling tiles, the implementation of HEPA-filtered negative air pressure containment to protect adjoining areas, and the remediation of structural surfaces. The estimated price range for this effort is between $25,000 and $100,000. Bids will be evaluated based on overall best value, and a physical site visit is mandatory prior to submission. For bids of $25,000 or more, contractors must provide a bid bond equal to 20% of the base bid, and the awarded contractor will be required to provide performance and payment bonds from a surety with at least an A- rating. Compliance with the Davis-Bacon Act and specific Hawaii wage determinations is required. The project is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certifications. Awardees must submit a written remediation work plan for approval and provide documentation of acceptable drying conditions upon completion. Payment is based on an approved Schedule of Values, with a 10% retainage withheld until substantial completion.
Management & Training Corporation/Hawaii/Maui Job Corps Center

POSTED

about 10 hours ago

DEADLINE

in 3 days

General Info

Contract Value

$68,904.5

NAICS

562910 - Remediation Services

Place of Performance

Okinawa, Japan, Okinawa, AP, 96368, JPN

Set-Aside

NONE

Award Issued Date

Documents

23

23_Units_Marine_Facility_List-13_Jan_2014.xlsx

XLSX

%28C%29_Cost_Est_4200.xlsx

XLSX

%28C%29_Cost_Est_4261.xlsx

XLSX

%28C%29_Cost_Est_Marine_MFH.xlsx

XLSX

2BR_4A_SADA.tif

TIF

3_BRE-4A_SADA.tif

TIF

4261-P8.pdf

PDF

4261PL2.tif

TIF

4261_PL.tif

TIF

A3-48_Model_%281%29.pdf

PDF

E-1_B4200.tif

TIF

FA5270-14-R-0038_Solicitation.pdf

PDF

Kishaba_Terrace_7.tif

TIF

Kishaba_Terrace_C3-52.pdf

PDF

Kishaba_Terrace_K3-53-C3-52.tif

TIF

Kishaba_Terrace_K3-53.pdf

PDF

PAIP_10_C3_K3_As-built_arch_compressed-KT.pdf

PDF

Plaza_4200.pdf

PDF

Qs__Aswrs__RFI_1_.pdf

PDF

Qs__Aswrs__RFI_2_.pdf

PDF

Site_Map-4200.pptx

PPTX

Site_Map-4261.pptx

PPTX

Site_Map.pptx

PPTX

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

2 updates
PhaseClosed
Posted

Combined Synopsis

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA5270 18 Cons Pk
Contacts2 people available
OfficeAPO, AP, 96368-5199, USA
Office AddressAPO, AP, 96368-5199, USA
Contacts
Ga H. HanContract Specialist
Gary WynderContracting Officer

Full Description

Show more
1a. Project EVKP 13-4283, Install Radon Mitigation Monitoring System, GOH 4200PL, Okinawa, Japan 1b. Project EVKP 13-4285, Install Radon Mitigation Monitoring System, GOH 4261PL, Okinawa, Japan 1c. Project EVKP 15-4269, Install Radon Mitigation Monitoring System, Marine Base MFH, Okinawa, Japan 2. The magnitude of this project is between $100,000 and $250,000. The general statement of the magnitude of this project is furnished for the convenience of the prospective offerors. The actual extent of work required will be governed by the contract specifications and drawings. 3. While funds are NOT presently available to fund this project, we anticipate funds will become available. If current Fiscal Year (FY 2014) funds are not available, no award shall be made. The Government reserves the right to cancel this request before award but after the closing date, when cancellation is clearly in the Government's best interest. EVKP 13-4283, Install Radon Mitigation Monitoring System, GOH 4200PL, in accordance with the Statement of Work dated 15 Apr 14 and all of its attachments. In general, the Contractor shall install a new mitigation system. The work being conducted shall include, but is not limited to the following: Conduct a pre-installation inspection, gather relevant site date, and review existing drawings and radon sampling data. Determine size, location, and configuration of mitigation system to achieve radon reduction goals, <4.0 picocuries per liter (pCi/L), for B4200. Installation: Install new mitigation system that is needed based on pre-testing results, where results yielded 4.0 pCi/L or greater. Where possible, mitigation systems shall be completed using active soil depressurization (ASD) techniques and employ sub-slab depressurization (SSD) methods. All installed exterior hardware and components shall be corrosion resistant suitable for coastal marine environments. Provide electrical wire from new suction fan to existing circuit breaker panelboad. New interior conduit shall run above ceiling as much as possible. Preparation of Final Report: Upon completion of the installation work, the Contractor shall provide a final report summarizing all field activities, and conclusions/recommendations. In addition, the Contractor shall provide (either as an appendix to the final report or a separate report) operations, maintenance and warranty information on installed systems. Include detailed photos of pre-existing conditions, work performed, and final conditions. Photos shall include unit numbers and written descriptions as necessary. EVKP 13-4285, Install Radon Mitigation Monitoring System, GOH 4261PL, in accordance with the Statement of Work dated 15 April 2014 and all of its attachments. In general, the contractor shall install a new radon mitigation system. The work being conducted shall include, but is not limited to the following: Conduct a pre-installation inspection, gather relevant site data, and review existing drawings and radon sampling data. Determine size, location, and configuration of mitigation system to achieve radon reduction goals, <4.0 picocuries per liter (pCi/L) for B4261. Installation: Install new mitigation system that is needed based on pre-testing results, where results yielded 4.0 pCi/L or greater. Where possible, mitigation systems shall be completed using active soil depressurization (ASD) techniques and employ sub-slab depressurization (SSD) methods. All installed exterior hardware and components shall be corrosion resistant suitable for coastal marine environments. Provide electrical wire from new suction fan to existing circuit breaker panelboad. New interior conduit shall run above ceiling as much as possible. Preparation of Final Report: Upon completion of the installation work, the Contractor shall provide a final report summarizing all field activities, and conclusions/recommendations. In addition, the Contractor shall provide (either as an appendix to the final report or a separate report) operations, maintenance and warranty information on installed systems. Include detailed photos of pre-existing conditions, work performed, and final conditions. Photos shall include unit numbers and written descriptions as necessary. EVKP 15-4269, Install Radon Mitigation Monitoring System, Marine Base MFH (23 Various Buildings), in accordance with the Statement of Work dated 18 Apr 14 and all of its attachments. In general, the contractor shall install a new radon mitigation system. The work being conducted shall include, but is not limited to the following: Conduct a pre-installation inspection, gather relevant site data, and review existing drawings and radon sampling data. Determine size, location, and configuration of mitigation system to achieve radon reduction goals <4.0 picocuries per liter (pCi/L) for each housing unit. Installation: Install new mitigation system that is needed based on pre-testing results, where results yielded 4.0 pCi/L or greater. Where possible, mitigation systems shall be completed using active soil depressurization (ASD) techniques and employ sub-slab depressurization (SSD) methods. All installed exterior hardware and components shall be corrosion resistant suitable for coastal marine environments. Provide electrical wire from new suction fan to existing circuit breaker panelboad. New interior conduit shall run above ceiling as much as possible. Preparation of Final Report: Upon completion of the installation work, the Contractor shall provide a final report summarizing all field activities, and conclusions/recommendations. In addition, the Contractor shall provide (either as an appendix to the final report or a separate report) operations, maintenance and warranty information on installed systems. Include detailed photos of pre-existing conditions, work performed, and final conditions. Photos shall include unit numbers and written descriptions as necessary. 4. The Contractor shall complete Proj No. EVKP 13-4283 and EVKP 13-4285 within 98 calendar days after receiving Notice to Proceed (See Statement of Work for CLINS 0001 and 0002). Concurrently, the Contractor shall complete Proj No. EVKP 15-4269 within 186 calendar days after receiving Notice to Proceed (See Statement of Work for CLIN 0003). The Exchange Yen Rate is $1.00= - 103.9439. The statement of RFI is due 7 days before (5 June 14) the proposal due date (12 June 14).

More opportunities from Department Of Defense → FA5270 18 Cons Pk

Same awarding agency

NAICS: 221320
Federal
DCDO Septic Tank and Sewage Treatment Maintenance
Solicitation # FA527027QB006
The United States Air Force 18th Contracting Squadron is soliciting quotations for a single-award, firm-fixed-price requirements contract to provide septic tank and sewage treatment plant maintenance services for the Defense Communications Detachment Okinawa (DCDO) in Okinawa, Japan. The contract encompasses a base period from December 1, 2026, to November 30, 2027, with four subsequent option periods extending the total performance through November 30, 2031. The scope of work includes implementing a Preventive Maintenance Inspection Service program, performing general maintenance and repairs, and responding to routine service calls within 24 hours. All maintenance personnel must be certified plant operators approved by the Government of Japan Ministry of Public Health and Welfare. Award will be granted to the responsible offeror whose proposal is determined to be the most advantageous to the government, with price serving as the primary evaluation factor. To be considered responsible, quoters must submit current Industrial Waste Disposal or Collection and Transportation Business licenses. Deliverables include quarterly work reports and personnel access lists submitted one week prior to starting work. The contractor must also adhere to strict marking and labeling standards for any delivered items per MIL-STD-130 and MIL-STD-129. Quotations must be submitted electronically by October 26, 2026, and must include a detailed pricing breakdown via the provided Price Exhibit.
Sewage Treatment Facilities

POSTED

12 days ago

DEADLINE

in 5 days
View Details
NAICS: 236210
Federal
Sources Sought
Solicitation # FA527027R0008
The Department of the Air Force, through the 18th Contracting Squadron, is conducting market research via a Sources Sought notice to identify qualified contractors for the construction of ten Earth Covered Magazines (ECMs) at Kadena Air Base in Okinawa, Japan. The project, planned for the 2027 to 2029 timeframe, requires the delivery of blast-resistant storage infrastructure for munitions and explosives. The scope of work includes engineering and constructing reinforced concrete structures with heavy-duty floors, structural walls, and roof slabs, as well as installing reinforced steel blast doors and applying dense earth cover for safety and containment. Additional requirements include the installation of lightning protection systems, grounded electrical infrastructure, perimeter security, demolition, site preparation, utilities, paving, and environmental abatement. Interested respondents must demonstrate specialized experience in constructing hardened concrete structures and explosive storage facilities within the last five years, specifically within force protection and controlled-access areas. Contractors must possess the legal authority, licensing, and operational footprint to work in Japan, including SOFA compliance and potentially a Japanese branch office or joint venture. The government is seeking information on capabilities regarding design-build or progressive design-build delivery methods and is evaluating whether to utilize a standard FAR-based contract or an Other Transaction Agreement (OTA) pursuant to 10 U.S.C. 2808a. Qualified firms must submit a company profile and a comprehensive questionnaire to the designated points of contact by October 21, 2026.
Industrial Building Construction

POSTED

12 days ago

DEADLINE

in about 13 hours
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS