This Solicitation opportunity from Texas was posted on June 19, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
The Harris County Flood Control District is soliciting bids for the construction of the Blue Bell Stormwater Detention Basin under Project ID P518-12-00-E001, funded by FEMA. The solicitation, issued as ITB 26/0183, was posted on June 19, 2026, with a response deadline of July 13, 2026, at 7:00 PM CT. The project is located in Texas and aims to enhance regional flood resilience by developing a stormwater detention facility designed to manage runoff and reduce downstream flooding risks. All work must be performed in accordance with applicable federal, state, and local regulations, with particular emphasis on FEMA compliance and flood risk mitigation standards. Maria Heinzmann is the primary point of contact for questions and submissions, reachable via email at [email hidden]. The contract is open to qualified contractors with the capacity to deliver large-scale civil infrastructure projects in compliance with hydrological engineering specifications and environmental safeguards. Bidders are expected to demonstrate experience in similar flood control constructions and provide detailed plans for scheduling, safety, quality control, and regulatory coordination.
General Info
Harris County seeks qualified contractors to build FEMA-funded Blue Bell Stormwater Detention Basin in Texas by July 13, 2026.
PDF, High priority: read this first1 page · bid-addenda-acknowledgement
HighAI Summary for Attachment A - Bid Addenda Acknowledgement: This document is Attachment A titled 'Bid & Addenda Acknowledgement' related to an Invitation for Bid (IFB). It includes sections for acknowledging receipt of all addenda associated with the solicitation, with space to list addendum numbers and dates or indicate if no addenda were received. It also contains a bid acknowledgement section where the authorized representative certifies the bid is made without collusion, agrees to abide by all IFB conditions, and confirms the pricing and statements are true and correct. The document requires signatures and company information from the bidder and includes a section for internal acceptance by Harris County officials. This form is essential for bid submission compliance and verification.
PDF
PDF, High priority: read this firstm-wbe-utilization-plan
HighAI Summary for Attachment A - Bid Addenda Acknowledgement - M/WBE Utilization Commitment Form: This document is the Minority- and Woman-Owned Business Enterprise (M/WBE) Utilization Commitment Form associated with a bid addenda acknowledgement. It includes sections for bidders to commit to M/WBE participation goals, submit Letters of Intent for subcontractors, or document Good Faith Efforts if goals are not met. The form requires detailed information about the prime company, M/WBE subcontractors, and their certification status. It also contains instructions and tips for compliance with Harris County M/WBE policies, including certification agencies and participation requirements. The form is intended to be submitted with the bid and becomes part of the contract with Harris County.
PDF
PDF, High priority: read this firstbid-schedule
HighAI Summary for Attachment B - Bid Schedule - MWBE Participation and Utilization Plan: This document is Attachment B - Bid Schedule for a Harris County procurement, focusing on Minority- and Woman-Owned Business Enterprise (M/WBE) participation requirements. It outlines a 33% M/WBE goal for the project and mandates bidders to submit a completed M/WBE Utilization Plan or demonstrate good faith efforts to meet the goal. The document details accepted M/WBE certifications, criteria for significant local presence, and requirements for trucking firms used to satisfy goal credit. It explains how participation by certified M/WBEs will be counted towards the contract goal, including self-performance, subcontracting, joint ventures, and expenditures for materials and supplies. The document emphasizes that only expenditures to M/WBEs performing a commercially useful function count towards the goal, with criteria for evaluating such functions. The document is critical for bidders to comply with M/WBE participation policies and submit required documentation with their bids.
PDF
PDF, High priority: read this firstbid-schedule
HighAI Summary for Attachment B - Bid Schedule - M/WBE Trucking Procedure Compliance: This document, titled 'Attachment B - Bid Schedule - Pricing Form,' outlines the M/WBE Trucking Procedure Compliance requirements for subcontracting in Harris County projects. It details the responsibilities and management criteria for M/WBE firms, including ownership and operation of trucks, exclusive use and control, and leasing rules. The document specifies the necessary submittal documentation such as W-9, insurance, and proof of truck ownership. It also provides guidance on the courtesy review process for utilization plans and references the M/WBE Program Policy website. The document is intended to ensure compliance with M/WBE participation goals and commercially useful function standards.
PDF
PDF, High priority: read this first1 page · bid-schedule
HighAI Summary for Attachment B Bid Schedule / Pricing Form: This document is Attachment B, the Bid Schedule / Pricing Form for a solicitation. It provides instructions for submitting pricing online through Bonfire and specifies that prices must be firm, all-inclusive, and written in ink or typed. It clarifies that unit pricing governs over extended pricing and that any additional charges must be disclosed or forfeited. The document also addresses maintenance costs for equipment, which must be provided by a manufacturer-authorized facility in Harris County if applicable, and states that maintenance service will commence after warranties expire. This form is critical for bidders to accurately price their proposals.
PDF
PDF, High priority: read this first9 pages · certification-utilization-plan
HighAI Summary for Attachment C - Certification Regarding Lobbying and M/WBE Utilization Plan: This document, titled 'Attachment C - Certification Regarding Lobbying,' includes a Minority- and Woman-Owned Business Enterprise (M/WBE) Utilization Commitment Form and Utilization Plan. It requires bidders to commit to M/WBE participation goals or document Good Faith Efforts if goals are unmet. The form collects bidder and subcontractor information, certification status, and participation percentages. It also includes instructions for compliance verification and documentation requirements. The document is intended to ensure adherence to M/WBE policies in contracting with Harris County and becomes part of the contract upon submission.
PDF
PDF, High priority: read this first4 pages · statement-of-bidder-qualifications
HighAI Summary for Attachment D Statement of Bidder Qualifications: This document, titled Attachment D Statement of Bidder Qualifications, is a form used to evaluate the responsibility of bidders for a solicitation. It requires bidders to provide detailed information about their company, including business type, years in operation, litigation history, experience with similar projects, subcontractor relationships, and equipment availability. The form also includes affidavits attesting to the accuracy of the information and proper licensure. It is intended to be submitted with the bid and is critical for assessing bidder qualifications and eligibility for contract award.
PDF
PDF, High priority: read this firststatement-of-bidder-qualifications
HighAI Summary for Attachment D Statement of Bidder Qualifications: This document is Attachment D, titled Statement of Bidder Qualifications, used in the evaluation of bidder responsibility for a solicitation. It requires bidders to provide detailed company information, litigation history, experience records, subcontractor details, equipment schedules, and affirmations of licensure and truthfulness. The form is to be completed fully and submitted with the bid. It includes sections on general company data, litigation and claims history, project experience, subcontractor relationships, and equipment availability. The document is dated and signed by the bidder's representative and notarized, ensuring the accuracy and completeness of the information provided.
PDF
PDF, High priority: read this firststatement-of-bidder-qualifications
HighAI Summary for Attachment D - Statement of Bidder Qualifications - Blue Bell Stormwater Detention Basin West Compartment Project Manual: This document is the Statement of Bidder Qualifications for the Blue Bell Stormwater Detention Basin West Compartment project under Harris County Flood Control District Project ID P518-12-00-E001. Prepared by Cobb, Fendley & Associates, Inc., it includes the project manual with contract conditions, specifications, bidding requirements, and environmental memorandums. The manual references standard specifications from Harris County Flood Control District and City of Houston, special provisions, contract-specific specifications, and outlines contractor responsibilities, insurance, indemnification, and regulatory requirements. It also details the use of Oracle's Primavera Unifier for project management and includes a general notice to bidders with compliance and procedural instructions.
PDF
PDF, High priority: read this first10 pages · statement-of-bidder-qualifications
HighAI Summary for Attachment D - Statement of Bidder Qualifications - M/WBE Trucking Compliance: This document outlines the requirements and procedures for M/WBE (Minority/Women Business Enterprise) trucking firms to comply with contract goals under the Department of Economic Equity and Opportunity. It details the responsibilities for ownership, operation, exclusive use, and subcontracting of trucks, emphasizing that M/WBE firms must perform at least 30% of the work with their own forces and manage the trucking operation. The document also specifies required submittal documentation such as W-9, insurance, and proof of truck ownership. Additionally, it provides guidelines for courtesy review requests and contact information for Harris County DEEO. The document serves as a compliance and qualification statement for bidders using M/WBE trucking services.
PDF
PDF, High priority: read this firstcertification-compliance
HighAI Summary for Attachment L - Certification of Compliance with Federal Standards & Requirements: Attachment L is a Certification of Compliance with Federal Standards & Requirements for bidders responding to an IFB. It outlines the bidder's agreement to comply with various federal regulations including access to records, accessibility laws, anti-lobbying, civil rights, environmental laws, labor standards, anti-kickback provisions, prohibition of cost-plus contracting, Davis Bacon Act, and debarment and suspension rules. The document requires bidders to certify understanding and compliance with these standards and to pass them through to subcontractors. It is a critical compliance document dated with the IFB response and includes detailed regulatory references.
PDF
PDF, High priority: read this firstcertification-compliance
HighAI Summary for Attachment L - Certification of Compliance with Federal Standards & Requirements: Attachment L is a Certification of Compliance with Federal Standards & Requirements for bidders responding to an IFB. It certifies that the bidder understands and complies with applicable federal standards including 2 CFR 200.326, Uniform Administrative Requirements, and other regulatory requirements. The document outlines specific compliance areas such as access to records, accessibility laws, anti-lobbying agreements, civil rights, environmental laws including the Clean Air Act and Federal Water Pollution Control Act, labor standards, anti-kickback provisions, prohibition of cost-plus contracting, Davis Bacon Act wage requirements, and debarment and suspension regulations. Bidders must initial each requirement and sign to affirm compliance. The certification ensures adherence to federal laws and regulations relevant to federally funded contracts.
PDF
PDF, High priority: read this firstcontract-document
HighAI Summary for Attachment N - Workers' Compensation Insurance Coverage Rule 110.110: This document, titled Attachment N, outlines the Workers' Compensation Insurance Coverage Rule 110.110 applicable to building or construction contracts in Texas. It details mandatory requirements for contractors to provide and maintain workers' compensation insurance coverage for all employees and subcontractors involved in the project for its duration. The document specifies definitions, certificate of coverage requirements, notification procedures, and contractor responsibilities including posting notices on project sites and contractual obligations with subcontractors. It also highlights penalties for non-compliance and the right of the governmental entity to void contracts if breaches are not remedied. The document was last revised in April 2002.
PDF
PDF, High priority: read this firstsow
HighAI Summary for Attachment N - Workers' Compensation Insurance Coverage Rule 110.110: This document, Attachment N, details the Workers' Compensation Insurance Coverage Rule 110.110 applicable to building or construction contracts. It outlines mandatory requirements for contractors to provide and maintain workers' compensation insurance coverage for all employees and subcontractors involved in the project for its duration. The document defines key terms, specifies certificate of coverage requirements, reporting obligations, and the contractor's responsibilities to ensure compliance with Texas Labor Code Section 401.011(44). It also includes provisions for notification of coverage changes, posting notices at project sites, and consequences of non-compliance. The document was last revised in April 2002.
PDF
PDF, High priority: read this firstcontract-document
HighAI Summary for Attachment P Required Contract Provisions for Harris County Federal Contracts: This document, titled Attachment P Required Contract Provisions, outlines mandatory federal contract provisions for Prime Contractors awarded federally funded contracts by Harris County. It includes compliance requirements with 2 CFR Part 200 Uniform Requirements, access to records and record retention policies, accessibility laws including Section 504 and the Americans with Disabilities Act, the Byrd Anti-Lobbying Agreement, Civil Rights Act of 1964 Title VI, and environmental compliance under the Clean Air Act and Clean Water Act. The provisions apply to contractors and subcontractors and mandate record retention for seven years, non-discrimination, and anti-lobbying certifications. The document is essential for ensuring federal compliance in contracts involving Harris County and its subcontractors.
PDF
PDF, High priority: read this firstcontract-provisions
HighAI Summary for Attachment P Required Contract Provisions for Harris County Federal Contracts: This document, titled Attachment P, outlines the required contract provisions for Harris County contracts funded federally, either wholly or partially. It mandates compliance with federal, state, and local laws, including access to records, accessibility standards, anti-lobbying agreements, civil rights protections, and environmental regulations such as the Clean Air Act. The provisions ensure contractors and subcontractors adhere to these requirements, maintain records for seven years, and prohibit discrimination and lobbying with federal funds. The document is essential for contractors to understand their obligations under federally funded Harris County contracts.
PDF
PDF, High priority: read this first2 pages · certification
HighAI Summary for Certification Regarding Lobbying for Federal Contracts: This document is a Certification Regarding Lobbying to be submitted with each bid exceeding $100,000. It certifies that no federal appropriated funds have been used to influence federal officials in connection with federal contracts, grants, loans, or cooperative agreements. It requires disclosure of any lobbying activities using Standard Form-LLL. The certification must be included in all subawards and subcontracts. The document includes instructions and a form for reporting lobbying activities as mandated by 31 U.S.C. § 1352, with penalties for non-compliance. It is a material representation of fact required for federal transactions.
PDF
PDF, High priority: read this firstwage-determination
HighAI Summary for Harris County Contractor Minimum Wage Policy FAQ: This document is the Harris County Contractor Minimum Wage Policy FAQ, outlining the minimum wage policy effective for contracts solicited after October 1, 2025. It establishes a minimum wage of $21.65 per hour, adjusted annually based on the MIT Living Wage Calculator. The policy applies to all contractors and subcontractors on applicable projects, including part-time workers, with certain exemptions listed. It details compliance requirements, reporting procedures for violations, and the relationship between this policy and prevailing or Davis-Bacon wages. The document also clarifies that federally funded contracts must comply with this policy and provides a decision flow for wage application. The FAQ aims to inform contractors about wage obligations, enforcement, and updates.
PDF
PDF, High priority: read this firstsafety-policy
HighAI Summary for Harris County Contractor Safety Record Policy - Construction Projects: This document is the Harris County Safety Policies for Construction Projects, approved on November 13, 2025, and effective February 1, 2026. It outlines the Contractor Safety Record Policy applicable to prime contractors and subcontractors engaged in construction-related contracts valued at $500,000 or more. The policy aims to ensure contractors prioritize worker health and safety, reduce workplace injuries, and improve project quality. It includes certification requirements, definitions, scope, applicability, enforcement, and exemptions. The policy references Texas Government Code and Local Government Code provisions and mandates safety record questionnaires as part of contract evaluations.
PDF
PDF, High priority: read this firstproject-manual
HighAI Summary for Harris County Flood Control District Project Manual P518-12-00-E001: This project manual for the Harris County Flood Control District Project ID P518-12-00-E001, dated 2026, covers contract conditions, specifications, bidding requirements, environmental memorandums, and plans for the Blue Bell Stormwater Detention Basin West Compartment. It includes general and special provisions, standard specifications from Harris County and City of Houston, and detailed contract conditions such as indemnification, insurance, labor, and materials. The manual also outlines administrative procedures including the use of Oracle's Primavera Unifier for project management and requirements for subcontractor listings and authorized representatives. This comprehensive document serves as the primary guide for contractors bidding and performing work on this public works project.
PDF
PDF, High priority: read this firstifb
HighAI Summary for Harris County IFB for Blue Bell Stormwater Detention Basin Construction: This Invitation for Bids (IFB) document from Harris County outlines the procurement for the construction of the Blue Bell Stormwater Detention Basin for the Harris County Flood Control District (Project ID P518-12-00-E001). It includes general requirements, specifications, and a detailed table of contents with attachments covering bid schedules, certifications, bonds, insurance, wage determinations, and safety policies. The IFB specifies a project schedule of 126 calendar days and mandates compliance with federal, state, and local regulations, including federal grant requirements under 2 CFR 200. A pre-bid conference is scheduled with instructions for participation, and bidders are responsible for understanding all project conditions and submitting questions in writing. The document emphasizes adherence to affirmative action and equal opportunity policies and encourages participation from minority and small business enterprises.
PDF
PDF, High priority: read this firstinsurance-requirements
HighAI Summary for Harris County Minimum Insurance Requirements Attachment: This document outlines the minimum insurance requirements for contractors working with Harris County. It specifies the types and limits of insurance coverage required, including Workers' Compensation and Employer's Liability, Commercial General Liability, Business Automobile Liability, and Contractor's Pollution Liability. The document details coverage limits, required endorsements, additional insured status, waiver of subrogation rights, and prohibited exclusions. It ensures contractors maintain adequate insurance to protect the county and comply with statutory and contractual obligations. The document is critical for contract compliance and risk management.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Harris County Minimum Insurance Requirements Attachment: This document outlines the minimum insurance requirements for contractors working with Harris County. It specifies the types and limits of insurance coverage required, including Workers' Compensation and Employer's Liability, Commercial General Liability, Business Automobile Liability, and Contractor's Pollution Liability. The document details coverage conditions, endorsements, and exclusions to ensure compliance and protection for the County. It serves as a critical specification attachment to a contract or bid schedule, dated as per the original filename context.
PDF
PDF, High priority: read this firstpolicy
HighAI Summary for Harris County MWBE Trucking Procedure Compliance Packet - Minimum Wage Policy: This document outlines the Harris County Contractor Minimum Wage Policy adopted by the Harris County Commissioners Court on June 4, 2024. It establishes a minimum wage of $21.65 per hour for workers on eligible County contracts, adjusted annually using the MIT Living Wage Calculator. The policy applies to contractors and subcontractors working on County projects starting July 1, 2025, with specific exemptions listed. It aims to improve work quality, safety, and productivity by ensuring fair wages. The Harris County Purchasing Department administers compliance and wage adjustments annually.
PDF
PDF, High priority: read this firstwage-determination
HighAI Summary for Harris County Prevailing Wage Rate Instructions and Wage Determination: This document provides instructions for payroll submittal and prevailing wage rate compliance for contractors working on Harris County flood control projects in Texas. It includes requirements for certified payroll submissions, wage rate postings, license verification, and penalties for wage violations under Texas Government Code Chapter 2258. The document also contains a detailed wage determination table for various construction trades and equipment operators, with rates updated as of May 18, 2026. Contractors must comply with these wage rates and Harris County's Minimum Wage Policy.
PDF
PDF, High priority: read this firstsafety-record-questionnaire
HighAI Summary for Harris County Safety Record Questionnaire for Prime Contractors: This document is the Safety Record Questionnaire for Prime Contractors required by Harris County for construction and related projects with a contract value of at least $500,000. It includes six certifications related to OSHA violations, criminal offenses, and OSHA training requirements. The prime contractor must certify the truthfulness of the responses and ensure subcontractors complete a similar questionnaire. The document outlines the consequences of false statements and the obligation to maintain subcontractor certifications throughout the project. It serves as a critical compliance and safety record submission for bidding on county projects.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for HCFCD Project P518-12-00-E001 General Notes and Plans: This document contains general notes and a detailed sheet list for the Harris County Flood Control District (HCFCD) Project ID# P518-12-00-E001, Blue Bell Stormwater Detention Basin West Compartment. It includes instructions on site preparation, environmental mitigation, construction adjustments, and best management practices. The sheet list covers various plans such as demolition, grading, environmental measures, traffic control, and survey data. The document is essential for understanding project requirements, construction guidelines, and environmental considerations.
PDF
PDF, Low priorityother
LowAI Summary for Attachment A - Bid Addenda Acknowledgement: This document titled 'Attachment A - Bid Addenda Acknowledgement' appears to be a form or attachment related to a procurement process. It includes sections labeled 'Attachment F REFERENCES' listing multiple references with fields for organization name, contact information, address, and services provided. The document content is largely blank or incomplete, with placeholders for reference details but no substantive information filled in. It does not contain solicitation details, specifications, or instructions.
PDF
PDF, Low priority1 page · self-certification-form
LowAI Summary for Attachment EE - Build America Buy America Act Self-Certification Form: This document is Attachment EE, a Build America, Buy America Act (BABAA) Self-Certification Form. It certifies compliance with BABAA requirements for infrastructure projects funded by federal assistance, ensuring that all iron, steel, manufactured products, and construction materials used are produced in the United States. The form outlines specific criteria for domestic production and requires the signature of the contractor or subcontractor's authorized official to affirm the truthfulness and accuracy of the certification.
PDF
PDF, Low prioritysafety-requirement
LowAI Summary for Attachment FF Heat Protection Safety Requirement: This document, titled Attachment FF Heat Protection Safety Requirement, provides guidance for worker safety related to extreme weather conditions, specifically heat and cold. It mandates inclusion of weather-related safety measures in the project Safety Plan, including provisions for heat-related and cold-related illness prevention. It requires the Prime Contractor to provide accommodations during adverse weather, such as a Heat Awareness Plan when temperatures exceed 90 degrees, with provisions for acclimatization, water, rest, and shade. Vendors agree to comply by signing the Bid Acknowledgement.
PDF
PDF, Low priorityspecial-notice
LowAI Summary for Attachment FF Heat Protection Safety Requirement: This document outlines the heat protection safety requirements for workers on a project. It mandates the inclusion of weather-related safety guidance in the project Safety Plan, specifically addressing extreme heat, cold weather, and adverse conditions. Key provisions include a Heat Awareness Plan for temperatures over 90 degrees, with measures for acclimatization, water, rest, and shade. The Prime Contractor must provide necessary accommodations during extended adverse weather. Vendors agree to comply by signing the Bid Acknowledgement at submission.
PDF
PDF, Low priorityother
LowAI Summary for Attachment F References: This document, titled Attachment F References, appears to be a form or template for listing references related to a contract or procurement. It includes fields for organization name, contact information, address, and services provided. The document is likely used to provide references for past performance or related information but does not contain solicitation or contract details itself.
PDF
PDF, Low priority2 pages · other
LowAI Summary for Attachment F References Form: This document is titled Attachment F References and appears to be a form for listing references related to a procurement or contract. It includes fields for organization name, contact information, address, and services provided. The document contains multiple reference entries but no specific data is filled in. It serves as a supporting document for providing references in a procurement context.
PDF
PDF, Low prioritycontractor-profile
LowAI Summary for Attachment G Contractor Profile Form: This document is Attachment G, a Contractor Profile form to be submitted within fifteen working days after notification as the apparent low bidder. It collects contractor and subcontractor information including project name, tax IDs, UEI numbers, trade category, contract type, principal owner, contact details, estimated contract amount, and ownership status (women or minority owned). The form requires the contractor's signature and date.
PDF
PDF, Low prioritycontractor-profile
LowAI Summary for Attachment G Contractor Profile Form: This document is Attachment G, a Contractor Profile form to be submitted within fifteen working days after notification as the apparent low bidder. It collects contractor and subcontractor information including project name and number, federal tax ID, UEI number, category of trade, contract type, principal owner and contact details, company address, phone, email, estimated contract amount, and ownership status (women or minority owned). The form requires the contractor's signature and date.
PDF
PDF, Low priorityother
LowAI Summary for Attachment HH - Safety Record Questionnaire: This document titled 'Attachment HH - Safety Record Questionnaire' appears to be related to a project identified as HCFCD PROJECT ID# P518-12-00-E001 for the Blue Bell Stormwater Detention Basin West Compartment. It includes a sheet list table detailing various engineering and construction plans and notes, such as general notes, project legends, review sheets, layout, survey control, demolition plans, environmental mitigation measures, traffic control plans, and soil borings. The content also contains general notes related to construction practices, site preparation, environmental considerations, and project specifications. The document does not appear to be a primary solicitation or contract document but rather a supporting or informational document related to project planning and safety records.
PDF
PDF, Low prioritypayment-bond
LowAI Summary for Attachment K Payment Bond for Harris County Contract: This document is a Payment Bond related to a contract with Harris County, Texas. It is executed pursuant to Texas Government Code 2253.001, et seq., ensuring the principal will pay all claimants supplying labor and materials for the contract work. The bond binds the principal and surety jointly and severally to the full sum stated. It includes spaces for details such as bond number, principal and surety information, contract date, job description, and signatures. The bond is accepted and approved on behalf of Harris County.
PDF
PDF, Low prioritypayment-bond
LowAI Summary for Attachment K Payment Bond for Harris County Contract: This document is a Payment Bond related to a contract with Harris County, Texas. It is executed pursuant to Texas Government Code 2253.001, et seq., ensuring payment to claimants supplying labor and materials for the contract work. The bond binds the Principal and Surety to pay all claimants, with liabilities governed by the referenced Texas statute. The document includes spaces for contract details, parties' information, signatures, and approval by Harris County.
PDF
PDF, Low priorityother
LowAI Summary for Bid Check Return Authorization Form - Harris County: This document is the Bid Check Return Authorization Form for Harris County. It provides instructions for submitting a cashier's check in lieu of a bid bond through Bonfire, including physical drop-off details and requirements for the bid check. The form includes sections for bid bond and cashier's check information, business and mailing addresses, and contact details. It also outlines conditions under which the County Clerk may retain or return bid checks and authorizes Harris County to return bid checks via regular mail under specified circumstances. The form is intended for use by bidders and the County Clerk or Purchasing Agent.
PDF
PDF, Low priorityself-certification-form
LowAI Summary for Build America Buy America Act Self-Certification Form: This document is the Build America, Buy America Act (BABAA) Self-Certification Form related to a specific project. It certifies compliance with BABAA requirements that all iron, steel, manufactured products, and construction materials used in the project are produced in the United States. The form outlines the criteria for domestic production, including the percentage of U.S.-produced components in manufactured products. It includes a certification statement for contractors or subcontractors affirming the truthfulness and accuracy of the information, with acknowledgment of legal consequences for false claims. The document requires the signature and title of the authorized official.
PDF
PDF, Low priorityperformance-bond
LowAI Summary for Performance Bond for Public Works Contracts Over $100,000 - Harris County TX: This document is a Performance Bond for Public Works Contracts exceeding $100,000 pursuant to Texas Government Code 2253.001 et seq. It binds the Principal and Surety to the County of Harris, Texas, guaranteeing compliance with contract terms and indemnifying the County against losses due to the Principal's failure to perform. The bond allows the Surety to assume control of the contract if the Principal defaults, with specific provisions for notice and forfeiture. The bond is executed under Texas law and includes spaces for signatures, dates, and approval by the Commissioner's Court.
Get AI-powered intelligence on the opportunities still open
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.