This Solicitation opportunity from New York was posted on October 13, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
PDF, High priority: read this firstmwbe-participation-guidance
HighAI Summary for 12-MWBE Goal Participation Information Packet: This document from Harris County outlines the Minority- and Woman-Owned Business Enterprise (M/WBE) participation goals for a procurement project, setting a 17.14% participation target. It details the requirements for bidders to submit a completed M/WBE Utilization Plan and supporting documentation demonstrating good faith efforts to meet the goal. The document specifies accepted certifications, criteria for significant local presence, and rules for counting M/WBE participation, including subcontracting and joint ventures. It also covers the use of trucking firms for goal credit and the necessity for M/WBEs to perform a commercially useful function. The guidance aims to ensure fair opportunities for historically underutilized businesses in the County's procurement process.
PDF
PDF, High priority: read this firstwage-determination
HighAI Summary for 14-Q3 - 2025 - Harris County Road and Bridge Prevailing Wage Rates: This document provides the prevailing wage rates for road and bridge construction workers in Harris County, Texas, for the third quarter of 2025. It includes detailed payroll submittal instructions, wage rate compliance requirements, and penalties under Texas Government Code Chapter 2258. The document lists specific worker classifications and their corresponding hourly wage rates, covering various construction roles such as operators, laborers, and specialized trades. It also outlines contractor responsibilities for certified payroll submissions and compliance monitoring by the Contract Compliance Officer.
PDF
PDF, High priority: read this firstproject-manual
HighAI Summary for 2025 White Oak Bayou Major Repairs Project Manual: This Project Manual for the 2025 White Oak Bayou Major Repairs, prepared by Engineer of Record Robert G. Powell of Huitl-Zollars Inc., dated August 13, 2025, contains contract conditions and specifications for the Harris County Flood Control District project E100-00-00-X200. It includes general and special contract conditions, references to Harris County Flood Control District and City of Houston standard specifications, and detailed articles covering definitions, preliminary matters, indemnification, regulatory requirements, materials, site conditions, work prosecution, change orders, payment, and miscellaneous provisions. The manual serves as the primary contractual and technical document guiding the project execution.
PDF
PDF, High priority: read this first9 pages · mwbe-utilization-plan
HighAI Summary for 8-MWBE Utilization Plan Commitment Form Rev. 10/2024: This document is the Minority and Woman-Owned Business Enterprise (M/WBE) Utilization Commitment Form, revised in October 2024. It is used by bidders to commit to M/WBE participation goals on a project, either meeting or documenting good faith efforts if goals are not met. The form includes sections for project identification, prime company information, utilization plan summary, and disclosure of M/WBE subcontractors. It requires certification details, percentages of participation, and contact information. The form becomes part of the contract and is reviewed for compliance with Harris County M/WBE policy.
PDF
PDF, High priority: read this first10 pages · procedure-compliance
HighAI Summary for 9-MWBE Trucking Procedure Compliance Packet: This document, Rev. 0 dated 2/2025, outlines the M/WBE Trucking Procedure Compliance for the Department of Economic Equity and Opportunity. It details requirements for ensuring Commercially Useful Function (CUF) including ownership, operation, and management responsibilities of M/WBE trucking firms. Key points include M/WBE firms must own and operate trucks with their own drivers, manage trucking operations, and avoid contrived arrangements. The document specifies credit rules for transportation services, leasing conditions, and subcontracting. It also lists required submittal documentation such as W-9, insurance, and proof of truck ownership. Additionally, it provides guidance on courtesy utilization plan reviews and contact information for the Harris County DEEO.
PDF
PDF, High priority: read this first1 page · ifb
HighAI Summary for Bid Acknowledgement for IFB: This document is a Bid Acknowledgement form related to an Invitation for Bid (IFB). It certifies that the bid is submitted without collusion or fraud and that the signer is authorized to bind the bidder to the terms of the IFB. The form requires details such as project job number, project description, authorized signature, company information, and contact details. It is intended for use in the bidding process for construction, service, or material procurement under the IFB.
PDF
PDF, High priority: read this first1 page · bid-bond-form
HighAI Summary for Bid Bond and Bid Check Authorization Form: This document is the Bid Bond Confirmation and Bid Check Return Authorization Form for Harris County. It provides instructions for submitting a cashier's check in lieu of a bid bond, including physical drop-off details and requirements for the check to be payable to Harris County. The form requires completion of either Section A for Bid Bond details or Section B for Cashier's Check details. It outlines conditions under which bid checks are retained or returned, and authorizes Harris County to return bid checks via regular mail. The form includes fields for bidder information and is dated with a revision of 3/24/21.
PDF
PDF, High priority: read this firstgeotechnical-report
HighAI Summary for HCFCD 2024 White Oak Bayou Major Repairs Geotechnical Report: This geotechnical investigation report, dated 2024, was prepared by Geotest Engineering, Inc. for the Harris County Flood Control District (HCFCD) project E100-00-00-X200 involving major repairs to White Oak Bayou near Durham Drive and Shepherd Drive in Harris County, Texas. The report includes site exploration, soil borings, laboratory testing, groundwater measurements, and slope stability analyses. It provides detailed subsurface soil and groundwater conditions, engineering analyses, and recommendations for concrete slope lining repairs. The report is authorized under a Subconsultant Agreement dated May 20, 2024, and includes appendices with boring logs, laboratory test summaries, site photos, and backup calculations.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for HCFCD 2025 White Oak Bayou Major Repairs Unit Price Schedule and General Notes: This document is part of the Harris County Flood Control District (HCFCD) project E100-00-00-X200 for the 2025 White Oak Bayou Major Repairs. It includes a detailed unit price schedule listing pay items such as traffic control, construction fence, debris removal, excavation, concrete channel lining, and other construction-related tasks with quantities and units. The document also contains general notes outlining construction guidelines, site preparation, material handling, and field adjustments. The version is from 2024 and provides critical technical specifications and quantities for bidding and contract execution.
PDF
PDF, High priority: read this first1 page · safety-requirement
HighAI Summary for Heat Protection Safety Requirement Guidance: This document outlines the Heat Protection Safety Requirement for workers involved in the project. It mandates inclusion of weather-related safety measures in the project Safety Plan, specifically addressing extreme heat and cold conditions. Key provisions include a Heat Awareness Plan for temperatures over 90 degrees, with requirements for acclimatization, water, rest, and shade. The document emphasizes the Prime Contractor's responsibility to provide necessary accommodations during adverse weather. Vendors acknowledge and agree to comply with these safety requirements by signing the Bid Acknowledgement at submission.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Specifications for Channel Repairs White Oak Bayou 2025 - Harris County Flood Control District: This document contains the specifications for the channel repairs project for White Oak Bayou (2025) under the Harris County Flood Control District (HCFCD). It includes the scope of work, mandatory pre-bid conference details, special requirements, compliance with Texas Government Code on prevailing wages and bonds, bid submission instructions, and payment terms. The document references additional project manuals and drawings available through Bonfire. It emphasizes mandatory attendance at the pre-bid conference, submission of certified payrolls, and adherence to prevailing wage laws. The document is intended to guide bidders in preparing their bids accurately and understanding the contractual obligations and project requirements.
PDF
PDF, High priority: read this first2 pages · insurance-requirements
HighAI Summary for TWCC Rule 110.110 Workers Compensation Insurance Requirements: This document outlines the Texas Workers' Compensation Insurance Coverage requirements under TWCC Rule 110.110 for building or construction contracts. It defines key terms such as certificate of coverage and duration of the project, and mandates that contractors provide and maintain workers' compensation insurance coverage for all employees and subcontractors throughout the project duration. The document details the obligations for providing certificates of coverage to the governmental entity before contract award and during the project, retention of certificates, notification of coverage changes, and posting of notices at project sites. It also specifies contractual requirements for subcontractors and the consequences of non-compliance, including contract breach and penalties. The document was last revised in April 2002.
PDF
PDF, Low priority1 page · other
LowAI Summary for Bid Guaranty and Performance Bond Requirements - Harris County: This document outlines the bid guaranty and performance/payment bond requirements for bidders in Harris County. It specifies that a guaranty must be submitted with each bid, either as an individual bid bond or a bank cashier's check for 5% of the bid amount. The successful bidder must furnish a performance/payment bond within ten days after contract award. The bond must be executed by an authorized surety company and submitted using the prescribed form from Harris County. Failure to submit the bond within the timeframe may render the award ineffective. Verification of bond validity is required before payments are made.
PDF
PDF, Low priority1 page · other
LowAI Summary for Flood Control District Minimum Insurance Requirements: This document outlines the minimum insurance requirements for contractors working with the Harris County Flood Control District. It specifies the types and limits of insurance coverage required, including Workers Compensation, Commercial General Liability, Automobile Liability, Umbrella/Excess Liability, and Professional/Errors & Omissions Liability if applicable. The document also details conditions such as naming the Flood Control District as an additional insured, insurance company ratings, evidence of insurance certificates, and notification requirements for policy changes. The document was last revised in August 2017.
PDF
PDF, Low priority15 pages · other
LowAI Summary for Harris County Contractor Safety Record Policy and Questionnaire: This document outlines the Harris County Contractor Safety Record Policy, adopted to ensure contractors prioritize worker health and safety. It includes findings on workplace injuries and costs, the policy's purpose, scope, applicability, and exemptions. The policy applies to contracts over specified values procured after March 1, 2023, with several contract types exempted. Definitions relevant to the policy are provided. Certification requirements mandate contractors and subcontractors to certify safety-related conditions, including OSHA violations and criminal convictions related to workplace incidents. The policy aims to improve project quality by reducing injury-related costs and enhancing productivity.
PDF
PDF, Low priority6 pages · other
LowAI Summary for Harris County General Requirements for Bids: This document outlines the general requirements for bids submitted to Harris County. It includes instructions on bid submission, access to records, payment methods, addenda, assignment restrictions, award criteria, bid completion and returns, bond requirements, certification of interested parties, debarment certification, color selection, and compliance with federal, state, and local laws. The document emphasizes ethical business practices and provides contact information for reporting suspected ethical violations or fraud. It serves as a comprehensive guide for vendors to ensure their bids meet all county specifications and legal requirements.
LowAI Summary for Tax Residence Certification Form for Harris County Texas: This document is a Tax Residence Certification form used for advertised projects in Harris County, Texas. It collects taxpayer identification, company information, and business registration status in Texas. The form requires listing taxable property owned in Harris County, disclosure of any debts owed to Harris County, and certification of residency status according to Texas Government Code §2252.001. The form distinguishes between resident and nonresident bidders for governmental contracts. The version of the form is revised as of November 2009.
Response deadline changed from Oct 13, 2025 to Oct 20, 2025. The notice title changed. NAICS code changed from 237990 to 334111. The notice description changed.
Response Deadline
Deadline has passed
Submission Closed
Find active opportunities like this
Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.