Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Installation of Signage by Wedgewood Weddings and Events at The Headquarters

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The project involves the installation of signage at Wedgewood Weddings and Events located at The Headquarters in San Diego, California, with work limited to mounting two exterior illuminated reverse channel letter signs on the east and south walls, a vinyl sign, a flush-mounted blade sign, and signage on the existing monument panel. The illumination for the channel letters will not exceed 2700 Kelvins, and the entire installation is scheduled to be completed over approximately three days in Fall 2025 using a crew of two workers and equipment including a boom lift and hand tools. There will be no walkway closures during the work, and the project is not expected to generate significant vehicle trips or environmental impacts related to air quality, greenhouse gas emissions, or traffic. The tenant is responsible for ensuring compliance with all applicable federal, state, and local regulations concerning construction debris, hazardous materials, stormwater management, and historic resources. The work qualifies for categorical exemption under CEQA Guidelines Sections 15301 and 15311 as it involves minor alterations to an existing facility and accessory structures without expanding its use or altering its structural integrity. The San Diego Unified Port District is the lead agency overseeing the project, with Betsy Viramontes serving as the primary point of contact. Karen Garcia, Project Manager for Wedgewood Weddings and Events, is the applicant representative. No formal contract number, solicitation, or pricing structure is documented; however, administrative fees totaling $200 were paid through VITALCHEK for environmental filings, and the payment reference is tied to an order number associated with the San Diego County Clerk’s Office. No FAR clauses, certified representations, socioeconomic status disclosures, or contractual provisions such as options, key personnel requirements, or inspection criteria beyond general compliance with environmental laws were explicitly included in the documentation. The place of performance is 789 West Harbor Drive, Suite 148, San Diego, California, and all deliverables are tied to on-site installation with no shipping, packaging, or delivery terms specified.

General Info

Install two illuminated signs, vinyl, blade sign, and monument panel signage at San Diego location in Fall 2025 with no service disruptions.

Agency

California → San Diego Unified Port District

NAICS

238290 - Other Building Equipment ContractorsView NAICS

Place of Performance

San Diego, CA

Set-Aside

NONE

Documents

(1)

2025-129 Installation of Signage by Wedgewood Weddings and Events NOE

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → San Diego Unified Port District
Contacts2 people available
OfficeN/A
Organization / Agency
California → San Diego Unified Port District
Office AddressN/A
Contacts
Karen GarciaProject Manager
Betsy ViramontesPlanner I

Full Description

Show more
The proposed project would consist of the installation of signage at Wedgewood Weddings and Events by Wedgewood Weddings and Events (Applicant) at The Headquarters in the city of San Diego, California. Work to specifically complete the proposed project would involve the installation of two (2) exterior illuminated reverse channel letters signs on the east and south facing walls, a vinyl sign, a flush mounted blade sign, and signage on the existing panel of the existing monument. The proposed illumination on the signage would not exceed 2700 Kelvins. Sign installations are anticipated to occur in Fall 2025, would take approximately three (3) days to complete and would require a crew of approximately two (2) workers. Equipment required to complete the proposed project would include a boom lift and hand tools. There would be no closures of the walkways during the installation period. Due to its nature and limited scope, construction of the proposed project would generate a minor amount of vehicle trips and would require limited use of equipment. Therefore, impacts related to air quality, greenhouse gas emissions, and transportation and traffic are not anticipated to occur. Furthermore, the Tenant would be responsible for complying with all applicable federal, state, and local laws and regulations regarding construction demolition debris, hazards and hazardous materials, stormwater, and historic resources.

Similar Contracts

Same NAICS industry code