Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Defense was posted on July 5, 2017. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Installation of Fiber Optic Cable from B949 to B1384, Osan AFB(MATOC only)

Closed
W90VN6-17-R-0024Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237130
New
SLED
Installation of Buried Fiber Optic Cable Stanton North Substation to Hoskins Substation
Solicitation # 26085
The Nebraska Public Power District is soliciting bids for Request for Bid No. 26085 to install approximately six miles of underground fiber optic cable between the Stanton North and Hoskins Substations in northeast Nebraska. The scope of work encompasses all labor, materials, and supervision required for staking, material coordination, property owner contacts, and right-of-way restoration. Specifically, the contractor will install 48-strand buried fiber optic cable provided by the contractor and 48-strand all-dielectric fiber provided by the District. The project must adhere to RUS Form 515a and IEEE Standard 1333-1994 for guided boring. Work is expected to be awarded by November 25, 2026, with a final completion deadline of April 15, 2027. Bids are due by November 13, 2026, and must include a completed pricing spreadsheet and current all-inclusive equipment and labor rates. Evaluation factors for the award include quoted price, conformance with specifications, past schedule performance, and the bidder's financial responsibility and experience. To qualify, bidders must certify the completion of at least three similar buried fiber optic installation projects within the last five years. Payment terms specify that 95 percent of the price is paid within 30 days of acceptable performance, with 5 percent retained until final acceptance. An optional pre-bid teleconference is scheduled for November 5, 2026, to review contract specifications.
Nebraska Public Power District

POSTED

about 11 hours ago

DEADLINE

in 15 days
NAICS: 237130
New
Federal
B21 Utilities & Site Improvements, Communications & Electrical Infrastructure, Dyess AFB OT Feasibility & Business Feedback
Solicitation # W9126G27R1CSY
The U.S. Army Corps of Engineers, Fort Worth District, is conducting market research via a Sources Sought notice for the B-21 Utilities and Site Improvements project at Dyess Air Force Base, Texas. This initiative aims to establish high-reliability primary electrical power distribution and dedicated fiber-optic communications infrastructure to support the bed-down of the B-21 weapons system. The scope includes the installation of single-mode fiber optic cables, telephone system expansion, power cabling in concrete encased ducts, pole-mounted conductors, and associated transformers and switchgear. The project also encompasses site improvements such as earthwork, grading, and erosion control. The estimated Construction Cost Limitation is $28,550,000, though an $8 million electric substation and specific end-user network equipment are expressly excluded from this contract. The government is currently evaluating whether to utilize a traditional Federal Acquisition Regulation based contract or an Other Transaction Agreement under 10 U.S.C. section 2808a. If a collaborative procurement framework is chosen, a two-phase selection process will be implemented, focusing first on technical capability, past performance, and collaborative execution history, followed by an evaluation of final technical and price proposals. The project must adhere to strict Department of Defense standards, including UFC 1-200-01 for general building requirements, UFC 4-010-01 for antiterrorism, and UFC 4-010-06 for cybersecurity of facility-related control systems. The anticipated period of performance is 690 calendar days from the notice to proceed, with a required beneficial occupancy date of March 8, 2030.
W076 Endist Ft Worth

POSTED

about 12 hours ago

DEADLINE

in 14 days
NAICS: 237130
New
SLED
De Palma Road Electrical Conduit Installation Project
Solicitation # TLARC-819
The County of Riverside is soliciting bids for the De Palma Road Electrical Conduit Installation Project (Project No. D4-0072) located in the Community of Horsethief Canyon, California. The project involves the excavation and backfill of approximately 1,000 feet of trenching, the installation of 685 feet of 1.5-inch and 350 feet of 3-inch electrical conduit and handholes, and the installation of 6-inch Type D concrete curb per County Standard No. 204. All work must adhere to Southern California Edison plans and be completed within 30 working days from the commencement date specified in the County's written order. The estimated project cost is 209,000 dollars. The contract will be awarded to the lowest responsive and responsible bidder. Bidders must submit their proposals by December 2, 2026, at 1:30 P.M. Pacific Time, including a non-collusion declaration and a bid guarantee of 10 percent of the total bid. The awarded contractor must provide performance and payment bonds, comply with California State Labor Code prevailing wage requirements, and adhere to specific affirmative action plans based on contract value and employee count. Payments will be made monthly, with the Owner paying 90 percent of the value of labor and materials incorporated into the work and 75 percent of materials stored on site, subject to certification by the Architect.
COUNTY OF RIVERSIDE

POSTED

about 16 hours ago

DEADLINE

in about 1 month
NAICS: 237130
New
SLED
Installation Of Street Lighting On Raymond Avenue From Maple Street To North City Limits
Solicitation # 2026-IFB-CIV-0549
The City of Pasadena Department of Public Works is soliciting bids under solicitation number 2026-IFB-CIV-0549 for the installation of a new street lighting system on Raymond Avenue, extending from Maple Street to the North City Limits. The project requires the contractor to furnish and install concrete street lighting standards, foundations, LED luminaires and fixtures, conduits, conductors, pull boxes, and other appurtenant work. Key technical deliverables include 29W or 50W LED replacements, galvanized steel conduits, and 6 foot Type S Scroll Arms. The contractor must provide all necessary labor, materials, and equipment, ensuring compliance with the ADA, CBC, Title 24, and PROWAG accessibility guidelines. Bids must be submitted electronically via the City of Pasadena eProcurement Portal by 2:00 pm on November 17, 2026. Qualified bidders must provide evidence of experience with two similar governmental projects and submit several mandatory documents, including Form AA-1, Form AA-2 for labor exceeding 25,000 dollars, a non-collusion declaration, and a DHS contract disclosure. A bid security of five percent of the total bid price is required, and the successful awardee must provide material and faithful performance bonds for 100 percent of the base bid. Work must commence within 15 calendar days of the Notice to Proceed and be completed within 20 working days. Invoicing is handled through the city's Vendor Invoice Portal, with payments issued on Tuesdays and Thursdays.
City of Pasadena Department of Public Works

POSTED

about 16 hours ago

DEADLINE

in 19 days
NAICS: 237130
New
SLED
115kV Transmission Line 1266 Rebuild Stanton North Substation to Dead-End Structure 79
Solicitation # 26-012
Nebraska Public Power District is soliciting sealed bids for Contract No. 26-012 to rebuild approximately 4.05 miles of the 115kV transmission line 1266, extending from the Stanton North substation to Dead-End Structure 79. The scope of work requires the contractor to provide all labor, supervision, equipment, and miscellaneous materials to replace all structures, conductors, shield wires, and hardware. Key technical deliverables include the installation of 28 wood H-Frame tangent structures and one tubular steel monopole dead-end on a drilled pier, upgrading the conductor to 954 kcmil 45/7 ASCR Rail, and installing 0.551 diameter fiber optic ground wire and EHS steel shield wire. The project also involves tree clearing, site preparation, and the removal of existing structures and conductors. Bids are due by 2:00 p.m. CST on December 2, 2026, and must be submitted as sealed hard copies to the Procurement Department in Columbus, Nebraska. The award will be based on the lowest cost and best bid, with evaluation factors including technical conformance, schedule capability, financial standing, and past performance history. Prospective bidders are encouraged to attend an optional pre-bid teleconference and site visit on November 23, 2026. Required submission documents include a signed proposal page, a completed price quotation table, a W-9 form, and bid security in the form of a certified check, irrevocable letter of credit, or bid bond. The successful contractor must provide a performance bond and maintain workers compensation and commercial general liability insurance.
Nebraska Public Power District

POSTED

1 day ago

DEADLINE

in about 1 month

General Info

NAICS

237130 - Power and Communication Line and Related Structures Construction

Place of Performance

AP

Set-Aside

NONE

Documents

5

W90VN6-17-R-0024-0001.pdf

PDF

W90VN6-17-R-0024-0002.pdf

PDF

W90VN6-17-R-0024-0003.pdf

PDF

W90VN6-17-R-0024-0004.pdf

PDF

W90VN6-17-R-0024.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

5 updates
PhaseClosed
Posted

Combined Synopsis

Notice updated

The notice description changed.

Deadline changed

Response deadline changed from Jun 23, 2017 to Jun 29, 2017.

Notice updated

Response deadline changed from Jun 29, 2017 to Jul 12, 2017. The notice description changed.

Notice updated

The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → 0906 Aq Co Contracting Bat
Contacts1 person available
OfficeAPO, AP, 96202-0000, USA
Office AddressAPO, AP, 96202-0000, USA
Contacts
Chong Nak Kim

Full Description

Show more
"THIS IS A NON-WORK PLAN TASK ORDER FOR THE FOLLOWING MATOC CONTRACTORS ONLY" ONLY Proposals for this requirement are being solicited from the MATOC contractors for the following MATOC contracts issued by 411th Contracting Support Brigade (CSB). Proposals from offerors other than these MATOC contractors will not be considered for award. Contract Number: W91QVN-14-D-0031, 0032, 0033, 0035, 0036, 0037, 0038,0039, 0040, 0041, 0044, 0045, 0046, 0047, 0048, 0049 and 0050. A. Site Visit: Offerors who intend to propose on this solicitation are strongly encouraged to attend site visit. See site visit Clause FAR 52.236-27 Alt I in Section L. Offerors are required to have a valid Korean Identification card when attending the site visit orientation B. SUBMISSION OF PROPOSAL a. The PRICING PORPOSAL shall be submitted by 13:00 hours on the closing date. b. Technical proposal: 1.Offer Breakdown 2. Section K C. Submission of Proposal: See Section L for details. If the contractor is unable to submit the proposal in response to this RFP, the contractor shall submit the "No-offer letter" by date and time specified in this solicitation.

More opportunities from Department Of Defense → 0906 Aq Co Contracting Bat

Same awarding agency

NAICS: 325120
New
Federal
Propane Gas Delivery to Osan Air Base
Solicitation # W90VN627Q1CQ7
Solicitation W90VN6-27-Q-1CQ7 is a single-award requirements contract for the delivery of full 50 kg propane tanks to designated facilities at Osan Air Base. The contract follows a five-year period of performance, consisting of a 12-month base period and four 12-month option years, with an estimated annual quantity of 1,440 tanks. The contractor is responsible for providing all vehicles, equipment, labor, and supervision necessary to perform the work, which is generally conducted Monday through Friday between 0730 and 1600 Korea Standard Time. This is a firm-fixed-price contract with an economic price adjustment clause allowing for price modifications if the applicable index moves by plus or minus 10 percent after the initial six months. To be eligible, offerors must possess valid Republic of Korea business licenses, including Korea LPG Business Registration and hazardous materials transport certifications, and must submit all pricing in Korean Won. Award is based on a two-factor evaluation of technical capability and price; technical capability is rated as acceptable or unacceptable based on licensing and a minimum of one relevant contract reference from the past five years. Only technically acceptable quotes will be considered, with the award going to the responsible offeror providing the best value. Performance requires strict adherence to ROK safety regulations and EM 385-1-1 safety and occupational health standards, with the government reserving the right to perform spot checks on deliveries.
Industrial Gas Manufacturing

POSTED

1 day ago

DEADLINE

in about 6 hours
View Details
NAICS: 332999
New
Federal
ACTIVE VEHICLE BARRIERS AND ASSOCIATED CONTROL SYSTEM AT OSAN AIR BASE
Solicitation # W90VN626QA017
Solicitation W90VN626QA017 is a commercial acquisition conducted under the Logistic Cost Sharing program for the purchase, installation, and integration of DoD Anti-Ram Listed Active Vehicle Barrier (AVB) systems and associated Access Control Point (ACP) control systems at the Morin and Main Gates of Osan Air Base, Republic of Korea. The contractor is responsible for a turn-key scope of work including the demolition and disposal of existing barriers, all necessary civil, electrical, and foundation site work, and the complete installation and power integration of new equipment. A critical component of the project involves complex Programmable Logic Controller (PLC) reprogramming to synchronize operations across gatehouses, overwatch booths, vehicle inspection centers, and traffic lights to ensure fail-safe security functionality during both normal operations and power-loss conditions. Technical requirements specify that equipment must be listed on the DoD Anti-Ram Vehicle Barriers List, with H30/P1 rated barriers required for the Morin Gate and M50/P1 or M50/P2 rated barriers for the Main Gate. Performance standards mandate a powered deployment time of 1.5 seconds or less and a power-loss deployment time of 5 seconds or less. The government will award a firm-fixed-price contract based on the lowest-priced, technically acceptable offer with an acceptable past performance rating. Quotes must be submitted electronically via the PIEE Solicitation Module in four separate volumes, including a redacted technical volume and a price volume in Excel format. Following multiple amendments, the final response deadline is November 4, 2026, with an estimated delivery date of July 30, 2027.
All Other Miscellaneous Fabricated Metal Product Manufacturing

POSTED

3 days ago

DEADLINE

in 5 days
View Details
NAICS: 561790
New
Federal
Cleaning of Food Service Exhaust Fans and Ducts for Dining Facilities in USAG Yongsan-Casey.
Solicitation # W90VN827RA001
Solicitation W90VN827RA001 seeks a contractor to provide non-personal cleaning services for kitchen exhaust systems, including hoods, ducts, and rooftop exhaust fans, for 33 dining facilities under the jurisdiction of USAG Yongsan-Casey in South Korea. The primary objective is to mitigate fire hazards caused by grease accumulation, with all work required to comply with NFPA 96 and Army Regulation 420-1. The contract is structured as a firm-fixed-price agreement with a total potential duration not to exceed 66 months, consisting of a base period, three option years, and a phase-out period. Services are generally performed monthly, with the exception of the Koryosan DFAC, which requires semi-annual cleaning. Award will be based on best value, evaluating technical capability, past performance, and price. Technical evaluation specifically requires offerors to possess a valid ROK Government business license, a Hygiene Management Permission License, and an Annual Hygiene Training Certificate for 2026. Proposals must be submitted via the PIEE Solicitation app in three separate volumes, with strict page limits for technical and past performance sections and a prohibition on pricing data within the technical proposal. The government maintains a high quality standard, allowing no more than one defect per year, with a requirement for remediation within 24 hours of notification.
Other Services to Buildings and Dwellings

POSTED

6 days ago

DEADLINE

in about 2 hours
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS