Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Subcontract opportunity from California was posted on September 16, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Interior Finishes and Specialties

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238390
New
Federal
Weatherproofing Units
Solicitation # N6339427Q4006
This solicitation, N6339427Q4006, is a total small business set-aside for the procurement, delivery, and on-site assembly of a turnkey weatherproofing system for forty-one wood-framed modular workspace units at Naval Base Ventura County in Port Hueneme, California. The project covers 58,772 square feet of aggregate surface area, consisting of thirty 12x36 foot units and eleven 12x16 foot units. The required system must utilize a minimum 10-mil virgin polyethylene resin film with UV inhibitors and flame-retardant additives meeting NFPA 701 standards. Protection must extend from the bottom chassis to the roofline, excluding the bottom 3-foot poly stilts, using non-penetrating fastening methods such as 3/4-inch woven polyester strapping with a 1,500 lb break strength. The contractor is responsible for all surface preparation, precision fitting, and the provision of all necessary equipment, including scissor lifts and safety gear. Performance includes a twelve-month maintenance period with recurring inspections every 60 to 90 days and emergency repair responses. Award will be based on the lowest priced, technically acceptable offer, with technical capability evaluated against specific part numbers and past performance assessed on a pass/fail basis. The period of performance is scheduled from December 7, 2026, to December 6, 2027. All electronic invoicing must be processed through the Wide Area Workflow system, and final acceptance is contingent upon a joint site walkthrough and a comprehensive quality assurance demonstration.
Commanding Officer

POSTED

1 day ago

DEADLINE

in 13 days

AI Contract Overview

Show more

This subcontract for Interior Finishes and Specialties involves performing finish work and installing facility specialties for prime contractors at Levi's Stadium on behalf of Forty Niners Stadium Management Company LLC. The scope of work includes the installation of flooring, wall finishes, and specialized fixtures such as adult changing tables. All work must be completed in accordance with manufacturer installation requirements and the California Building Code, with the creation of mockups required to ensure quality standards. The project is located in Santa Clara, California, under NAICS code 238390. The solicitation was posted on September 16, 2026, with a response deadline of October 22, 2026. The primary objective is the delivery of completed interior finishes and the successful installation of all specified specialty equipment.

General Info

Subcontract for interior finishes and specialty installations at Levi's Stadium in Santa Clara.

Place of Performance

Santa Clara, CA, 95054, USA

Set-Aside

NONE

Documents

This scope was carved out of RFB-FY26-0101.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Levi’s Stadium Adult Changing Facility Project

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Forty Niners Stadium Management Company LLC
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs finish work and installs facility specialties for prime contractors on Forty Niners Stadium Management Company LLC projects at Levi's Stadium. Installs wall finishes, flooring, and specialized adult changing tables and fixtures. Creates mockups and follows manufacturer installation requirements and California Building Code. Delivers completed interior finishes and installed specialty equipment.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS