Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Defense was posted on March 17, 2016. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Install Well Sensors on 6 Scattered Sites

Awarded
HHSI-16-235-SOL-00009Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 811310
New
Kubota M8200 Clutch Replacement
Solicitation # kubota-m8200-clutch-replacement
Management and Training Corporation is soliciting lump sum fee proposals for the clutch replacement of a Kubota M8200 tractor with front wheel assist, located at the Earle C. Clements Job Corps Center in Morganfield, Kentucky. The scope of work requires a qualified contractor to provide all transportation, labor, materials, and equipment to diagnose and repair the clutch assembly and power take-off system. Key technical requirements include replacing friction discs, bearings, oil seals, and O-rings, resurfacing the flywheel, and replacing hydraulic pipes and filters as needed. The contractor must perform all work according to manufacturer specifications and provide a final summary of diagnostic findings, an itemized list of replaced parts, and warranty documentation upon completion. This solicitation is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified entities. Bids must be submitted via email to Angie Mahoney by 3:00 PM CST on November 3, 2026, and must include a bid sheet, proof of insurance, a completed supplier packet with a W-9, and applicable SBA certification letters. Award decisions will be based on best value, with a focus on administrative compliance and technical qualifications. The contract is subject to various Federal Acquisition Regulations, including standards for combating trafficking in persons, Buy American restrictions, and Service Contract Labor Standards per Wage Determination 2015-4687 Revision 31 for Kentucky.
Earle C. Clements Job Corps Center

POSTED

about 1 hour ago

DEADLINE

in 5 days
NAICS: 811310
New
SLED
SMDOT Elevator Maintenance
Solicitation # 12701633
The City of Santa Monica Department of Transportation (SMDOT) is soliciting bids for turnkey maintenance, inspection, and repair services for three hydraulic elevators located at 1620 6th Street. The equipment includes two passenger elevators and one freight elevator, specifically models AAK137, AA2986, and AEP227. The scope of work requires monthly systematic examination, lubrication, and repair of critical components, as well as monthly emergency recall and override testing in accordance with California Administrative Code Title 8, Section 3000(h). All provided materials must be new and meet Original Equipment Manufacturer standards. Bids must be submitted electronically via the OpenGov portal by December 3, 2026, at 3:00 pm. Qualified bidders must possess a valid C-11 California contractor's license and provide a maintenance supervisor to ensure compliance with safety requirements. The contract award is based on a weighted evaluation of experience and technical competence (25%), ability to meet work plans and timelines (25%), cost (20%), stability and references (10%), value add (10%), and quality control (10%). The City is not required to select the lowest monetary bidder. Key contractual requirements include a payment bond for awards exceeding 25,000 dollars, a Living Wage Certification for awards over 54,200 dollars, and compliance with the Oaks Initiative and ADA Title II. Successful bidders must provide a Certificate of Insurance naming the City of Santa Monica as an additional insured. Payment terms are net thirty days. The agreement includes an initial term with four subsequent annual renewal options.
D600 DEPT OF TRANSPORTATION - SaMoDOT

POSTED

about 15 hours ago

DEADLINE

in about 1 month
NAICS: 811310
New
SLED
CNG Fueling Station Maintenance and Repair Services
Solicitation # 2026-RFP-0441
The County of Sacramento is soliciting proposals under solicitation 2026-RFP-0441 to establish a contract for Compressed Natural Gas (CNG) fueling station preventative maintenance and repair services. The contract covers two facilities located at the Fleet Services Division and the Department of Airports. The selected contractor must provide certified CNG technicians to perform twice-monthly preventative maintenance and major services at 4,000 and 8,000-hour benchmarks. Service requirements include 24/7 availability, with on-site response times mandated within 48 hours for standard service calls and 24 hours for emergency calls. All work must adhere to manufacturer specifications and Cal/OSHA safety standards, including the provision of GHS Safety Data Sheets. The contract is designed for an initial one-year term with the option for four additional one-year extensions upon mutual agreement, with a scheduled award date of December 14, 2026. Award decisions will be based on factors other than price alone, utilizing a points-based scoring system that evaluates cost and the proposer's technical approach. Bidders must provide a Public Works and Prevailing Wage Contractor Registration number and are encouraged to utilize the County's Procurement Opportunities Program for small and micro-business preferences. Proposals must be submitted electronically via the SacCountyE bids portal by the final extended deadline of November 13, 2026.
DGS: CAPSD - Procurement

POSTED

about 16 hours ago

DEADLINE

in 15 days
NAICS: 811310
New
SLED
ELEVATOR & ESCALATOR MAINTENANCE, INSPECTIONS, AND TESTING
Solicitation # BPM059230
The Maryland Department of Transportation Maryland Transit Administration (MDOT MTA) is soliciting bids for a firm-fixed-price contract, AGY-26-001-MT, to provide comprehensive maintenance, inspection, and testing for elevators, escalators, and wheelchair lifts across various Metro stations in Maryland. The scope of work includes systematic preventive maintenance, emergency repairs, and deep cleaning to ensure all equipment remains in first-class operating condition in accordance with ASME A17.1 and A17.2 standards. The contract features a five-year base period with a total basis of award calculated at 4,750,000 dollars, which includes a 950,000 dollar allowance for reimbursable parts and materials. Bidders must maintain an operational office within 20 miles of Baltimore and provide certified mechanics with at least three years of documented experience. Award will be granted to the responsible bidder offering the lowest total price. Key procurement goals include a 17 percent Minority Business Enterprise (MBE) and a 1 percent Veteran-owned Small Business Enterprise (VSBE) participation rate. Bidders must possess at least three years of firm experience with comparable equipment and provide proof of significant insurance coverage, including 1 million dollars in general liability and 5 million dollars in pollution liability. Bids are due by November 12, 2026, and must include a bid bond, a contract affidavit, and detailed pricing for preventive maintenance and hourly labor rates. Performance is measured by the completion of specific checklist tasks rather than labor hours, and the contractor is required to submit safety reports within 24 hours of any incident.
Maryland Transit Administration

POSTED

about 17 hours ago

DEADLINE

in 14 days
NAICS: 811310
New
SLED
WOOHDR30R - Overhead Door Repairs and Maintenance - MDOT/SHA Worcester County
Solicitation # WOOHDR30R
Solicitation WOOHDR30R is an Invitation for Bids issued by the Maryland State Highway Administration for the preventative maintenance and repair of 27 overhead doors and their related operators at the Worcester County Shop locations in Snow Hill and Berlin. The scope of work requires semi-annual 20-point inspections and on-call repair services with a mandatory response time of four business days. All repairs must be performed by technicians with at least two years of experience, adhere to manufacturer specifications and building codes, and utilize new, first-quality parts. The contractor is required to provide a not-to-exceed cost quotation before performing any repair work and must submit detailed written reports following each service visit. The contract will be awarded to the responsive and responsible vendor offering the lowest total bid price. To qualify, bidders must demonstrate at least two years of continuous professional experience in overhead door services, be registered with the State Department of Assessments and Taxation, and possess their own employees, equipment, and vehicles without the use of subcontractors. Required submission documents include the eMMA Price Form, a Bid/Proposal Affidavit, and reference checks from the last five years. Payment is processed through the Snow Hill Shop, with specific billing requirements for trip charges, manlift usage, and materials priced at or below retail cost or MSRP. All work must comply with MOSH and OSHA safety regulations.
State Highway Administration

POSTED

about 18 hours ago

DEADLINE

in 20 days

AI Contract Overview

Show more

This firm fixed price contract requires the installation of sounding tubes and level sensors at six separate groundwater well sites. The contractor is responsible for providing all labor and materials, including In-Situ Level TROLL 400 and BaroTROLL sensors, PVC sounding tubes, and necessary electrical conduit and boxes. All work must be completed within 60 days of the award, with specific site requirements for locations such as Point Arena and Original Sherwood Valley. Strict adherence to AWWA C654-03 standards is required for installation and disinfection, and wells cannot return to service until negative bacteriological test results are obtained. The contractor must submit a work plan for approval by the Project Engineer before starting. Payment is issued on a per-completed-site basis following verification by the Contracting Officer's Representative, with no payment provided for partially completed sites.

General Info

Contract Value

$44,746.7

NAICS

811310 - Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance

Place of Performance

CA, USA

Set-Aside

NONE

Award Issued Date

Documents

1

SF1449_16-235-SOL-00009_with_Sections_-_Well_Sensors.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

1 update
PhaseAwarded
Posted

Combined Synopsis

Notice updated

Response deadline changed from Mar 14, 2016 to Mar 15, 2016. The notice description changed. The point of contact changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W075 Endist Sacramento
Contacts1 person available
OfficeSACRAMENTO, CA, 95814-2922, USA
Office AddressSACRAMENTO, CA, 95814-2922, USA
Contacts
Ronda EnglishContract Specialist

Full Description

Show more
Amendment 0001 extends the due date and time for bids only. PERFORMANCE WORK STATEMENTGROUNDWATER WELL LEVEL SENSORS (22Feb16) 1.1 GENERAL General Information: This is a Performance based project for commercial services to include installation of sounding tube and level sensors at 6 separate sites (Attachment A-Sites Map). Contractor shall take care to limit contamination during installation of sounding tube and level sensor. This may include but not be limited to a clean lay down area for removed downpipe. Contractor to follow procedures as per AWWA C654-03. Wells shall not be put back into service until negative test results are obtained. Project engineer has final say as to when the well may be put back into service. Level sensor wet end is rigid 8.5 inches. Dry end is rigid 3-4 inches. No tight bends through conduit are allowed. Minimum cable radius of 0.54 inch is required. See installation instructions for details. 1.2 INVOICE AND PAYMENT Payment shall be per completed well site as per the pricing schedule for the amount of work accomplished. Invoices shall be verified by the Contracting Officer's Representative (COR) before payments can be authorized. This includes installation of sounding tube, level sensor, barometric sensor, termination point, and other necessary appurtenances. No payment shall be made for partially complete sites. 1.3 PERFORMANCE REQUIREMENTS A. All sites shall be completed within 60 days after award. Contractor shall coordinate work with the tribe and Indian Health Service to avoid disruption of provision of water to the community. The contractor is to provide all labor, skills, and materials necessary to complete all sites in accordance with the PWS, and the contract terms and conditions of purchase order. B. Final invoice shall be marked "FIANL INVOICE" C. Once (1) copy of the invoice with any supporting documentation shall be transmitted via email or U.S. mail to: 1.4 SUBMITTALS A. WORK PLAN: The Contractor shall submit a work plan to the Project Engineer. This work plan shall include the following: proposed installation dates and method to exit well head for the level sensor cable. The Contractor shall not perform work until a work plan is approved by the Project Engineer. B. Contractor shall submit bacteriological testing results as per AWWA C654-03 1.5 QUALITY ASSURANCE Perform work in accordance with all terms and conditions of the PWS and acceptance by the COR. Quality Assurance Surveillance Plan (QASP) (Exhibit 1) outlines the performance requirement of this PWS. Each completed site will be inspected by COR before acceptance by the Government. 1.6 SUBMITTALS AT PROJECT CLOSEOUT A. Accurately record depth of installation of level sensor, and modifications to the well head. 1.7 MATERIALS A. LEVEL SENSOR: In-Situ Level TROLL 400. PSIA rating to be based on individual well characteristics. See attachment for details. Cable to be In-Situ Rugged Cable System with twist-lock connectors and non-vented poly cable. See attachment for length of cable for each well. B. BAROMETRIC SENSOR: In-Situ BaroTROLL. C. SOUNDING TUBE: 1-inch threaded PVC Schedule 40. Shall meet NSF 61 certification. See attachment for length of sounding tube for each well. D. WATERPROOF GROMMET AT WELL HEAD: In-Situ grommet or approved equal. See attachment for type of wellhead and necessary grommet. E. ELECTRICAL BOX AND ELECTRICAL CONDUIT 1. Electrical Box: a. Minimum dimensions: 11"H x 8"W x 3"D b. Type 2 to be installed in pump house. Type 4 to be installed on cedar post. 2. Electrical conduit: a. Suitable for above-ground use (UV-resistant) and adequate size to pull level sensor cable dry end. Level sensor dry end is rigid 3-4-inch (approx.) in length with 0.75-inch diameter. No tight bends in conduit are allowed. Cable requires minimum radius of 0.54 inch. See installation instructions for details. 3. Cedar Post (if necessary) a. 4" x 4" cedar post, minimum 7 feet in length. EXECUTION 1.8 LEVEL AND BAROMETRIC SENSORS AND SOUNDING TUBE INSTALLATION A. Install sounding tube in well casing. The sounding tube shall be threaded 1" PVC schedule 40 pipe. Install to 5-10 feet above pump set level. B. Install In-Situ Level TROLL 400 down sounding tube. Entire Level TROLL sensor to extend just beyond the bottom (wet end) of the sounding tube (less than 18 inches beyond end of tube). Provide sufficient cable to terminate in a new electrical box in the existing pump house or at a new cedar post. C. If necessary tap wellcap to provide egress for level sensor. Provide waterproof grommet. Additional alternative is to replace wellcap. D. Cable shall be secured by Kellems grip outside of wellcap in order to facilitate removal of sensor. Kellems grip may be installed in J-Box or approved equal. Penetrations shall have waterproof seals. E. For Level TROLL cable run from well head to pump house, install conduit for above-ground service. For termination at cedar post install conduit for appropriate service (above-ground conduit for surface run and buried conduit for underground portion). F. Install cedar post where necessary. Bury minimum 2 feet in concrete base. G. Install electrical box in pump house or on cedar post with galvanized bolts. H. Terminate Level TROLL 400 and BaroTROLL in electrical box. I. Contractor shall replace all existing appurtenances in their existing locations and configurations (minus authorized changes) after installation of the sounding tube and level sensor. The appurtenances include but are not limited to the well pump, electrical cable, down pipe, vent caps, pitless adapter, and well cap. Sounding tube and electrical cable shall be taped to down pipe using NSF 61 tape. Duct tape is not allowed. Contractor to verify pump is operational upon completion of work. 1.9 SITE SPECIFIC INSTALLATION REQUIREMENTS All sites to provide for elements in this document except as noted in section 1.9. A. The raw water source at Kashia is provided by an infiltration gallery and wet well. A sounding tube is not required for this site only. B. Point Arena regularly experiences floods five feet above ground level. Install galvanized post instead of cedar post minimum seven feet above ground level. Secure in concrete base. Install electrical box six feet above ground surface. Provide water proof at conduit. C. Use existing panel and posts at Manchester to terminate Level Troll and Baro Troll. D. The well casing at Original Sherwood Valley is currently 1 - inches above the slab. The well casing shall be raised to a height of 18 inches. 1.10 WELL DISINFECTION AND BACTERIOLOGICAL ANALYSIS A. After installation of sounding tube and level sensors, disinfect groundwater well with a chlorine solution and perform bacteriological testing as per AWWA C654-03. B. DO NOT use dissolved granular HTH for disinfection. C. Positive bacteriological results require repeated well disinfection and samples retaken until negative results are obtained. Contractor shall notify Project Engineer of positive bacteriological results within 24 hours. 1.11 CLEANING A. Restore the well site to its original condition. Remove or bury all drill tailings to restore surface profile to its original condition. 1.12 GOVERNMENT FURNISHED EQUIRPEMENT Government Furnished Equipment. None ? Exhibit 1 Performance Requirements Summary (Quality Assurance Surveillance Plan) Performance Objective Standard Performance Threshold Method of Surveillance PRS #1 Installation of Eastside Site 1-Sherwood site. The Contractor shall be complete installation of site 1-Eastside Sherwood 100% Method of Surveillance: Will be reviewed and accepted by the Contracting Officer's Representative. PRS #2 Installation of Site 2-Original Sherwood site. The Contractor shall be complete installation of site 2-Original Sherwood 100% Method of Surveillance: Will be reviewed and accepted by the Contracting Officer's Representative. PRS #3 Installation of Site 3- Kashia site. The Contractor shall be complete installation of site 3-Kahia 100% Method of Surveillance: Will be reviewed and accepted by the Contracting Officer's Representative. PRS #4 Installation of Site 4-Enterprise site. The Contractor shall be complete installation of site 4- Enterprise 100% Method of Surveillance: Will be reviewed and accepted by the Contracting Officer's Representative. PRS #5 Installation of Site 5-Manchester Well #1 site. The Contractor shall be complete installation of site 5 -Manchester Well #1 site 100% Method of Surveillance: Will be reviewed and accepted by the Contracting Officer's Representative. PRS #6 Installation of Site 6-Point Arena site. The Contractor shall be complete installation of site 6- Point Arena 100% Method of Surveillance: Will be reviewed and accepted by the Contracting Officer's Representative. ATTACHMENT B - PRICE SCHEDULE The Contractor shall provide all labor, materials, and supplies necessary to successfully complete all requirements described in the attached Performance Base Work Statement, Contract Clauses and Provisions, and all other attachments. This is a firm fixed priced contract. Quantity Price Site 1 1 Each $ (Eastside Sherwood) Site 2 1 Each $ (Original Sherwood) Site 3 1 Each $ (Kashia) Site 4 1 Each $ (Enterprise) Site 5 1 Each $ (Manchester Well #1) Site 6 1 Each $ (Point Arena) TOTAL $ Pricing Schedule Notes 1. Prices must be submitted on all individual items of this CLIN Schedule. Failure to do so may cause the proposal to be determined "unacceptable". 2. If a modification to a price based on unit price is submitted which provides for a lump sum adjustment to the total estimated price, the applications of the lump sum adjustment to each unit price in the CLIN Schedule must be stated. If it is not stated, the offeror agrees that the lump sum adjustment shall be applied on a pro rata basis to every item in the CLIN Schedule. 3. The offeror shall distribute indirect costs (overhead, profit, bond, etc.) over all the items in the CLIN Schedule. The Government will review all submitted CLIN Schedules for any unbalancing of the items. Any submitted CLIN Schedule determined to be unbalanced may cause the proposal to be determined "unacceptable". 4. In the event there is a difference between a unit price and the extended total, the unit price will be held to be the intended proposed price. If the offeror shows only the total price but fails to enter a unit price, the total divided by the estimated quantity will be held to be the intended unit price. 5. Arithmetic Discrepancies - For the purpose of initial evaluation of offers, the following will be utilized in resolving arithmetic discrepancies found on the face of the CLIN Schedule as submitted by the offeror: (a) obviously misplaced decimal points will be corrected; (b) apparent errors in addition of CLIN will be corrected. 6. The Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the option(s). 7. Those line items containing an * in the quantity field are deemed to be an estimated quantity, reference FAR 52.211-18 -- Variation in Estimated Quantity. End Amendment 0001 extends the due date from 14Mar16 at 1300L to 15Mar16 at 1300L. All other terms and conditions remain the same.

More opportunities from Department Of Defense → W075 Endist Sacramento

Same awarding agency

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS