Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from North Carolina was posted on December 4, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

ITB #2026-23003 Construction for Middle Creek Stream Stabilization

Closed
440-2026-23003State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
San Vicente and Mt. Olivette Reservoir Improvements Project - Construction
Solicitation # SP2797-CT
The San Vicente and Mt. Olivette Reservoir Improvements Project (SP2797-CT) is a construction solicitation issued by the City of Santa Monica's Public Works Engineering Division. The project involves addressing civil, mechanical, structural, and electrical deficiencies for four water reservoirs located at the Mt. Olivette Reservoir and the San Vicente Reservoir. With a project estimate of $27,344,000, the work requires a contractor holding a Class A General Engineering license. The estimated contract duration is 730 calendar days, although some contract documents reference a term of 520 days from the notice to proceed. Liquidated damages for delays are set at $13,200 per day. Bids must be submitted electronically via the OpenGov Procurement portal, with a final deadline of October 29, 2026, at 3:00 PM PT. Submission requirements include a bid guarantee of at least 10 percent of the bid amount and certification of a mandatory pre-bid job walk. Awarded contractors must provide Labor and Material Payment and Performance Bonds for 100 percent of the contract sum. The scope of work includes strict adherence to local noise ordinances, prevailing wage requirements, and technical specifications for potable water materials and electrical labeling. Performance is subject to inspection by the City and its designated engineers at both the project site and the place of manufacture.
D500 PUBLIC WORKS - ENGINEERING DIVISION

POSTED

about 9 hours ago

DEADLINE

in 9 days
NAICS: 237990
New
SLED
FDC-214-102565.1
Solicitation # FDC-214-102565
Project FDC-214-102565.1 involves the demolition of an existing concrete dam and associated infrastructure at Ryerson Station State Park in Richhill Township, Greene County, Pennsylvania. Managed by the Pennsylvania Department of Conservation and Natural Resources, the scope of work encompasses site preparation, including the installation and removal of erosion and sediment control measures and the implementation of a traffic control plan. Technical requirements include stripping and stockpiling topsoil, surface water control, dewatering subgrades, excavation, and the placement of select fill. The project concludes with site restoration, including topsoil application and seeding in all disturbed areas. All work must adhere to specific ASTM International standards for soil analysis and compaction, and the contractor is required to provide a complete set of as-built drawings upon completion. The contract will be awarded to the lowest responsible and responsive bidder, with an engineer's estimate exceeding 1 million dollars. Bidders must meet mandatory participation goals of 19 percent for Small Disadvantaged Businesses and 3 percent for Veteran Business Enterprises. Required securities include a bid guaranty, a 100 percent performance bond, a 100 percent material and labor payment bond, and a 50 percent maintenance bond. Contractors must comply with extensive Pennsylvania state labor laws, including the Prevailing Wage Act and the Construction Workplace Misclassification Act. Payments are processed via Automated Clearing House, and the contractor is responsible for engaging an independent testing laboratory for quality control services, subject to oversight by the Department's quality assurance program.
Commonwealth of Pennsylvania - Department of Conservation and Natural Resources

POSTED

about 15 hours ago

DEADLINE

in 15 days

AI Contract Overview

Show more

The contract involves the construction and restoration of approximately 265 linear feet of stream along Middle Creek in Holly Springs, North Carolina, to address significant erosion issues on the right bank. This degradation threatens nearby infrastructure and poses risks to adjacent residential properties. The project scope includes stream restoration, floodplain reconnection, bank rebuilding, and installation of in-stream stabilization structures designed to prevent further erosion and protect the surrounding environment. Issued by the Town of Holly Springs, the solicitation for this project was posted on December 4, 2025, with a response deadline of January 28, 2026. The contracting opportunity is identified as ITB #2026-23003 and is overseen by a primary point of contact named Kelli Hyde. The work is to be performed within North Carolina, specifically targeting the Middle Creek area, and aims to enhance environmental stability while safeguarding community assets.

General Info

This project involves the restoration of a portion of stream along Middle Creek in Holly Springs, North Carolina. The stream is currently experiencing excessive erosion along its right bank and is beginning to threaten existing infrastructure and will soon encroach along residential property. The project involves the construction of approximately 265 linear feet of restored stream, reconnected floodplain, rebuilt bank, and in-stream structures.

Documents

2

Project No. 23-003: Middle Creek Stream Stabilization

PDF, High priority: read this firstitb
High

Project No. 23-003: Middle Creek Stream Stabilization

PDF, High priority: read this firstitb
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyNorth Carolina → Town of Holly Springs
Contacts1 person available
OfficeNC, USA
Office AddressNC, USA
Contacts
Kelli Hyde

Full Description

Show more
This project involves the restoration of a portion of stream along Middle Creek in Holly Springs, North Carolina. The stream is currently experiencing excessive erosion along its right bank and is beginning to threaten existing infrastructure and will soon encroach along residential property. The project involves the construction of approximately 265 linear feet of restored stream, reconnected floodplain, rebuilt bank, and in-stream structures.

More opportunities from North Carolina → Town of Holly Springs

Same awarding agency

NAICS: 541320
SLED
RFQ 27-0928 Carolina Springs Park Master Plan
Solicitation # 440-27-0928
The Town of Holly Springs is seeking qualifications from licensed engineering and landscape architecture firms to provide professional master planning and design services for the 25-acre Carolina Springs Park located at 7300 Woods Creek Road. The project scope encompasses project management, existing conditions analysis, community and stakeholder engagement, and the development of three conceptual master plan alternatives. The final deliverable will be a preferred master plan that includes a detailed framework for future design, budgeting, and construction, along with planning-level cost estimates, a phasing and implementation strategy, and digital GIS/CAD files. All designs must incorporate ADA accessibility and universal design considerations. Firms will be selected based on demonstrated competence in accordance with North Carolina General Statutes, with a preference granted to resident firms. Evaluation criteria are weighted by project approach (40 points), firm qualifications and experience (25 points), key staff qualifications (25 points), and the proposed schedule (10 points). Cost and fee information will not be considered during the selection process; instead, the Town will negotiate a fair and reasonable fee with the most qualified firm. The anticipated contract award is expected in January 2027. Qualified respondents must submit a single navigable PDF file by November 4, 2026, and must provide proof of professional liability insurance exceeding 5 million dollars per occurrence and aggregate.
Landscape Architectural Services

POSTED

28 days ago

DEADLINE

in 7 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS