Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Sources Sought opportunity from Department Of Veterans Affairs was posted on October 22, 2019. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

J--598-20-1-8317-0010 NEW O2 MONITOR BOILER TRIM SYSTEM (VA-20-00002247)

Closed
36C25620Q0052Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 811310
New
Kubota M8200 Clutch Replacement
Solicitation # kubota-m8200-clutch-replacement
Management and Training Corporation is soliciting lump sum fee proposals for the clutch replacement of a Kubota M8200 tractor with front wheel assist, located at the Earle C. Clements Job Corps Center in Morganfield, Kentucky. The scope of work requires a qualified contractor to provide all transportation, labor, materials, and equipment to diagnose and repair the clutch assembly and power take-off system. Key technical requirements include replacing friction discs, bearings, oil seals, and O-rings, resurfacing the flywheel, and replacing hydraulic pipes and filters as needed. The contractor must perform all work according to manufacturer specifications and provide a final summary of diagnostic findings, an itemized list of replaced parts, and warranty documentation upon completion. This solicitation is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified entities. Bids must be submitted via email to Angie Mahoney by 3:00 PM CST on November 3, 2026, and must include a bid sheet, proof of insurance, a completed supplier packet with a W-9, and applicable SBA certification letters. Award decisions will be based on best value, with a focus on administrative compliance and technical qualifications. The contract is subject to various Federal Acquisition Regulations, including standards for combating trafficking in persons, Buy American restrictions, and Service Contract Labor Standards per Wage Determination 2015-4687 Revision 31 for Kentucky.
Earle C. Clements Job Corps Center

POSTED

about 3 hours ago

DEADLINE

in 5 days
NAICS: 811310
New
SLED
RFP 07-135 Roseville Electric Utility – Air Compressor Maintenance
Solicitation # 07-135
The City of Roseville is soliciting proposals under RFP 07-135 for a consultant to provide comprehensive scheduled preventive and corrective maintenance for air compressors and auxiliary systems, including Ingersoll Rand equipment. The services will be performed at the Roseville Energy Park and Sunset Energy Center in California. The selected consultant will be responsible for providing all necessary labor, technical expertise, specialized tooling, and materials. This is a prevailing wage project with an initial contract duration of five years, estimated to commence in April or May. Proposals must be submitted by December 16, 2026, via email to the City Clerk or through physical delivery in a sealed container with the required Attachment H label. The award will be based on a formal evaluation panel process considering the firm's experience and qualifications (25 points), the proposed project plan (35 points), and cost (40 points), with potential interviews for top candidates. Requirements for the successful bidder include obtaining a City of Roseville business license, providing 100% faithful performance and labor and materials bonds, and maintaining specific insurance policies. Consultants must also disclose any conflicts of interest and adhere to the Levine Act regarding political contributions.
City of Roseville

POSTED

about 9 hours ago

DEADLINE

in about 2 months
NAICS: 811310
New
SLED
Roseville Electric Utility – Gas Compressor Maintenance
Solicitation # 07-137
The City of Roseville is soliciting proposals for Gas Compressor Maintenance Services to support the Roseville Energy Park and the Roseville Energy Center and RPEAK. The selected contractor will provide all labor, supervision, technical expertise, specialized tooling, equipment, and materials necessary for both scheduled preventive and corrective maintenance on natural gas compressors, specifically Gas Packagers and Ariel models, and their associated auxiliary systems. The contract is intended to run for an initial term of five years, with services estimated to commence in April or May. This is a prevailing wage project requiring adherence to all fair employment laws, with certified payroll required for contracts exceeding 25,000 dollars. The successful proposer must provide a 100 percent Faithful Performance Bond and a 100 percent Labor and Materials Bond. Proposals are due by December 17, 2026, and must include a Proposer’s Certification, a Non-collusion Declaration, a Levine Act Disclosure Statement, and proof of active registration with the California Secretary of State. Award will be made to the responsible proposer determined to be the most advantageous to the City through a formal evaluation panel process. Invoicing is to be submitted monthly, delineated by task and personnel, with payment terms set at 30 days following receipt of satisfactory services.
City of Roseville

POSTED

about 9 hours ago

DEADLINE

in about 2 months

AI Contract Overview

Show more

This is a Request for Information issued by the Department of Veterans Affairs for market research purposes to identify qualified business sources for a service contract at the Central Arkansas Veteran Healthcare System NLR campus. The project requires the removal of an existing O2 monitor and trim system on the number two boiler and the installation, commissioning, and restoration of a new system, including all necessary peripheral devices and controls. The contractor is responsible for providing all qualified personnel, materials, equipment, and rigging, ensuring all work complies with ASHRAE, VA infectious control guidelines, and applicable federal, state, and local codes. Key requirements include the ability to perform work after normal business hours or on weekends to avoid impeding plant productivity and the responsibility to restore any relocated utilities or breached fire walls to original condition. Interested vendors must provide a specific timeline for services, disclose any pending or resolved tort claims, and provide a one-year warranty on all parts and labor. Responses were due via email to the designated point of contact by October 28, 2019. This notice does not constitute a solicitation or a commitment by the government to award a contract.

General Info

VA RFI for replacing O2 monitor and trim system at Arkansas NLR campus.

NAICS

811310 - Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance

Place of Performance

Department of Veterans Affairs;Central Arkansas Veterans Healthcare System;(CAVHS);2200 Fort Roots Dr.;North Little Rock, Arkan, MS

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Sources Sought

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Veterans Affairs → 256-NETWORK Contract Office 16 (36C256)
ContactsNo contacts available
OfficeRIDGELAND, MS, 39157, USA
Office AddressRIDGELAND, MS, 39157, USA
ContactsNo contact information available

Full Description

Show more
THIS IS A REQUEST FOR INFORMATION (RFI) ONLY (as defined in FAR 15.201(e)), this is not a solicitation. Solicitations are not available at this time. Requests for a solicitation will not receive a response. Respondents are advised that the Government is under no obligation to acknowledge receipt of the information received, provide feedback to respondents with respect to any information submitted, or respond to any questions or comments that may be submitted in response to this RFI. This notice does not constitute a commitment by the United States Government and does not obligate the Government to award a contract or otherwise pay for the information provided in response. Responders are solely responsible for all expenses associated with responding to this RFI. The Department of Veteran Affairs, Medical Center, Little Rock, Arkansas, has a requirement to remove existing O2 monitor & trim system on the #2 boiler and install new equipment. This is a Service Contract. The Request for Information (RFI) is issued for market research purposes only to determine the availability of qualified business sources capable of providing the full range of services described below. Interested vendors parties responding to this RFI shall provide response via email to contact@example.gov, no later than 15:00pm central time on October 28, 2019. STATEMENT OF WORK Section I A: SCOPE OF WORK: The contractor shall furnish all qualified personnel, materials, equipment and services necessary to remove existing O2 monitor & trim system on #2 boiler and install new equipment, all peripheral devices and controls and interface with newly installed Equipment. The contractor shall commission the equipment and controllers and restore to full operation upon completion of installation. The Boiler is located at the Central Arkansas Veteran Healthcare System NLR campus. B: PERSONNEL: Contractor shall provide all personnel to perform the repair and restoration of a O2 monitor and trim system on #2 boiler. The contractor employees shall be fully trained, qualified and licensed (if applicable) to perform such tasks on these systems. SECTION II GOVERNMENT FURNISHED PROPERTY AND SERVICES A: N/A SECTION III CONTRACTOR-FURNISHED EQUIPMENT AND SUPPLIES The contractor shall furnish all equipment including, materials, supplies, rigging and infectious control precautions necessary remove existing O2 monitor and trim system on #2 boiler and install and commission new O2 monitor and trim system to meet and/or exceed the criteria established in Section IV entitled Performance Requirements . SECTION IV PERFORMANCE REQUIREMENTS A: The service provided by the contractor shall meet all criteria in ASRAE, VA infectious control guidelines, regulations, codes and all other applicable federal, state and local codes. Any alterations to the equipment must be repaired and/or restored to working conditions prior to the onset of the service conditions. All repairs will be made by qualified and licensed personnel. Contractor will schedule all services and work with the Boiler Plant supervisor to ensure the services productivity is not impeded. This may require contractor to provide some or all services be performed after normal duty hours and/or weekends. All utilities or utility distribution elements that need to be removed and/or relocated to gain access to equipment i.e. lights, sprinkler heads and/or lines, water, electrical panels or conduits etc. must be relocated and restored to working condition. The contractor is responsible to furnish all materials and labor shall be coordinated and done with consultation of CAVHS Engineering Department prior to the work. The contractor will be responsible to seal any penetrations made through walls, floors and/or ceilings and roof. If a fire wall is breached the contractor will make all repairs in accordance to NFPA 221. 12.3. The contractor will be responsible to make necessary provisions to ensure dust and debris do not enter the occupied area. The area should be returned to original conditions. Additional requirements included are as follows: Disclosure of all Tort claims against vendor either pending or resolved. Specific time line for services to be provided along with proposal. VA should not do any preparation work B. MANUALS: The contractor shall provide two copies of the nature of completed work along with pictures of interior equipment structures C: WARRANTY: The contractor shall provide a one-year warranty on all parts and labor for any modifications on equipment to gain access to perform the service requested herein. Warranty shall include all travel and shipping costs associated with any warranty repair. SECTION V If temporary relocations are necessary to any utilities and controls and all work provided under this solicitation will be restored to operating condition and shall meet all national electrical codes, National Fire Association codes and all other applicable federal, state and local codes.

More opportunities from Department Of Veterans Affairs → 256-NETWORK Contract Office 16 (36C256)

Same awarding agency

NAICS: 238290
New
Federal
N099--JLM Roll Up Door Replacement
Solicitation # 36C25627Q0092
Solicitation 36C25627Q0092 is a combined synopsis and request for quote issued by the Department of Veterans Affairs for the replacement of a motorized roll-up door at the John L. McClellan Veterans Hospital. This is a 100% set-aside for certified Service-Disabled Veteran-Owned Small Businesses (SDVOSB) under NAICS code 238290. The project requires the contractor to provide all labor, tools, and equipment, including a scissor lift and forklift, to remove and dispose of the existing door and install one grey 7 by 9 foot motorized rolling steel rapid slat door with insulated slats and an obstruction safety device. The award will be a firm-fixed-price contract with a performance period of 30 days from the Notice to Proceed and includes a one-year warranty. The government will utilize the Lowest Price Technically Acceptable (LPTA) evaluation process, focusing on technical capability, price reasonableness, and the completion of the VA Notice of Limitations on Subcontracting. Interested offerors must submit a three-volume quote package consisting of technical capabilities, a completed price schedule, and the required VAAR certification. Quotes must be emailed to Joseph Warren by 3:00 PM CST on November 18, 2026. A site visit is scheduled for November 6, 2026, at 10:00 AM, and all inquiries must be submitted by November 10, 2026. Performance will take place at the Central Arkansas Veterans Healthcare System in North Little Rock, Arkansas, and contractors must comply with all OSHA, ANSI, CAN, and UL standards.
Other Building Equipment Contractors

POSTED

about 13 hours ago

DEADLINE

in 20 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS