Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Florida was posted on October 18, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Installation of Electrical Connection for Retrofitted Residential City Grinder Control Panels for Low Pressure Pump Systems

Closed
#20240151State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 221320
New
Federal
Y--GRCA 257282 - Replace Wastewater Plant at South Ri
Solicitation # 140P2026R0101
Solicitation 140P2026R0101 is an unrestricted full and open competition Invitation for Bid issued by the National Park Service, DSC Contracting Services Division, for the replacement of the South Rim Wastewater Treatment Plant at Grand Canyon National Park, Arizona. The project involves the construction of a GD Membrane Bio-Reactor wastewater treatment plant, including new treatment facilities, administrative and support buildings, and process systems. The scope of work encompasses complete demolition and removal of existing infrastructure, site preparation, grading, paving, fencing, and improvements to the facility access road. A critical requirement is that the existing plant must remain in permitted operation until the new facility is accepted by the government, and the contractor must provide a 12-month operational support period. The contract is a firm-fixed-price acquisition with a magnitude exceeding 100 million dollars. The mandatory period of performance is 1095 calendar days, scheduled from February 1, 2027, to February 1, 2030. Award will be based on a multi-factor, best-value tradeoff process evaluating technical experience, technical approach, key personnel experience, and price. Required deliverables include a detailed commissioning plan covering startup sequencing, operator training, and regulatory coordination. The contractor must furnish performance and payment bonds and comply with union prevailing wage rates, Department of the Interior cybersecurity requirements, and ADA/ABA accessibility standards.
Dsc Contracting Services Division

POSTED

1 day ago

DEADLINE

in 20 days
NAICS: 221320
New
SLED
RFB-758-2700000186-1 | Water and Wastewater Operations, Maintenance, Monitoring
Solicitation # RFB-758-2700000186-1
Solicitation RFB-758-2700000186-1 is a request for bids issued by the Kentucky Department of Military Affairs to secure a contractor for comprehensive water and wastewater operations, maintenance, monitoring, and repair services at Bluegrass Station. The scope of work encompasses the wastewater treatment and collection systems, the stormwater system, and the drinking water distribution system. The selected contractor will be responsible for providing all management, labor, equipment, and administrative support, including specialized electrical services for pumps and motors, laboratory coordination, and emergency response. The contract is structured with an initial one-year term and includes the option for four additional two-year extensions. The award will be determined using a Best Value Ranking Approach, where price accounts for 90 points and business experience accounts for 10 points, with a minimum requirement of three years in business. Bidders must provide documentation of their business history and hold current Kentucky Class II certifications for both Wastewater Operator and Collection System Operator roles. Mandatory requirements include minimum insurance coverage of 1,000,000 dollars for both automobile and professional liability, compliance with the Equal Employment Opportunity Act of 1978, and adherence to Section 504 of the Rehabilitation Act of 1973. All bids must be submitted electronically via the Vendor Self Service portal by November 16, 2026.
Department of Military Affairs

POSTED

2 days ago

DEADLINE

in 18 days
NAICS: 221320
Federal
Operations and Maintenance (O&M) Services for the SBIWTP
Solicitation # 191BWC26R0009
Solicitation 191BWC26R0009, issued by the International Boundary and Water Commission, seeks a contractor to provide Firm Fixed Price Operations and Maintenance (O&M) services for the South Bay International Wastewater Treatment Plant (SBIWTP) in San Ysidro, California. The contract is structured with a base year running from June 1, 2027, to May 31, 2028, and multiple option years extending through May 2031. A primary objective of the scope is managing plant operations, SCADA systems, and maintenance during the facility's expansion from 25 MGD to 50 MGD. The contractor must ensure 24/7 staffing, including a bilingual operator, and maintain strict compliance with the National Pollutant Discharge Elimination System (NPDES) permit and other regional water quality board regulations. Award will be based on the Highest Technically Rated with a Fair and Reasonable Price method, where non-price factors—such as plant operations, permit compliance, and staffing—are significantly more important than cost. Key requirements include the designation of a Project Manager, Superintendent, Site Safety and Health Officer, SCADA Specialist, and Asset Manager. The contractor is responsible for a wide array of deliverables, including a Phase-In Plan, Preventative Maintenance Plan, and monthly performance reports. Security is a high priority, requiring background investigations for personnel and adherence to NIST standards for protecting Controlled Unclassified Information. Performance will be monitored via a Quality Assurance Surveillance Plan focusing on regulatory compliance, uptime, and effluent quality.
Internat Boundary And Water Commission

POSTED

9 days ago

DEADLINE

in 2 months

AI Contract Overview

Show more

This contract involves the installation of new electrical wiring for existing residential properties, specifically targeting low pressure grinder systems and associated control panels. The work includes running individual branch circuits from the existing electrical panel to control panels, with wiring specifications varying based on system type—three-wire cables with ground for grinder systems protected by GFCI devices and disconnect boxes rated at 60 amps, and a minimum of #12 AWG copper wiring for pumps and control circuits. The wiring must be installed within specified distances, with the exterior disconnect box positioned at a height of 40 inches above the finished floor and located within five feet of the front corner of the home, aligned with local and state electrical codes, including the 2023 editions of the Florida Building Code and the National Electrical Code. All installations are subject to inspection by the Port St. Lucie Building Department to ensure compliance. The contractor is responsible for coordinating with utility providers, scheduling installations with homeowners prior to circuit activation, and obtaining necessary permits through owner-approved legal documentation. Any upgrades to existing electrical services or routing requests beyond standard procedures will incur additional costs borne by the homeowner. Safety is emphasized, requiring immediate notification of any imminent electrical hazards and recommending licensed electrical contractors for dangerous situations. The contract also mandates adherence to current codes and ordinances, with the contractor responsible for scheduling inspections and ensuring all work meets regulatory standards. The project is overseen by the City of Port St. Lucie, with a response deadline of November 18, 2024, and a contract value estimated between $500,000 and $1,500,000.

General Info

Place of Performance

FL, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyFlorida → City of Port St. Lucie
Contacts1 person available
OfficeN/A
Office AddressN/A

Full Description

Show more
For the existing residence, new individual branch circuit wiring shall be installed from the existing electrical distribution equipment (panel) to the control panel. For Low Pressure Grinder Systems the new individual branch circuit wiring shall be a three (3) wire cable and a ground wire and (non- fused, 60 A,) Disconnect Box. Wiring will be a minimum size of #12AWG and shall be protected with a GFCI two-pole-20-amp over current device two hundred thirty (230) volt. For Low Pressure Grinder Systems the new individual branch circuit wiring shall be a two (2) wire cable and a ground wire and (non- fused, 60 A,) Disconnect Box. Wiring will be a minimum size of #12AWG and shall be protected with a GFCI single-pole-20-amp over current device one hundred twenty (120) volt. Pump power minimum wire size 12-gauge copper conductor (75-C). Control circuit minimum wire size 12-gauge copper conductor (75-C). The wire size is based on less than one hundred (100) feet. Acknowledges distance between electrical control box and Low Pressure Grinder  Tank will not exceed twenty-five (25) feet. NOTE: As of April 1993, installation requires two (2) separate breakers on same phase in panel box.The exterior weather proof (non- fused, 60 A) Disconnect Box with blank cover and wire shall be forty (40) inches above finished floor and located on the side of the home within five feet of the front corner (same corner as sewer lateral). Height of panel shall be a minimum of three and a half (3 ½) feet or forty-two (42) inches and a maximum of four and a half (4 ½) feet or fifty-four (54) inches. All electrical equipment and installations shall meet the most current adopted edition of the Florida Building Code 2023 and/or National Electrical Code 2023 and all applicable state and local codes and ordinances.  The Port St. Lucie Building Department will be inspecting the electrical system to ensure full compliance with the National Electrical Code 2023 and/or the FBC 2023 whichever is more stringent. If an upgrade to the existing service is required and/or the homeowner requests an electrical routing, other than the standard direct route, the additional cost will be paid by the homeowner.  If during execution of any portion of the Contract, the Contractor observes an imminent danger involving the electrical system, the Contractor shall immediately notify the homeowner and recommend, in writing, that the homeowner contacts a licensed electrical contractor to remove the danger. Upon receiving a work order from the Utility Department, the Contractor shall give the Utility Department a schedule for installation and completion.  It shall be the responsibility of the Contractor to schedule installation with each individual homeowner, prior to use of the new individual branch circuit wiring. Permits and Inspections - Contractors shall utilize the Owner Permit Acknowledgment and Authorization form as required whenever a request for a building permit is submitted by a contractor, on behalf of the property owner. This form is a legal document and must be completed and notarized prior to permit submittal.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS