Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Defense was posted on July 7, 2020. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

61--CONTROLLER,MOTOR, IN REPAIR/MODIFICATION OF

Awarded
N0038320RD114Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 811310
New
Kubota M8200 Clutch Replacement
Solicitation # kubota-m8200-clutch-replacement
Management & Training Corporation is soliciting bids for the clutch replacement of a Kubota M8200 tractor with front wheel assist, no cab or loader, located at the Earle C. Clements Job Corps Center in Morganfield, Kentucky. The scope of work requires the contractor to provide all transportation, labor, supervision, tools, and new manufacturer-specified parts to diagnose and repair the clutch assembly and power take-off system. Key technical requirements include disassembling tractor components, replacing friction discs, bearings, oil seals, and O-rings, resurfacing the flywheel, and replacing hydraulic pipes and filters as necessary. The contractor must verify proper clutch engagement and disengagement and test the PTO system under load to ensure the unit is restored to safe operating condition. This is a small business set-aside solicitation with a response deadline of November 3, 2026. Award will be based on best value, and bidders must submit a bid sheet, a completed supplier packet including a W-9 and self-certification form, and proof of insurance. The contract is subject to various federal regulations, including Service Contract Labor Standards under Wage Determination 2015-4687 Revision 31 for Kentucky, and FAR clauses regarding the utilization of small business concerns and combating trafficking in persons. Final acceptance of the work is contingent upon inspection by the Facility Maintenance Department to verify operational functionality and adherence to manufacturer specifications.
Earle C. Clements Job Corps Center

POSTED

24 minutes ago

DEADLINE

in 3 days
NAICS: 811310
New
SLED
Asphalt Storage Tank Maintenance and Repair
Solicitation # 601320000072188
The Texas Department of Transportation (TxDOT) issued Invitation for Bid (IFB) 601320000072188 in October 2026 for the maintenance and repair of two Duraco Model 8250 asphalt storage tanks located at the Gonzales Maintenance Facility in District 13. The scope of work includes the cleaning of tanks, installation of new manway gaskets and other necessary seals, and the off-site transport and disposal of all removed materials in compliance with Texas Health and Safety Code Chapter 361. All work must be performed according to manufacturer recommendations and applicable standards, with a final inspection required by a TxDOT representative prior to invoicing. Responses are due by November 6, 2026, at 3:00 p.m. Central Time and must be submitted via the Euna Procurement portal. Bidders are required to provide a comprehensive submission including a price schedule in Excel format, qualifications and references, an approach to work, and mandatory certifications regarding child support obligations and legal eligibility. TxDOT will award the contract based on best value, primarily considering purchase price, compliance with specifications, and the risk of vendor non-performance. To pass the initial evaluation, vendors must maintain a performance rating of A, B, or C in the CPA Vendor Performance Tracking System. The selected vendor must adhere to strict insurance requirements, including policies from companies with an A.M. Best rating of A- or better, and maintain confidentiality regarding all TxDOT business information. Payments will be processed electronically in accordance with Texas Government Code Chapter 2251. Additionally, respondents must certify compliance with various state and federal laws, including the Texas Free Enterprise and Antitrust Act and Title VI assurances, while agreeing to prioritize the purchase of Texas-produced materials when available.
Texas Department of Transportation

POSTED

about 22 hours ago

DEADLINE

in 6 days
NAICS: 811310
New
SLED
Conveyance Maintenance Services
Solicitation # 26-1336
Chicago Public Schools is soliciting bids for Conveyance Maintenance Services under solicitation number 26-1336 to implement a comprehensive preventive maintenance program for conveyance equipment. The selected bidder will provide all labor, materials, and supervision necessary to ensure equipment remains safe and operational, adhering to the City of Chicago Municipal Code, ASME A17.1/CSA B44, ASME A17.3, and original equipment manufacturer standards. The contract includes a three-year initial term with the possibility of two automatic renewals of two years each. Services involve monthly preventive maintenance during normal working hours from 6:00 a.m. to 2:30 p.m., as well as 24/7 emergency callback support. Key deliverables include site-specific maintenance schedules, the use of CPS facilities software for reporting, and an annual Executive Summary Report based on a 7-point assessment rubric. The agreement will be awarded to the lowest, responsive, and responsible bidder based on evaluation factors including price, business stability, professional qualifications, past performance, and capacity. Bidders must submit a comprehensive package via Bonfire, including an Excel-based bid tabulation, audited financial statements for the last three fiscal years, three non-Board references, and a W-9 tax form. Compliance with MBE/WBE aspirational goals of 30% and 7% respectively is required, along with adherence to the Illinois Minimum Wage Law and various federal and state non-discrimination acts. Invoicing must be submitted electronically in PDF format, with payments processed according to the Local Government Prompt Payment Act. All shipments are designated as F.O.B. destination. The deadline for questions is November 6, 2026, and the final response deadline is November 20, 2026.
Chicago Public Schools

POSTED

about 23 hours ago

DEADLINE

in 20 days
NAICS: 811310
New
SLED
Annual Inspection/Maint. and Repair on Generator at FMS #8
Solicitation # SRC0000037488
Solicitation SRC0000037488 is for the annual inspection, maintenance, and repair of a Speed Air air compressor (Model 1WD44, SN: D063475) at FMS #8 in Gadsden, Alabama. The scope of work includes replacing belts, collecting oil samples, and installing filters, cabinet filter mats, and repair kits for the oil and thermostatic valves. A mandatory site visit is required on November 18, 2026, at 10:00 AM at 5319 Airport Road, Gadsden, Alabama. The response deadline is November 23, 2026, and all bids must be submitted electronically through the Alabama Buys portal. The contract is managed by the Army MCA and the State of Alabama, with a maximum total value of 25,000 dollars over a potential five-year period, subject to annual renewals. Award evaluation will be based on price reasonableness, cost realism, and supplier qualifications, including professional licenses and insurance. Vendors must comply with the Code of Alabama, including the Beason-Hammon Alabama Taxpayer and Citizen Protection Act and registration requirements for foreign corporations. Payment will be handled electronically via P-cards, EFT, or state-issued credit cards. Final acceptance of services is contingent upon a satisfactory inspection by the State of Alabama in accordance with the Universal Commerce Code.
Army MCA_App 01_Real Property Operations & Maintenance, State Military Department

POSTED

1 day ago

DEADLINE

in 22 days
NAICS: 811310
New
SLED
Electrical & Automation Services
Solicitation # 9181
The City of Denton is soliciting proposals for Electrical and Automation Services to support 12 Wartsila 18V50SG units located at the Denton Energy Center. The selected contractor must ensure all equipment operates within Original Equipment Manufacturer specifications without voiding existing warranties. Key performance requirements include providing personnel and service offers within one week of notice and completing repairs and services within five weeks of evaluation. The City will award the contract based on best value, evaluating submissions through a weighted scoring system: 30% for schedule timeliness, 30% for compliance with specifications, 20% for indicators of probable performance, and 20% for total cost of ownership. Submissions must be made via IONWAVE or hard copy by December 2, 2026, at 2:00 PM CT. Hard copy responses must be sealed, limited to 200 pages, and bound only with staples or binder clips. Required documentation includes proof of Texas state registration, a conflict of interest questionnaire, and a safety record. The contractor must comply with Davis-Bacon prevailing wage rates, the Buy American Act, and ADA non-discrimination practices. Invoicing must be submitted to the City's Accounts Payable department within 30 calendar days of service completion, with payments processed within 30 days of receipt. All deliverables must be shipped with weather-resistant labeling and a packing slip to the designated Denton address.
City Of Denton

POSTED

1 day ago

DEADLINE

in about 1 month
NAICS: 811310
New
SLED
In Shop Overhead Crane Maint Contract
Solicitation # 26-466MIL-ARNFF-B-54424
The Department of Military Affairs for the State of Illinois is soliciting bids under solicitation number 26-466MIL-ARNFF-B-54424 for the maintenance, service, annual inspection, and certification of twenty-eight overhead cranes located at various Army and Air National Guard facilities across Illinois. The scope of work requires the contractor to provide preventative maintenance during regular business hours and emergency services on a 24/7 basis. Key deliverables include annual certifications, load testing, monthly updated maintenance checklists, and quarterly reports detailing all repairs and parts used. All replacement parts must be Original Equipment Manufacturer (OEM) genuine parts, and the contractor must provide a one-year warranty on all materials and workmanship. The contract will be awarded to the lowest priced responsive and responsible bidder. Evaluation factors include price, financial resources, past performance, and the ability to provide required maintenance services. Bidders must submit responses electronically via the BidBuy portal by the November 17, 2026, deadline. Required documentation includes Vendor Disclosure and IPG Active Registered Vendor Disclosure forms. The awarded vendor must maintain comprehensive insurance coverage, including one million dollars in general commercial and auto liability, and comply with prevailing wage laws and the Buy American Act. Funding may be provided through a combination of state and federal sources, and the contract is contingent upon the availability of these appropriations.
ARNFFCLTIES466 - ARNG Facilities

POSTED

1 day ago

DEADLINE

in 17 days

AI Contract Overview

Show more

This contract, awarded by the Navsup Weapon Systems Support, tasks Northrop Grumman Systems Corp in Bethpage, New York, with the repair, overhaul, and modification of motor controllers. The contractor is responsible for providing all necessary labor, materials, and tooling to return units to a Ready For Issue condition, adhering to strict quality standards including ISO 9001 and SAE AS9100. The scope specifically prohibits the use of MIL-W-81381 wire, requiring SAE-AS22759 series wire instead, and mandates a comprehensive quality control system for purchased materials and internal processes. Key administrative provisions include specific protocols for Beyond Economical Repair and Missing on Induction determinations, both of which require written concurrence from DCMA. The contractor is granted limited Internal Review Board authority for minor non-conformances, while the Government retains formal Material Review Board authority for as-is dispositions. Additionally, the contract outlines strict configuration management requirements and mandates that any over and above repair efforts be approved by the Procuring Contracting Officer prior to execution.

General Info

Contract Value

$474,096

NAICS

811310 - Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance

Place of Performance

PA

Set-Aside

NONE

Award Issued Date

Documents

1
PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

1 update
PhaseAwarded
Posted

Presolicitation

Type Changed

Presolicitation → Sources Sought

Type Changed

Sources Sought → Solicitation

Notice updated

The notice description changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Navsup Weapon Systems Support
Contacts1 person available
OfficePHILADELPHIA, PA, 19111-5098, USA
Office AddressPHILADELPHIA, PA, 19111-5098, USA

Full Description

Show more
ITEM UNIQUE IDENTIFICATION AND VALUATION (MAR 2016)|19| | | | | | | | | || | | | | | | | | | HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|8| | | | | | | | | INSPECTION AND ACCEPTANCE OF SUPPLIES|26|x| | | | | | | | | | | |x| | | | | | || | | | | | | TIME OF DELIVERY (JUNE 1997)|20| | | | | | | | | | | | | | | | | || | | STOP-WORK ORDER (AUG 1989)|1| | WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)|16|tbd||tbd|tbd|tbd|tbd|tbd|tbd| | | | | | | | | NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|2| | | EQUAL OPPORTUNITY (SEP 2016)|2| | | SMALL BUSINESS SUBCONTRACTING PLAN (DOD CONTRACTS)- BASIC (MAY 2019)|1| | EQUAL OPPORTUNITY FOR VETERANS (OCT 2015)|4| | | | | SMALL BUSINESS SUBCONTRACTING PLAN (AUG 2018)(DEVIATION 2018-O0018)|5| | | | | | SAFEGUARDING SENSITIVE CONVENTIONAL ARMS, AMMUNITION, AND EXPLOSIVES (SEP 1999)|9| | | | | | | | | | EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (JUL 2014)|2| | | TRANSPORTATION OF SUPPLIES BY SEA (FEB 2019)|2| | | ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (JUN 2019)|11| | | | | | | | | | | | BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE (NOV 2014))|5| | | | | | BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM (NOV 2014)|1| | ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEC 2019)|12|336413|1250| | | | | | || | | | REPRESENTATION REGARDING CERTIAN TELECOMMUNICATIONS AND VIDEO SUREILLANCESERVICES OR EQUIPMENT (AUG 2019))|2| | | TYPE OF CONTRACT (APR 1984)|1| | NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2|DO-A1A |DO-A1A| ALL CONTRACTUAL DOCUMENTS (I.E. CONTRACTS, PURCHASE ORDERS, TASK ORDERS, DELIVERY ORDERS AND MODIFICATIONS) RELATED TO THE INSTANT PROCUREMENT ARE CONSIDERED TO BE "ISSUED" BY THE GOVERNMENT WHEN COPIES ARE EITHER DEPOSITED IN THE MAIL, TRANSMITTED BY FACSIMILE, OR SENT BY OTHER ELECTRONIC COMMERCE METHODS, SUCH AS EMAIL. THE GOVERNMENT'S ACCEPTANCE OF THE CONTRACTOR'S PROPOSAL CONSTITUTES BILATERAL AGREEMENT TO "ISSUE" CONTRACTUAL DOCUMENTS ARE DETAILED HEREIN. \ 1. SCOPE 1.1 Articles to be furnished hereunder shall be repaired, tested andinspected in accordance with the terms and conditions specified in theRequirements Section of this document. 1.2 Unless expressly provided for elsewhere in this clause, equipment suchas fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, orany other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not be provided by the Government or any other source and is the sole responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced specification. 1.3 The use of MIL-W-81381 wire in any item to be delivered under this procurement is prohibited. The foregoing prohibition applies notwithstanding any reference to MIL-W-81381 wire that may be made in any of the drawings or specifications for this procurement. SAE-AS22759 series wire shall be used in lieu of MIL-W-81381 wire, in any place where MIL-W-81381 wire is cited in this procurement. Any questions concerning this requirement should be directed to the Procuring Contracting Officer. 1.4 If MIL-STD-454 is referenced in the drawings or in the specification,the contractor is expected to show compliance with IPC/EIAJ-STD-001C Personnel performing tasks in accordance with IPC/EIAJ-STD-001C shall be trained and certified as requried by IPC/EIAJ-STD-001C paragraph 5.1.4. 2. APPLICABLE DOCUMENTS - NOT APPLICABLE 3. REQUIREMENTS The contractor shall maintain a quality control system which meets the requirements of Mil-I-45208A, Mil-Q 9858,ISO-9000 / 9001 / 9002 or equivalent. RESPONSIBILITY FOR INSPECTION: Unless otherwise specified, the contractor is responsible for the performance of all inspection requirements as specified herein. Except as otherwise specified, the contractor may use his own or any other facility suitable for the performance of the inspection requirements specified herein. PROCEDURES:The contractor shall prepare and maintain Quality Control Documentation, test and repair procedures, and inspection procedures which shall be made available to the Government for review and approval. The procedures shall include sequential diagrams of the test, repair, and inspection process, as well as the performance spcifications to perform the procedures. QUALITY ASSURANCE PROGRAM PLAN: The contractor shall develop, implement and maintain a Repair Quality Plan in compliance with the requirements of Mil-I-45208A, Mil-Q-9858, ISO,9000 / 9001 / 9002, or equvalent.The plan shall define the specific methods by which compliance with contractual requirements will be assured. All quality assurance data shall be provided to the Government for review and approval upon request. PURCHASED MATERIAL CONTROL: The contractor shall establish and maintain a system of control over purchased material which shall assure that the necessary requirements of this contract are included. in all sub contract agreements. A parts control system shall establish a record of performance for each purchased and internally manufactured part and shall be used to evaluate continued use of the source. The contractors control system shall be in compliance wil either Mil-I 45208A/Mil-Q-9858 or equivalent Quality Quality Assurance Standared.(ISO/AS:9000, 9001, 9002). RECEIVING INSPECTION OF PURCHASED MATERIAL: Purchased items shall be inspected upon receipt at the contractors facility to assure conformance with all requirements of the Technical Data Package (TDP). Evidence of such inspections shall be maintained for Government review at least twelve (12) months following acceptance of the end item. Inspection reports shall be maintained by the contractor. The inspection report shall, at a minimum, include a record of all dimensional data (coordinate/positional), material, finish, and process with appropriate pass/fail criteria, such ascertifications, and actual dimensional readings. FAILURE ANALYSIS AND CORRECTIVE ACTION:All failure analysis and corrective action reports/plans shall be submitted to the Government. NONCONFORMING MATERIAL:The contractor shall establish an effective system for controlling nonconforming material including procedures for identification, segregation, and disposition. CONTRACTOR INTERNAL REVIEW BOARD (IRB):IRB authority is delegated to the contractor for this contract only. The IRB may be used only for disposition of materials exhibiting minor non-conformances, scrap or rework to return a part to conformance with drawings or specifications as authorized by the approved repair procedures.IRB shall not use "AS-IS" disposition. A complete file of IRB actions shall be maintained for review by the Government for concurrance of classification. MATERIAL REVIEW BOARD (MRB):Formal MRB authority for disposition of "AS-IS"and for minor non-conformances is retained by the Government. The contractor shall submit the appropriate request for Waiver/Deviation via the DCMC to the NAVICP Contracting Officer. RESPONSIBILITY FOR COMPLIANCE: All items must meet all requirements of this Statement of Work. The inspection requirements set forth in this SOW shall become part of the contractors overall inspection system or quality program. The absence of any inspection requirements in the SOW shall not relieve the contractor of the responsibility of assuring that all Government equipment submitted for acceptance comply with all requirements. Sampling in quality conformance does not authorize submission of known defective items, either indicated or actual, nor does it commit the procuring activity to acceptance of any defective items. REPAIR ASSESSMENT TESTING: The Government may select samples of the Contract Line Items (CLINS) which have completed repair and have been accepted by the Government representative for the purpose of conducting performance testing, environmental testing, and quality conformance examination in a repair assessment test program. A quantity of CLIN's may be randomly selected from each quaterly repair production completion for shipment to the CFA or other Government designated location to conduct this testing. RECORDS OF DATA COLLECTION: The contractor shall maintain a historical record file to contain copies of applicable data and documents for individual CLIN's and assemblies by CLIN serial number. The historical record file shall include,but not be limited to the following types of historical records: Receipt inspection documentation. Repair shop travelers or repair cards. Parts replacement records. Parts inspection data before and after repair as applicable. Acceptance test data. QA personnel shall maintain a complete receipt inspection,test, repair re-test, history card for each item processed. This information shall be made available to the Government upon request. 3.1 1.0 GENERAL 3.1.1 This Statement of Work (SOW) establishes the criteria for repair and testing /inspection of the subject item. It includes inspection, component repair and replacement,reassembly and testing procedures required to return units back into a servicable condition. 3.2 2.0 DEFINITIONS. 3.2.1 CONTRACTOR: Is defined as the successful offeror awarded a contract, orderor issued a project work order. The term "contract" encompasses a contract, an order, or a project work order. 3.2.2 OVERHAUL: An overhauled part is one which has been disassembled, cleaned, inspected, repaired as necessary (by replacing or repairing all components which have been found to exceed limits established by the repair/overhaul manual) reassembled and tested in accordance with the approved repair/overhaul manual listed in this SOW and returned to a Ready for Issue (RFI) condition (Refer to contract schedule for items to be overhauled). 3.2.3 REPAIR: A repaired part is one which has been restored to a Ready for Issue(RFI) condition (by replacing or repairing those components found to be defective, broken, damaged or inoperative during the initial evaluation and troubleshooting phase) and tested in accordance with the approved repair/overhaul manual listed in this SOW (Refer to contract schedule for items to be repaired). 3.3 3.0 SCOPE 3.3.1 GENERAL. The items to be furnished hereunder shall be overhauled, upgraded,repaired, tested, inspected, and accepted in accordance with the terms and conditions specified in this contract. Unless expressly provided Government Furnished Property, including equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, special test equipment, or any other manufacturing aid required for the repair, manufacture, and/or testing of the subject item(s) will not be provided by the Government and shall be the responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing, manual, or specification for the contract items. 3.3.2 REPAIR UPGRADE REQUIREMENTS:The contractor shall provide the necessary facility, labor, materials, parts, and test and tooling equipment required to to return the following items to a Ready For Issue (RFI) condition: CONTROLLER,MOTOR ;1151942-3-1; P/N, ;6110-01-513-5241; NSN, ;ALL REPAIR MANUALS, DRAWINGS, AND SPECIFICATIONS.; Tech Publications 3.3.3 RFI is defined as that condition allowing the items to perform properly and reliably in an operational environment in a manner they were intended to operate.The contractor must perform all repairs/upgrades at the facility identified within this SOW. Repairs performed by the contractor or subcontractor shall be performed in accordance with the specified drawings and repair manual(s). 3.4 Changes to such manuals used for repairs under this contract, or changes to drawings or specifications used in the manufacture of parts utilized in these repairs, require Procuring Contracting Officer (PCO) approval in accordance with the Configuration Management provisions of this Statement of Work or contract. Under no circumstances should the repair, test, and inspection extend beyond the requirements of this paragraph unless authorized by the Government QAR.In addition, requests for approval of changes to a repair source or repair facility shall be submitted in writing to the PCO prior to making any such change. 3.4.1 Any repairs performed using unapproved changes to such manuals, drawings, specifications, or changes to repair source or facility are done at the contractor's own risk. If the Government disapproves the requested change, the contractor shall replace any delivered items repaired using such unapproved manuals,drawing, specification, repair source or repair facility change. The contractor is not entitled to any equitable adjustment to the contract price or terms based on the Government's disapproval of a requested change to manuals, drawings, specifications, or to a repair source or facility. 3.4.2 References on Drawings and Specifications:For repair and overhaul purposes only. All references to the "prime contractor" or the "actual manufacturer" appearing on the drawings and / or specifications or technical data furnished by the Government shall be read as the "Government Designated Agency" 3.4.3 Process Control Documentation: The contractor shall prepare and maintain repair procedures, and test / inspection information / procedures which shall be made available to the Government for review and approval. The procedures shall include sequential diagrams of processes, as well as the performance specifications to perform the testing / inspection procedures. Those processes shall be frozen after approval of the inspection / Test. 3.4.4 Beyond Economical Repair (BER). An item is BER if the cost of the repair exceeds 75% of the production quantity price to replace the item, current at time of award. This replacement price is for the purposes of BER determinations only, and may not be used or relied on by the offeror in the pricing of the repairs required by this contract. Items determined BER are not included in the contract price. The contractor shall obtain written concurrence from DCMA for all units determined by the contractor to be BER. All such determinations, including the basis for the determination, the repair required, the proposed price to repair and the DCMA written concurrence shall be provided by the contractor to the PCO, with a copy to the inventory manager. After receipt of the required documentation, the PCO shall provide the contractor disposition instructions or contractual authority for repair of the item. The contractor is not authorized to proceed with the repair until notification to proceed is received from the PCO. Any disposal ordered shall be performed by the contractor in accordance with all applicable regulations and in accordance with all DCMA disposal procedures and requirements. 3.4.5 Missing on Induction (MOI). A Weapons Repairable Assembly (WRA) is subject to this MOI provision if the item received by the contractor for repair is missing one or more Shop Replaceable Assemblies (SRAs). Contractor replacement of MOI SRAs is not included in the contract price. The contractor shall immediately notify DCMA when an item is received with MOI SRA(s) and shall obtain written verification from DCMA for all WRAs determined to have MOI SRA(s). The contractor shall provide all such determinations, including identification of the missing SRA(s), and the DCMA written verification, to the Inventory Manager with a copy to the PCO and ACO prior to induction and/or repair of the WRA. The contractor shall not induct and/or repair WRAs with MOI SRAs until instructions on how to proceed are provided to the contractor by the Inventory Manager (where no adjustment price to the contract is required) or by the PCO. Items received by the contractor missing consumable parts are not MOI items. Rather, repair of such items and replacement of the missing consumable parts are included in the contract price and the item shall be inducted and repaired by the contractor under this contract. 3.4.6 Replacing Failed or Missing Shop Replaceable Assembly (SRA) when repairinga Weapons Replaceable Assembly (WRA). 3.4.7 A. When the contractor believes one or more SRA(s) within a WRA are either: 3.4.8 Beyond Economic Repair (BER) or Beyond Repair (BR) i. e. the unit is not capable of being repaired because of the extent of physical damage), or Missing on Induction (MOI), the contractor shall obtain written verification from DCMA and advice from the Inventory Manager whether a SRA may be replaced by one or more of the following options: Ship in place from an existing spares or repair contract, if any, MILSTRIP the SRA(s), otherwise be provided direction for obtaining the SRA(s) at no cost to the contractor.The detailed procedures are set forth in Section 6.0 of the WEB-BASED COMMERCIAL ASSET VISIBILITY (CAV) STATEMENT OF WORK. 3.4.9 B.When not otherwise provided for (or precluded) by other terms of this contract, the contractor may seek written authorization to replace failed SRA(s) with Ready For Issue SRA(s). When authorized, the procedures set forth in paragraph 3.0 of Section 6.2 of the WEB-BASED COMMERCIAL ASSET VISIBILITY (CAV) STATEMENT OF WORK shall be followed. 3.4.10 Over and Above Repair (OAR). An item sent to the contractor shall be considered to require over and above (OAR) repair effort if the repair required is not the type of repair that would be anticipated as a result of normal Navy operation of the item and is not included in the contract pricing due to the nature or scope of the repair needed for that particular item. Therefore, repair of OAR items may be subject to equitable adjustment. The Contractor shall obtain written concurrence from DCMA for all units determined by the contractor to require OAR effort. All such OAR determinations, including the basis for the determination, the repair required, the proposed price to repair and the DCMA written concurrence, shall be provided by the contractor to the PCO prior to undertaking repair of the item. After receipt of the required documentation, the PCO shall provide the contractor disposition instructions or contractual authority for repair of the item. Any ordered disposal shall be performed by the contractor in accordance with all applicable regulations and DCMA disposal procedures and requirements. 3.5 4.0 PARTS AND MATERIALS 3.5.1 General. The contractor is responsible for supplying all parts and material necessary to perform the required repairs under this contract unless parts or material are specifically identified as Government Furnished Material (GFM). All parts and material used in performance of this contract shall be in accordance with the latest approved revision of applicable drawings and specifications and shall be new in accordance with FAR 52.211-5, Material Requirements, which is incorporated by reference herein. Authorization to use other than new material as defined by FAR 52.211-5 requires written approval from the PCO. In addition, cannibalization must be approved by the PCO. Cannibalization of units that have not been inducted is not typically authorized and requires specific approval by the PCO. 3.5.2 The contractor shall ensure it has access for the duration of this contract to updated drawings and specifications for parts and material required for repairs performed under this contract. Any change to such parts/material drawings or specifications requires Government approval in accordance with the Configuration Management provisions of this Statement of Work. Written approval from the PCO must be obtained prior to any change to the manufacturing source or manufacturing facility for all parts which require source approval, unless the contractor is the Design Control Agent (DCA) (i.e. the entity responsible for maintaining the latest configuration data) for the the contract item. If the contractor is the DCA, the contractor may approve approve changes to manufacturing source or manufacturing facility for all parts, including those which require source approval. Any repairs performed using unapproved changes to such drawings, specifications or manufacturing source or facility are done at the contractor's own risk. If the Government disapproves the requested change, the contractor shall replace any delivered items repaired using such unapproved change. The contractor is not entitled to any equitable adjustment to the contract price or terms based on the Government's disapproval of a requested change to the drawings, specifications or manufacturing source or facility. 3.5.3 Purchased Material Control and Parts Control. The contractor shall establish and maintain a system of control over purchased parts and material. Such controls shall, at a minimum, assure that the parts and and material purchased are in compliance with the requirements of this contract. 3.5.4 Receiving Inspection of Purchased Parts and Material. (1)Purchased items shall be inspected upon receipt at the contractor's facility to assure conformance with all requirements of the applicable drawings and specifications or (2)the contractor shall provide prior to the contract award evidence for Government review and approval of a purchased parts and material system which provides for the inspections to assure conformance with all requirements of the applicable drawings and specifications. Evidence of such inspections of such inspections shall be maintained by the contractor or subcontractor for Government review.The inspection report shall, at a minimum, include a record of all dimensional data (coordinate/positional), material, finish, and process with appropriate pass/fail criteria such as certifications and actual dimensonal readings. 3.5.5 ^^^NOTE^^^PART CANNIBALIZATION IS NOT AUTHORIZED UNLESS SPECIFICALLY APPROVED BY NAVSUP WSS AND THE BDE. 3.5.6 3.6 SOURCE AND LOCATION OF REPAIR SOURCE: 3.6.1 The contractor shall specify the name of the Source/Division performing the work and the actual location where work will be performed. CONTROLLER,MOTOR ;NORTHROP GRUMMAN SYSTEMS CORP; Company Name , ;600 GRUMMAN ROAD W BETHPAGE STATE: NY ZIP: 11714-3582; Address , ;26512; Cage Code inspection will be accomplished on the contractor's equipment 3.7 5.0 CONTRACTOR QUALITY REQUIREMENTS: 3.7.1 Quality Program. The Contractor shall establish, implement, document and maintain a quality system that ensures conformance to all applicable requirements of ISO 9001/ SAE AS9100. The Contractor's quality management system/program shall be designed to promptly detect, correct and prevent conditions that adversely affect quality. 3.7.2 Calibration System Requirements. Contractor shall maintain a calibration system that meets the requirements of ANSI/NCSL Z540.3, ISO-10012-1 or an equivalent calibration program acceptable to the Government. 3.8 6.0 CONFIGURATION MANAGEMENT (CM): 3.8.1 The contractor shall maintain a configuration management plan in accordance with the provisions of NAVSUP WSS configuration management clause NAVICPIA18. (Refer to contract). 3.9 7.0 MARKINGS. 3.9.1 Marking shall be as indicated in the contract when applicable. 3.10 8.0 STORAGE; 3.10.1 The contractor shall provide a proper enclosed warehouse environment for both material items awaiting repair and assets which have been repaired and are awaiting shipment to ensure the items are not damaged while being stored. 4. QUALITY ASSURANCE PROVISIONS - NOT APPLICABLE. 5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES - NOT APPLICABLE

More opportunities from Department Of Defense → Navsup Weapon Systems Support

Same awarding agency

NAICS: 336413
New
Federal
15--RADOME - AND OTHER REPLACEMENT PARTS, IN REPAIR/MODIFICATION OF
Solicitation # N0038325RD138
This negotiated request for proposal, issued by Navsup Weapon Systems Support in Philadelphia, establishes a requirement for the repair, overhaul, and testing of various components to support the CV-22 aircraft system. The scope of work includes returning assets to a Ready For Issue condition, specifically targeting items such as radar data processors, inertial navigation systems, radar sets, transmitters, receivers, radomes, infrared detecting sets, and antennas. The contractor is responsible for providing all necessary labor, materials, and tooling, with a strict prohibition on the use of MIL-W-81381 wire in favor of SAE-AS22759 series wire. Performance is measured by Repair Turnaround Times (RTAT) ranging from 86 to 269 days depending on the specific National Item Identification Number. The contractor must utilize the Commercial Asset Visibility system for transaction reporting and the Wide Area Workflow system for invoicing. Quality requirements are stringent, requiring adherence to ISO 9001/SAE AS9100 standards and specific calibration protocols. The government intends to make a single award based on a trade-off where past performance is considered more important than price. Key contractual provisions include strict guidelines for Beyond Economical Repair (BER) determinations, Missing on Induction (MOI) protocols, and adherence to MIL-STD-2073 for packaging and MIL-STD-129 for marking.
Other Aircraft Parts and Auxiliary Equipment Manufacturing

POSTED

1 day ago

DEADLINE

in 13 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS