Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Sources Sought opportunity from Department Of Veterans Affairs was posted on January 2, 2020. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

J--Boiler Services VA Medical Centers New England

Closed
36C24120Q0139Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238220
New
WOJC - Multi-Building Plumbing Leak Repair Project
Solicitation # WOJC – Multi-Building Plumbing Leak Repair Project
Education and Training Resources is seeking quotes for a subcontracting opportunity to perform multi-building plumbing leak repairs at the Westover Job Corps Center in Chicopee, Massachusetts. The scope of work includes replacing leaking shower P-trap drain pipes in Harris Hall dormitory rooms 123 and 213, repairing a cracked drain pipe in the pipe chase of room 216, and replacing heat pipe sections in the Administration Building and King Hall. All work must comply with the Massachusetts State Plumbing Code, International Plumbing Code, OSHA regulations, and NFPA Standard No. 101. Contractors are responsible for all cutting, patching, and debris removal, and must provide a signed punch list and applicable warranties to close the project and receive payment. Interested bidders must submit a detailed quote by October 30, 2026, including a comprehensive cost breakdown of labor and materials, a proposed service schedule, and a quote validity period of at least 60 days. Required administrative documentation includes a SAM.gov UEI number, active registration, W-9, business licenses, Massachusetts professional credentials, and certificates of insurance. Award selection is not based solely on the lowest price; ETR will evaluate cost, qualifications, and administrative compliance. The contract is subject to various federal regulations, including the Davis-Bacon Act, the Service Contract Act, and FAR clauses regarding debarment and system for award management. Depending on the final project value, payment and performance bonds may be required for amounts exceeding 35,000 dollars.
Westover Job Corps Center

POSTED

about 7 hours ago

DEADLINE

in 8 days
NAICS: 238220
New
MI 2026-14 Emergency Heating and Air Conditioning Services
Solicitation # MI 2026-14
Adams and Associates, Inc., contracting for the U.S. Department of Labor, is soliciting bids for emergency heating and air conditioning (HVAC) services at the Miami Job Corps Center in Miami, Florida. The period of performance runs from November 1, 2026, to October 31, 2027. This solicitation is set aside for small businesses, including certified Veteran, Service-Disabled Veteran, Women-Owned, and HUBZone small businesses. The selected vendor will be responsible for emergency HVAC repairs, with a requirement to provide separate hourly rates for non-emergency daytime services and emergency or weekend services. Eligible bidders must possess a valid Unique Entity ID (UEI) and maintain active registration in SAM.gov. Required submission documents include a written bid on company letterhead valid for 90 days, a vendor questionnaire, W9, Authority to Commit, a list of references, and all necessary business and employee licenses for the State of Florida. Vendors must also provide proof of Workers Compensation, Automobile Liability, and Comprehensive General Liability insurance of at least $1,000,000 per occurrence, naming Adams and Associates, Inc. as an additional insured. The contract is subject to the Service Contract Act and Davis-Bacon Act, specifically Wage Determination No. 2005-2248, with a minimum wage of $13.65 per hour for covered workers through December 31, 2026. Payroll and time cards must be submitted for any service incident exceeding $2,500. Award decisions will be based on the most responsible bidder, considering cost, licensure, and experience. Payment terms are NET 30 days from the date of invoice. All bids must be submitted to the Purchasing Department by October 23, 2026.
Miami Job Corps Center

POSTED

about 7 hours ago

DEADLINE

in 1 day
NAICS: 238220
New
CBP6585 Bldg. 22 HVAC Replacement
Solicitation # CBP6585
Management & Training Corporation (MTC) is seeking bids for a fixed-price, single lump sum subcontract to replace the HVAC equipment serving Building 22 at the San Diego Job Corps Center in Imperial Beach, California. The scope of work includes the removal of existing equipment and the installation of a new 5-ton condenser with a suitable pad, a new furnace, a 5-ton evaporator coil, a fused electrical disconnect, an electrical whip, and a new condensate drain line. The contractor is responsible for providing all labor, materials, and supervision, ensuring the system is fully operational and compliant with applicable codes. Key deliverables include two sets of operation and maintenance manuals and manufacturer and installer warranties. The estimated price range for this project is between 0 and 25,000 dollars. Bids are due by October 28, 2026, and must be submitted using the MTC Bid for Lump Sum Contract form, accompanied by a detailed cost breakout, proof of insurance, and three references. A physical site visit and signature on the attendance roster are mandatory prerequisites for bid submission. For bids equal to or greater than 25,000 dollars, a bid bond of 20 percent of the base bid is required, and the awarded contractor must provide performance and payment bonds for 100 percent of the contract price from a surety with at least an A- rating. This opportunity is set aside for small businesses under NAICS 238220. Award decisions will be based on overall best value. Compliance requirements include the Davis-Bacon Act for prevailing wages, OSHA safety standards for personal protective equipment, and various Federal Acquisition Regulations, including those regarding first-tier subcontractor information and the submission of form SF 1413. Awarded contractors must provide a Unique Entity ID (UEI) number and complete the MTC Supplier Self-Certification packet. Payment will be made via progress payments based on percentage completion, utilizing AIA Document G702 and G703 or equivalent forms.
San Diego Job Corps Center

POSTED

about 7 hours ago

DEADLINE

in 7 days
NAICS: 238220
New
MJCC EXHAUST FANS BLD. 1429
Solicitation # mjcc-exhaust-fans-bld-1429
The Muhlenberg Job Corps Center, operated by Insights Training Group LLC, is soliciting fixed-price quotes from qualified HVAC and mechanical contractors to restore the exhaust fan and louver systems in Building 1429, located in Kentucky. The project scope involves comprehensive inspections and repairs for multiple units, including replacing motors and selector switches for fans 2 and 4, relocating a thermostat for fan 3, installing missing components for fan 5, verifying the operation of fan 6, and replacing a louver actuator for fan 7. Additionally, the contractor must perform system-wide replacements of aged thermostats, relays, and louver actuators while ensuring all work complies with applicable building codes, manufacturer requirements, and OSHA and EPA regulations. This solicitation is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified entities. Award will be granted to a single responsible offeror based on technical acceptability and the lowest price. The period of performance is 45 days from the date of award. Contractors must be registered in the State of Kentucky, provide proof of insurance, and demonstrate the ability to secure performance and payment bonding. Compliance with the Davis-Bacon Act is mandatory, requiring the submission of weekly certified payroll with every invoice. Quotes must be submitted electronically to mjccpurchasing@insightsllc.net by October 30, 2026, at 5:00 PM.
Muhlenberg Job Corps Center / Insights Training Group LLC

POSTED

about 7 hours ago

DEADLINE

in 8 days
NAICS: 238220
New
Furnace Replacement
Solicitation # 26-17
Management & Training Corporation (MTC), operator of the Tongue Point Job Corps Center in Astoria, Oregon, is soliciting bids for a fixed-price, lump sum contract to replace furnaces and thermostats in three staff houses. The project involves Quarters F (3,786 sq/ft, propane), Quarters P (1,100 sq/ft, natural gas), and Quarters Q (2,280 sq/ft, propane). Required equipment must be Carrier Comfort Series or an equivalent household good grade with at least a 96% efficiency rating, sized at approximately 80,000btu. Installations must include new transitions to existing ducting, gas regulators, electrical and condensate pump kits, and intake/exhaust venting. A lifetime warranty on the heat exchanger and a minimum 10-year warranty on parts are mandatory. The estimated price range for this solicitation is between $0 and $25,000, with bids due by October 21, 2026. This is a small business set-aside opportunity under NAICS code 238220. Award decisions will be based on overall best value. Contractors must comply with the Davis-Bacon Act and applicable prevailing wage determinations, providing certified payroll weekly. Bid and performance bonds are only required for bids equal to or exceeding $25,000. Submission requirements include a signed MTC bid form, a detailed cost breakout on company letterhead, a Unique Entity Identification number, and a completed supplier self-certification packet. Final acceptance is contingent upon functional testing, the submission of operation and maintenance manuals, and a final inspection.
Tongue Point Job Corps

POSTED

about 7 hours ago

DEADLINE

in about 8 hours
NAICS: 238220
New
Centennial Dry Sprinkler System & Compressor Replacement Services
Solicitation # centennial-dry-sprinkler-system-compressor-replacement-services
Management & Training Corporation (MTC) is soliciting bids for a fixed-price, single lump sum contract to provide dry-type sprinkler system and compressor replacement services at the Centennial Job Corps Center in Nampa, Idaho. The project focuses on eliminating severe piping leaks and replacing failing infrastructure in Building CM (Men's Dormitory), Building CW (Women's Dormitory), and Building D (Recreation). A licensed fire sprinkler contractor is required to demolish the existing distribution piping network and compressors, install a new code-approved piping network and properly sized air compressor, and perform rigorous operational and leak testing in accordance with NFPA 25 standards. The work must be completed within 30 consecutive business days following a written Notice to Proceed. Bids are due by December 1, 2026, and must include a detailed cost breakout and proof of insurance. A physical site visit and signature on the attendance roster are mandatory prerequisites for bid submission. For bids totaling $25,000 or more, a bid bond guarantee of 20% of the base bid is required, and the awarded contractor must provide performance and payment bonds from an A-rated surety. Award decisions will be based on overall best value and bidder responsiveness. The contract is subject to various federal regulations, including the Davis-Bacon Act, requiring compliance with prevailing wage rates for building construction in Idaho. Contractors must adhere to FAR clauses regarding small business utilization, whistleblower rights, and security requirements. Additionally, first-tier subcontractors with awards exceeding $45,000 must disclose debarment status per FAR 52.209-6, and contracts valued at $40,000 or more are subject to FFATA reporting. Final payment is contingent upon a successful substantial completion inspection and the submission of weekly certified payroll reports.
Management & Training Corporation/Centennial Job Corps Center

POSTED

about 7 hours ago

DEADLINE

in about 1 month
NAICS: 238220
New
Dorm Hot Water Tank Replacement – Glenmont Job Corps Center – S26-006
Solicitation # S26-006
Adams and Associates, Inc. is seeking qualified mechanical and plumbing contractors for solicitation S26-006 to replace domestic hot water storage tanks and associated equipment at the Glenmont Job Corps Center in Glenmont, New York. The scope of work involves the removal and disposal of four existing 505-gallon tanks and the installation of four new 500-gallon insulated storage tanks, four new heat exchangers, and one bronze Bell and Gossett circulator pump in the North Dormitory. Additional requirements include piping modifications using ProPress materials, electrical work, insulation, rigging, and the provision of a temporary hot water heater to ensure the facility remains operational during the estimated construction period of two and a half to three weeks. This is a subcontracting opportunity rather than a direct federal procurement, though it requires compliance with Davis-Bacon prevailing wage requirements and New York State statutory insurance and licensing standards. Proposals are due by November 9, 2026, at 4:00 PM ET, following a site walkthrough on October 29, 2026. Award selection is based on a weighted evaluation of price (60 points), quality (20 points), past performance (10 points), and schedule (10 points), with the lowest price not guaranteeing an award. Required submission documents include company qualifications, business references, New York State licenses, certificates of insurance, a completed vendor questionnaire with UEI and NAICS code, and a current W-9. Payment terms are set at Net 30 days upon completion and receipt of invoice.
Adams and Associates, Inc.

POSTED

about 7 hours ago

DEADLINE

in 19 days
NAICS: 238220
New
MJCC HVAC BLD. 1403-04 B HALL
Solicitation # mjcc-hvac-bld-1403-04-b-hall
Insights Training Group LLC, on behalf of the Muhlenberg Job Corps Center in Kentucky, is soliciting fixed-price quotes for an HVAC project at Building 1403-04 B Hall. The scope of work requires the contractor to provide all labor, materials, equipment, and supervision to install two 4-ton twinned split systems featuring Trane condensing units with a minimum 17 SEER rating and 95% AFUE high-efficiency gas furnaces using R-454B refrigerant. Additional requirements include the installation of high-efficiency evaporator coils, 2-inch filter racks, new refrigerant line sets, and condensate drain piping. The project must be completed within 45 days of award, and the contractor is responsible for all testing, inspections, and the provision of operating and maintenance manuals. This solicitation is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified entities. To be considered technically acceptable, offerors must be registered and licensed in the State of Kentucky, verified through the SAM portal, and provide a minimum 90-day bid guarantee along with proof of ability to secure performance and payment bonding. Award will be granted to the responsible offeror with a technically acceptable quote and the lowest price. Compliance with the Davis-Bacon Act is mandatory, requiring the submission of weekly certified payroll and a signed Statement of Compliance with every invoice. All work must adhere to local codes, manufacturer specifications, and OSHA and EPA regulations, with a strict requirement for maintaining Materials Safety Data Sheets for all products used on site. Quotes are due by October 30, 2026.
Muhlenberg Job Corps Center / Insights Training Group LLC

POSTED

about 7 hours ago

DEADLINE

in 8 days
NAICS: 238220
New
Roswell JCC – Male Dormitory Bldg. Water Source Heat Pump Replacement (20 units)
Solicitation # roswell-jcc-male-dormitory-bldg-water-source-heat-pump-replacement-20-units
Career Systems Development Corporation is soliciting proposals for the total replacement of twenty ceiling-mounted water source heat pumps at the Roswell Job Corps Center Male Dormitory Building 558 in New Mexico. The scope of work includes the removal and off-site disposal of twenty failed units and the installation of new Bosch 1-ton units or equivalent, including all necessary ducting, electrical, gas, thermostat wiring, flexible hoses, and pressure valves. Additionally, the contractor must install smoke dampers with fusible links in all vents leading into the plenum and ensure all materials used in the plenum are plenum-rated. All work must comply with NFPA 101, NFPA 70, and applicable plumbing, mechanical, and building codes, with performance scheduled between 7:00 am and 4:00 pm, Monday through Friday. This solicitation is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. The project is subject to the Davis Bacon Act Wage Determination NM20260014, requiring the submission and approval of weekly certified payroll reports prior to invoice payment. Proposals exceeding $100,000.00 require payment and performance bonding for 100% of the contract value. Submissions must include a safe work process, detailed costs for labor and materials, equipment cut sheets, warranty information, and a requested payment schedule. Final deliverables include the provision of operation manuals to the Facility Manager upon project completion.
Career Systems Development Corporation

POSTED

about 7 hours ago

DEADLINE

in 16 days

General Info

NAICS

238220 - Plumbing, Heating, and Air-Conditioning Contractors

Place of Performance

Veterans Integrated Service Network (VISN) 1;VA Medical Centers of New England, ME, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Sources Sought

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Veterans Affairs → 241-NETWORK Contract Office 01 (36C241)
Contacts1 person available
OfficeTOGUS, ME, 04330, USA
Office AddressTOGUS, ME, 04330, USA
Contacts

Full Description

Show more
Sources Sought Notice Boiler Inspection, Maintenance, Repairs, Testing, Calibration of Burners, Controls Instruments and Data Management for Veterans Integrated Service Network (VISN) 1, VA Medical Centers of New England PURPOSE: The VHA Network Contracting Office (NCO) 1 is conducting market research to enhance NCO 1 s understanding of the market s offered services, capabilities and potential small business sources. A draft scope of the boiler services is included below. Interested vendors shall submit a capability statement with the following information. Which locations does your firm service? Does your firm have the capability to meet the minimum four (4) hour response time for emergency services at all medical centers? If not, to which centers are you capable of responding to an emergency call in 4 hours? Does your firm service all equipment listed below? If not, please provide a list of which equipment you are capable of servicing. Briefly describe your firm s qualifications for the services listed. Are you capable of providing the following? National Board of Boiler and Pressure Vessels Commissioned Inspector Five years successful experience in this field to include experience with institutional and industrial boiler plants Factory training certificates or credentials or acceptable equivalent? Percentage of work your firm will provide _____, % of subcontractors ______ Company Name and Address DUNS and CAGE Code Point of Contact Size of Business (i.e. SDVOSB/VOSB, Small Business, 8 (a), HubZone, WOSB) Submit response (along with any supporting documentation) directly to: tammy.davis6@va.gov. This is a Sources Sought notice and not a request for quotes. This request is solely for the purpose of conducting market research to enhance NCO 1 s understanding of the market s offered services, capabilities and potential small business sources. The Government will not pay any costs for responses submitted in response to this Sources Sought. DRAFT SCOPE Boiler Inspection, Maintenance, Repairs, Testing, Calibration of Burners, Controls Instruments and Data Management for Veterans Integrated Service Network (VISN) 1 VA Medical Centers of New England as follows: VA CT Medical Center Newington, 555 Willard Ave. Newington, CT 06111 3 - Zurn industries - 1975 ,water tube, 12,000 lbs./hr,90psi. VA CT Medical Center West Haven, 950 Campbell Ave. West Haven, CT 06516 3 Cleaver brooks DL-60 - 1981, water tube 41,000 de-rated 31,000 lbs./hr., 110psi. 2 Victory boilers - 2016, 21,468 lbs./hr. REQUIREMENTS: Annual inspection of each boiler (internal and external), deaerator tank (internal and external) and hot well system. Preventative maintenance and emergency repairs Emergency repairs VA Medical Center Edith Nourse Rogers, 200 Springs Rd, Bedford MA 01730 Preferred Instruments, CB Hawk, Foxboro, Yokogawa, Siemens & Johnson Controls 3 Cleaver Brooks CB700LE boilers 2 HB Smith, 14 section cast iron low pressure boilers, Model Numbers 28A-14-060779 & 28HE-S/W-14, combination gas/oil firing 3 Cleaver Brooks Low Emission (LE) fire-tube boilers REQUIREMENTS: Semi-annual calibrations of boiler plant controls and instrumentation for three boilers and other plant equipment. Contractor will also provide all labor and materials required to perform burner calibration on 3 Cleaver Brooks CB700LE boilers. Contractor must have a laptop computer and required software to plug into & back-up all settings in the PCCIII controls and provide a back-up flash drive Provide calibration reports for each piece of equipment, indicating date, settings, pass/fail, technical data, and name of technician performing calibrations. The following is a list of devices that will require calibration: PLANT MASTER PCIII: Outside Air Temp; Plant Steam Flow; Distribution Steam Flow; Plant Demand; Steam Header Press Hi/Lo & Alarms; Oil Pressure Transmitter & Alarms; Propane Pilot Gas Transmitter & Alarms; Main Gas Pressure Transmitter & Alarms; Control Air Pressure Transmitter & Alarms; Low Main Gas Pressure Alarm; High Main Gas Pressure Alarm; Explosive Gas & Carbon Monoxide Detection System DA PCIII: High Oil Header Press Alarm; Low Oil Header Press Alarm; DA Steam PSI; DA Temp; DA Level; High DA Level Alarm; Low DA Level Alarm COND PCIII: Condensate Tank Level; Condensate Tank High Level Alarm; Condensate Tank Low Level Alarm; Condensate Tank Temp; Condensate Tank Make Up Valve #1& #2 BOILER MASTER PCIII : Plant Demand; Boiler Demand; Firing Rate; Steam Flow; Economizer Flue Temp In #1 & #2 DRAFT PCIII: Oxygen Transmitter; Damper %; Outlet Temp; Jackshaft Position; Efficiency #1 & #2 FUEL FLOW PCIII : Boiler Gas Flow; Boiler Oil Flow; Flue Gas Temp; Monitor Calibration; Flue Gas Temp Hi & Low Temp Alarms #1 & #2 ECONOMIZER FW TEMP IN & OUT #3 BOILER: Steam Flow ; Oil Flow; Gas Flow; Oxygen Transmitter; Water Flow; FW Press; FW Temp; Economizer Temp In/Out; Boiler Water Temp; Boiler Oxygen #3 FEEDWATER PUMP VARIABLE FREQUENCY DRIVE UNIT Note; there will be new DA High and Low level alarms and Condensate High and Low level alarms installed separate from the PCIII alarms. Separate testing and calibration will be required for these beginning with the first calibration cycle of this contract. Contractor will provide all labor and materials required to perform burner calibration on 3 Cleaver Brooks CB700LE boilers. Each burner assembly will be inspected & adjusted to manufacturer s settings. Each boiler will be calibrated on gas and oil firing twice a year, approximately 6 months apart, as scheduled by the Plant Supervisor. Contractor will provide burner calibration printouts for each pin on the gas and oil cams (12 for Boilers 1 & 2) & (20 on #3 CB Hawk). Settings will be as close & safe as possible for max input for gas & oil firing at high fire as per the inputs listed on the boiler plate. Vendor will calibrate the burners and not exceed the requirements of this facilities permit for emissions. Work to be performed on 2 HB Smith, 14 section cast iron low pressure boilers, Model Numbers 28A-14-060779 & 28HE-S/W-14, combination gas/oil firing. Responsible for annual opening & cleaning of water and firesides and preparing the boilers for internal inspections Once inspections are complete, the contractor will return, close up the boilers, fill the boilers and then perform combustion testing on both oil and gas firing. Combustion reports will be provided to COR. Perform a combustion efficiency test and provide a written report to designated personnel. Set up a boiler room logbook to be signed by all persons entering the boiler room Prepare boiler for annual inspection: schedule cleaning during the summer months. Vacuum clean all fireside surfaces. Flush and clean waterside, open and clean mud drums where applicable. Open and clean all low water, feeder and pump controls. Reassemble, replace gaskets and install new strainers. Clean flue and chimney base. Reseal any leaks around boiler doors or plates after inspection. Full pre-season maintenance cleaning of the burners, adjust for maximum efficiency. Contractor will respond within 4 hours when a call is placed for emergency service. Perform Semi-Annual Safety Device Testing on 3 each Cleaver Brooks Low Emission (LE) fire-tube boilers, and other plant equipment Devices tested shall include, but not limited to: High-steam pressure cut-out (recycle), High-steam pressure cut-out (non-recycle); Steam safety valves (raise boiler pressure until valves lift and reset); Check gas vent for leaks; High-gas fuel pressure cut-off; Low-gas fuel pressure cut-off; Gas fuel safety shut off valves proof of closure; Leak test fuel oil safety shut off valves; Check operation of Liquid Propane Gas pilot; Low-pilot gas pressure cut-out; Forced draft fan motor interlock; Forced draft fan damper wide open for purge; Boiler outlet damper wide open for purge; Purge air flow interlock; Timing for pre-purge; Timing for post-purge; Igniter timing; Leak test gas fuel safety shut off valves; High-fuel oil temperature cut-off (heated fuel, N/A); Low-fuel oil temperature cut-off (heated fuel, N/A); Low-atomizing pressure for fuel oil (hh) Low fire position interlock; Combustion air interlocks; Main flame out; i.e., time to close valves; Ignition flame out; i.e., time to close valves; Minimum igniter flame test; Scanner not sensing ignition spark; Low-oxygen alarm and/or cut-out; Pre-purge setting of flue gas recirculation damper; Interlock of building outside air damper with burner control; High-fuel oil pressure cut-off; Low fuel oil pressure cut-off; De-aerating (DA) tank high and low level alarms; DA tank overflow device; DA tank high pressure alarm; Condensate Receiver tank high and low level alarms; DA tank low pressure alarm. VA Medical Center Providence, 830 Chalkstone Avenue, Providence, RI 02908 3 Boilers Manufacturer: Cleaver Brooks Model and Capacity: D Shape Water Tube 16,000 lb/hr Serial #: National Board No.: Typical Operating Pressure: 115 lbs Design Pressure 250 lbs Date of Manufacture: 1978 Boiler Controls: Fireeye Burner Manufacturer: Cleaver Brooks Type of Burner: Ring Fuels: Natural Gas/#2 Oil Date of Manufacture: Installed 1988 REQUIREMENTS: Annual boiler inspections and monthly safety device testing. All the boilers are water tube boilers. Only one interior and one exterior inspection will be scheduled per week. This procedure typically takes three (3) consecutive weeks. The annual operational testing will be accomplished at three (3) separate times during the year. Inspections will be in compliance with National Board Inspection Code & ASME Code Provide complete written report of the inspections or testing fully describing all tests performed, all findings, and recommendations. All safety-related deficiencies shall be immediately reported to the Boiler Plant Supervisor during the inspection visit VA Medical Center Central Western Massachusetts, 421 North Main Street, Leeds, MA 01053 (3) 250 BHP Johnston Firetube Boilers, Model PFTA250-4LG200S, Built 2011, max capacity 8,368 LBS/HR, 4,000 sq. ft. heating surface, max gas firing rate 9,800 MBTU/HR, operating at 70 psig (1) 19 BHP Cain Heat Recovery Steam Generator, max capacity 647 LBS/HR, 478 sq. ft. heating surface, safety valve setpoint 15 psig (1) 840 Gallon Feedwater Deaerator Preferred Utilities Boiler Control System REQUIREMENTS: Inspection, testing and calibration of the boilers, burners, controls, instruments and data management system, HRSG, and deaerator. Technicians shall be equipped with portable electronic flue gas analyzers and other test instruments necessary for the required tests and calibrations, all calibrated within one month of the site visits. This facility has programmable digital controls; all technicians must be capable of programming the controls and have the appropriate hardware and software for this. Technicians shall perform inspection, tuning, testing, calibrating, and adjustments of burners and boiler and boiler plant controls. This shall be done every six months in accordance with the schedule provided by VAMC. This service specifically covers (2) Semiannual services for each Boiler, and (2) Tune Up Services for each Boiler. Instrumentation, monitoring and data management systems shall be calibrated every six months Perform overall visual inspection of systems. Verify that systems comply with referenced codes and VAMC requirements stated in this contract. Test and record the operation and set points of all burner/boiler safety interlock devices. Refer to list below. Verify that the set points and operating points are within allowable operating parameters. Make adjustments as necessary and record the new settings. The operation of a device must result in burner shutdown and/or proper alarm operation. Operate burner(s) on each fuel from low fire to high fire and back to low fire in at least four increments and record combustion performance (flue gas oxygen, carbon monoxide, NOX where applicable), fuel train pressures, atomizing train pressures, burner pressures, stack temperatures, boiler steam output. Compare the combustion performance data with VAMC requirements and previous readings. If necessary, make adjustments to the fuel flow and combustion air controllers, control valves and dampers to obtain the required performance. Record the new performance data. Verify accuracy of instrumentation. Verify that all devices are properly selected for the application in terms of type, size, set point range, performance, code approval. Calibrate all instruments that are not within manufacturer s specifications for accuracy. List of interlocks, safety devices, and gauges to be inspected, tested, or calibrated (including but not limited to). Semi Annually on each boiler/burner: Low-water cutoff (slow drain); Fire each boiler and the pilot on the alternate fuel for 1 hour; Low-water cutoff shunt switch; Auxiliary low-water cut-off (slow drain); Auxiliary low-water cut-off shunt switch; High-water alarm; Low-water alarm; High-steam pressure cut-out (recycle); High-steam pressure cut-out (non-recycle); Steam safety valves (raise boiler pressure until valve pops); Flame scanner; Check gas vent for leaks; High-gas fuel pressure cut-off; Low-gas fuel pressure cut-off; Gas fuel safety shut off valves proof of closure; Leak test gas fuel safety shut off valves; High-fuel oil temperature cut-off (heated fuel); Low-fuel oil temperature cut-off (heated fuel); Low-atomizing pressure for fuel oil; High-fuel oil pressure cut-off Low-fuel oil pressure cut-off; Leak test fuel oil safety shut off valves; Check operation of Liquid Petroleum Gas pilot; Low-pilot gas pressure cut-out; Forced draft fan motor interlock; Forced draft fan damper wide open for purge; Boiler outlet damper wide open for purge; Purge air flow interlock; Timing for pre-purge; Timing for post-purge; Igniter timing; Low fire position interlock; Combustion air interlock; Main flame out; i.e., time to close valves; Ignition flame out; i.e., it is time to close valves; Minimum igniter flame test; Scanner not sensing ignition spark; Low-oxygen alarm and/or cut-out; Pre-purge setting of flue gas recirculation damper; Fuel oil safety shut off valves proof of closure The following items will be completed on an annual basis: Steam safety valves (accumulation test at high fire); Required burner performance (natural gas and fuel oil); Turndown (ratio of maximum and minimum firing rates): 10/1 8/1 5/1 4/1 (Refer to original burner specification); Achieve, but do not exceed, boiler maximum steam flow output rating. Measure fuel input at minimum and maximum firing rates; Maximum carbon monoxide: 200 parts per million (ppm); Flue gas oxygen: 2.5 4.2% (Up to 5.2% at loads below 40% of maximum steam output; no upper limit at minimum firing rate; oxygen can be one percentage point higher on oil firing on single-point positioning systems); Flue gas oxygen (low excess air burners): 1.0 2.0% (Up to 2.5% at loads below 40% of maximum steam output; no upper limit at minimum firing rate; oxygen can be one percentage point higher on oil firing on single point positioning systems); Flames shall be stable with no pulsations, shall be retained near burner, no blowoff or flashbacks, no constant flame impingement on refractory or waterwalls. List of instrumentation and controls to be inspected and calibrated semi-annually (including but not limited to):Steam flow transmitters (all); Steam flow recorders/computer readout; Flue gas oxygen sampling, analyzing and recorder/computer readout; Boiler and economizer stack temperature transmitters and recorder/computer readout; Master steam pressure and combustion controllers; Boiler outlet draft controllers; Boiler water level controllers; Feedwater deaerator and condensate storage tank water level controllers including overflow; All pressure and temperature sensors and transmitters; All signal processing and readout devices. Emergency Response: emergency 4hr call back with 24 hour response time. VAMC Manchester, 718 Smyth Road, Manchester, NH 03104 3 Cleaver Brooks REQUIREMENTS: Technicians shall perform inspection, tuning, testing, calibrating, and adjustments of burners and boiler and boiler plant controls every 6 months. Instrumentation, monitoring and data management systems shall be calibrated every six months Review boiler plant log sheets and alarm and trouble reports. Review records that show combustion performance (flue gas oxygen and carbon monoxide). Perform overall visual inspection of systems. Verify that systems comply with referenced codes and VAMC requirements stated in this contract. Test and record the operation and set points of all burner/boiler safety interlock devices. Verify that the set points and operating points are within approximately 20% of normal operating parameters. Make adjustments as necessary and record the new settings. The operation of a device must result in burner shutdown and/or proper alarm operation. Operate burner(s) on each fuel from low fire to high fire and back to low fire in at least six increments and record combustion performance (flue gas oxygen, carbon monoxide, NOx where applicable), fuel train pressures, atomizing train pressures, burner pressures, stack temperatures, boiler steam output. Compare the combustion performance data with VAMC requirements and previous readings. If necessary, make adjustments to the fuel flow and combustion air controllers, control valves and dampers to obtain the required performance. Record the new performance data. Verify accuracy of instrumentation. Verify that all devices are properly selected for the application in terms of type, size, set point range, performance, code approval. Calibrate all instruments that are not within manufacturer s specifications for accuracy. List of interlocks and safety devices to be inspected and tested on each boiler/burner: Low water cutoff and shunt switch; Auxiliary low water cutoff and shunt switch; High water alarm; Low water alarm; High operating steam pressure switch recycle; High operating steam pressure switch non-recycle; High and low main fuel pressure switches (gas/oil); Low pilot gas (igniter) pressure switch; High and low fuel temperature switches (heated oil); Low fuel oil atomizing media (steam/compr.air) pressure switches; Low differential pressure switch, atomizing media/fuel oil (if provided by burner manufacturer); Low flue gas oxygen; Oil burner position switch (if provided by burner manufacturer); Fuel safety shut off valves proof of closure (overtravel/valve seal switch); Leak test fuel safety shut off valves (main and pilot burners) (seat leakage); Leak test gas fuel vent valves; Forced draft motor interlock; Forced draft damper wide-open interlock for purge; Outlet damper open interlock for purge (if outlet damper provided); Purge airflow interlock; Purge timing; Ignition timing; Low fire position interlock; Combustion airflow interlock; Main flame out time to close fuel valves; Ignition flame out burner shutdown; Scanner not sensing ignition spark (ultraviolet scanner); Scanner not sensing hot refractory (infrared scanner); Control air pressure interlock; Low flue gas oxygen interlock; Flue gas recirculation damper set for prepurge. Required burner performance (natural gas and fuel oil): Turndown (ratio of maximum and minimum firing rates): 10/1 8/1 5/1 4/1 (Refer to original burner specification); Achieve, but do not exceed, boiler maximum steam flow output rating. Measure fuel input at minimum and maximum firing rates; Maximum carbon monoxide: 200 parts per million (ppm); Maximum NOx: _____ (Refer to original burner specification); Flue gas oxygen: 2.5 4.2% (Up to 5.2% at loads below 40% of maximum steam output; no upper limit at minimum firing rate; oxygen can be one percentage point higher on oil firing on single-point positioning systems); Flue gas oxygen (low excess air burners): 1.0 2.0% (Up to 2.5% at loads below 40% of maximum steam output; no upper limit at minimum firing rate; oxygen can be one percentage point higher on oil firing on single point positioning systems); No visible smoke, except on heavy oil fuel maximum opacity is 20%. Comply with local emissions regulations; Need a copy of the plant permit and references for the plant; Flames shall be stable with no pulsations, shall be retained near burner, no blowoff or flashbacks, no constant flame impingement on refractory or waterwalls. List of instrumentation and controls to be inspected and calibrated: Steam flow transmitters (all); Steam flow recorders/computer readout; Flue gas oxygen sampling, analyzing and recorder/computer readout; Boiler and economizer stack temperature transmitters and recorder/computer readout; Master steam pressure and combustion controllers; Boiler outlet draft controllers; Boiler water level controllers; Feedwater deaerator and condensate storage tank water level controllers including overflow; All pressure and temperature sensors and transmitters; All signal processing and readout devices. Veterans Affairs Medical Center, 150 South Huntington Ave, Jamaica Plain, MA 02130 Cleaver Brooks Boilers and the associated SCADA MANUFACTURER ITEM NAME MODEL # SERIAL# Cleaver-Brooks Fire tube Boiler 4WI-200-805-200ST T4757-1-1 Cleaver-Brooks Fire tube Boiler 4WI-200-705-200ST T2049-1-1 Cleaver-Brooks Fire tube Boiler CB200-300 L-86842 4-Motor, pump and drive Feedwater pumps 2- Make-up Make up pumps Manufacturer Model Serial Number Installation Date Cleaver-Brooks CB200-250 0L093816 1995 Cleaver-Brooks D-24 WL-2670 1977 Cleaver-Brooks CB100-300 NB41330 1977 REQUIREMENTS: basic preventive maintenance and emergency call back services for the boiler systems and the associated boiler controls clean, lubricate, calibrate, test and replace faulty or worn parts and/or parts which are likely to become faulty, fail or become worn, repair or adjust components, or assemblies of components as necessitated by wear, tear, damage, or failure of parts, returning the equipment and/or instrument to the operating condition defined in the manufacturer s specifications. Repair a system according to manufactures' specifications, manufacturer requirements and applicable state of Massachusetts building codes. The Contractor shall respond to emergency call back service within four hours or less. Quarterly inspections include: Clean and adjust burner; Assure positive ignition, adjust and clean as required; Determine response to flame safeguard system for monitoring and safety shutdown; Perform combustion analysis, and adjust fuel/air ratio for optimum efficiency; Check fuel supply (gas/oil) which is affected by pumps, strainers, gauges, and regulators; Check reliability of low water cut-off, pump control, operating and limit controls in accordance with manufacturer's recommendations; Check gaskets on fuel lines, fireside and waterside, and make suggestions for any corrective action required; Check and suggest necessary parts for inventory; Inspect and assure proper operation of related equipment such as boiler feed tank, pumps; Monitor SCADA package for reliability and alert customer to any available updates; Check operation of feed water pumps. Provide preventative maintenance in accordance with manufacturer recommendations; Check operation of variable speed drives for make-up water and feed water pumps. Preventative Maintenance Opening & Cleaning of fire and water sides: Isolate and lock out boiler gas, boiler oil, steam & water valves; Secure and lock out electricity & pumps; Open front & rear doors; Remove all fire & water side gaskets; Clean & inspect tubes (brush/punch tubes); Open Watersides & flush; Suggest itemized list for any parts for replacement Closing of fire & water sides: Provide new front & Rear door gaskets; Close front & rear door; Close Watersides using new gaskets; Re-align boiler gas & water valves; Test safety s; Verify operation & Test fire only Pumps-boiler feedwater and make up water: Monitor and measure vibration. Compare to manufactures tolerances; Check seals and gaskets for leaks and deterioration; Measure and verify shaft deflection. Schedule outage to make adjustments and align; Check for clogs. Clean strainers and remove restrictions; Provide thermal image of pump and motor. Report deficiencies with a plan to correct; Verify operation and demonstrate proper operation. REGULATIONS: All work shall be done in accordance with OSHA, EPA regulations, NFPA codes, VA codes, Federal, State, and local regulations National Board Inspection Code & ASME Code NFPA 85, Boiler and Combustion Systems Hazards Code. VHA Boiler Plant Safety Device Testing Manual, 3rd Edition. Combustion Systems Hazards Code

More opportunities from Department Of Veterans Affairs → 241-NETWORK Contract Office 01 (36C241)

Same awarding agency

NAICS: 811310
New
Federal
H146--Hach Water Quality Monitoring Service
Solicitation # 36C24127Q0031
The Department of Veterans Affairs Networking Contracting Office intends to enter into a sole source procurement with Hach Company under FAR 6.302-1 for water quality monitoring services at the VA Medical Center in White River Junction, Vermont. This requirement is designated under NAICS code 811310. The scope of work involves the inspection, maintenance, repair, and annual calibration of ten Hach water quality monitoring instruments located across several facility buildings, as well as the annual calibration of one colorimeter. The contract includes two scheduled visits per 12-month period, 24/7 emergency service, and monthly reagent refills. These services are critical for ensuring the supply of safe drinking water and generating the daily data reports required by the State of Vermont Drinking Water Protection Division. The procurement is awarded to Hach Company because the equipment and services are proprietary, and the manufacturer does not authorize other organizations to perform repairs or recalibrations. Because the work is performed within a functioning hospital, the contractor must adhere to strict infection control practices and submit an Infection Control Plan, Activity Hazard Analysis, and Material Safety Data Sheets for approval. All work must comply with NFPA, OSHA, EPA, and specific VA specifications and handbooks. The government retains all rights to data and electronic records produced under the contract, and the contractor must comply with the Privacy Act of 1974 and the Freedom of Information Act. Interested parties must submit their capabilities to Kenya Mitchell by the specified deadline to determine if competitive procedures are feasible.
Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance

POSTED

1 day ago

DEADLINE

in 2 days
View Details
NAICS: 561730
New
Federal
S208--West Haven Grounds and Maintenance
Solicitation # 36C24127Q0004
The Department of Veterans Affairs, Network Contracting Office 1, is soliciting proposals for a firm-fixed-price contract to provide comprehensive grounds maintenance, snow and ice removal, and storm drain cleaning services at the West Haven VA Medical Center in Connecticut. This total small business set-aside under NAICS 561730 includes a base year and four option years, with a total duration not to exceed five years. The scope of work requires 24/7 availability for snow and ice events, with a mandatory response time of one hour and the requirement for a field service representative located within 200 miles of the campus. Key services include mowing 30 acres of improved grounds, fall leaf removal, bi-annual storm drain cleaning for both West Haven and Newington campuses, and specialized snow removal for parking garages. Fertilization, pest control, and soil aeration are expressly excluded from the contract. Award will be granted to the Lowest Priced Technically Acceptable (LPTA) offeror. Technical acceptability is based on the capability to perform all services, equipment inventory, and personnel qualifications, while past performance is evaluated on a go/no-go basis requiring at least three references from the last five years. Proposals must be submitted in two volumes, consisting of a technical capability statement and a completed CLIN pricing schedule, by October 29, 2026, at 10:00 AM Eastern Time. Performance is monitored via specific acceptable quality levels based on customer complaints, and the contractor must adhere to Service Contract Labor Standards for the West Haven and Newington areas.
Landscaping Services

POSTED

1 day ago

DEADLINE

in 8 days
View Details
NAICS: 561730
New
Federal
S208--Landscaping and Snow Removal Services
Solicitation # 36C24127Q0019
Solicitation 36C24127Q0019 is a combined synopsis and request for quotations issued by the Department of Veterans Affairs for landscaping and snow removal services at the Providence VA Medical Center, the VA Facility at 500 Valley Street, and the Harwood Center in Providence, Rhode Island. This procurement is a total set-aside for Veteran-Owned Small Businesses under NAICS code 561730. The contract structure consists of one base year and four option years, with an estimated start date of November 1, 2026. The scope of work encompasses comprehensive grounds maintenance, including lawn mowing, trimming, edging, and debris removal for approximately 5.28 acres, as well as snow removal, ice control for pedestrians and roads, and off-site snow hauling limited to 500 cubic yards annually. The government will utilize a comparative evaluation process to determine the best benefit, considering technical quality, past performance, and total evaluated price, including a six-month extension under FAR 52.217-8. Key deliverables include a snow removal logistics plan and strict adherence to acceptable quality levels, with 100 percent compliance required for snow and ice control services. Offerors must submit their responses by October 21, 2026, and must include a signed VA Notice of Limitations on Subcontracting Certificate of Compliance to be eligible for award. Invoicing is to be processed through the Tungsten Network. Amendment 0001 further refined the performance work statement, pricing structure, and provided industry clarifications regarding weather reporting and equipment protocols.
Landscaping Services

POSTED

2 days ago

DEADLINE

in about 6 hours
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS