The U.S. Army Corps of Engineers, Philadelphia District, awarded a Firm Fixed Price Job Order under a Master Ship Agreement for the drydocking and comprehensive repair of the Dredge McFarland. The primary scope of work includes drydocking services, utilities, and full vessel painting from keel to rail. Critical mechanical repairs involve the replacement of overflow and distribution troughs, dredging valve and hopper door repairs, and the overhaul of the controllable pitch propulsion system, which may include the replacement of port and starboard tailshafts. Additional if-directed maintenance includes the replacement of cutlass bearings, flushing of the hydraulic system, and various steel and piping replacements.
A significant portion of the contract supports a major systems upgrade involving the vessel's electrical distribution and dredge controls. This includes the installation of new generator control panels, emergency switchgear modifications, and the integration of an alarm and monitoring system. Technical requirements specify the installation of ION power meters, the removal of automatic dredging consoles, and extensive cabling updates across the engine room, pump room, and upper decks. The project involves rigorous adherence to IEEE and USCG standards, with specific performance periods and technical modifications managed through multiple solicitation amendments to ensure the modernization of the vessel's power and control infrastructure.
HighAI Summary for 080310-2 Rev D Generator Engine Monitoring System Specifications: Technical specifications and component lists for a Generator Engine Monitoring System, including details on winding panels, switch panels, sensor system packages, and power supply outputs for DC/AC systems.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for 080310-3 Engine Monitoring System Cabling Requirements: Technical specifications document detailing the cabling requirements for an Alarm and Monitoring System (AMS). It includes a comprehensive cable schedule with manufacturer details, part numbers, routing (from/to), estimated lengths, and specific installation requirements for sensors and transducers (e.g., Danfoss MBC5000 and PT1000 RTDs) across various engine systems including Port, Starboard, and Center Dredge and Aux engines.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for 333-F245-01 Engine Room New Equipment Locations: Technical drawing and budgeting document detailing new equipment locations in the engine room, locker room, and wash/dry room. Includes plan views for switchboards (Dredge, Ships Service, Decking), coating instructions, and a budgeting sheet for dockering services for the contract period of 01/01/2023 to 31/12/2023.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for 333-F245-02 Winch Room New Equipment Locations: Technical drawing and specification document dated 2022-02-28 (Rev 1) detailing equipment locations for a winch room and wheel towing compartment. It includes clearance height requirements for furniture and walls, interface details for control cabins and cooling tubes, and notes for field verification of dimensions.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for 333-F255-01 Port Dredge Tender Console General Arrangement: Technical drawing package and specifications for the Port Dredge Tender Console General Arrangement under the Dredge McFarland Systems Upgrade Project #802. The document includes a drawing sheet list, anthropometric diagrams, equipment layout, and detailed fabrication notes for the drive/control cabinet foundations, including material thickness (0.1875” HRS sheet) and welding requirements. It is associated with the US Army Corps of Engineers Marine Design Center.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for 333-F490-01 List of Sensors: Technical specification document listing proximity switches and sensors for Trunnion, Ball Joint, and Draghead components. It defines specific limit switches (LS), pressure sensors (PS), rotary encoders (ROT), and inclinometers (INC) required for system operation.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for 333-F501-01 Dredge System Cable Removal Plan: Technical document detailing the Dredge System Cable Removal Plan, specifically focusing on engine room operations, pump and taper configurations, water inlet valve manual operations, and ejection sequences.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for 333-F506-02 Dredge System Power and Control Cabling Interconnection Diagram: Technical cabling interconnection diagram for the Dredge McFarland Systems Upgrade Project 2802, produced by the Department of the Army Marine Design Center. The document includes a drawing index, revision block (Rev P, 02-Apr-10), and detailed cable schedules specifying cable IDs, types, and connection points for motor blower and cooling pump controls.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for 333-F506-03 Dredge Generator Control Panels: Technical drawing package and Bill of Materials (BOM) for the Dredge McFarland Systems Upgrade Project #2802. The document includes schematic diagrams, mechanical layout plans, and component lists for port, center, and starboard generator control panels, dated February 18, 2010.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for 333-F506-07 Dredge Pumpout Control Station: Technical design package for the Dredge Pumpout Control Station (DWG NO. 333-F506-07) as part of the Dredge McFarland Systems Upgrade Project for the US Army Corps of Engineers. The document includes a Bill of Materials (BOM), mechanical layout drawings, electrical schematic diagrams for digital inputs/outputs, and ET200M rack layouts. Dated February 18, 2010, and produced by Ockerman Automation Consulting, Inc.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for 333-F715-01 Circuit Breaker Coordination Study: Technical coordination study and short circuit analysis for the Dredge McFarland Systems Upgrade (Project 2802) electrical power system. Prepared by Ockerman Automation Consulting, the document includes one-line diagrams, fault current calculations using SKM software, and recommended circuit breaker settings for ship service and emergency distribution systems.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for 333-F720-01 Ship Service Electrical Distribution System One Line Diagrams: Technical one-line diagrams and specifications for the Ship Service Electrical Distribution System on the US Army Corps of Engineers Dredge McFarland Systems Upgrade Project. Dated August 31, 2009, the document includes electrical symbols, notes on generator ratings (700kW, 450V), circuit breaker requirements, and detailed bus layouts for the main 450V switchboard.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for 333-F720-053 Emergency Switchgear One-Line Diagram: Technical one-line diagrams and specifications for the emergency electrical distribution system on the Dredge McFarland, part of the US Army Corps of Engineers systems upgrade project. Dated August 31, 2009, the document includes 450V and 120V emergency switchboard layouts, generator ratings (150KW), and technical notes regarding fault current analysis, voltage drop limits, and cable standards (IEC 60092-353/IEEE Std-45).
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for 333-F725-01 Aux Switchgear Power and Control Cabling Interconnection Diagram: Technical interconnection diagram for auxiliary switchgear power and control cabling, detailing common circuits for generators and point-to-point cable connections.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for 333-F735-01 Local Engine Panels: Technical specifications and drawings for Local Engine Panels under project/part number 333-F735-01. The document contains detailed engineering requirements and component layouts.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for 333-F740-02 Dredge Switchboard General Arrangement: Technical drawing package and general arrangement for the Dredge Switchboard for the USACE Hopper Dredge McFarland (CEMDIC-2802). The document includes a drawing sheet list, general design notes, and detailed specifications for switchgear cabinets, foundations, and drip-pans, referencing IEEE and USCG standards.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for 333-F740-02 Emergency Switchgear Modifications - Scottish Gas Pipeline: Technical drawing and specification document for the Scottish Gas Pipeline (Three Side) project, specifically regarding emergency shoeboard and switchgear modifications. The document includes general notes on dimensions, architectural coordination, and technical specifications for the Scottish Pipeline Training Centre.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for 333-F740a-01 Aux Switchboard General Arrangement: Technical specifications and general arrangement drawings for an auxiliary switchboard and ship's service equipment. The document includes general notes on shipping and inspection, financial terms for tenders (dated 2023), equipment layouts for locker compartments and electrical rooms, and detailed door panel equipment layouts with electrical ratings and dimensions.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for 333-F798-01 UPS System Cabinets: Technical drawing and Bill of Materials (BOM) for UPS System Cabinets for the USACE Hopper Dredge McFarland (CEMOC-28002). The document includes general design notes, a drawing sheet list (SHT 01-17), and manufacturing specifications requiring compliance with IEEE Standard 45, IEEE-142, and IEEE-518. It specifies contractor responsibilities for final design, heat load calculations, and grounding.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for 9-7-38 Transverse WT Bulkhead 48: Technical specification document containing parameters and data tables for a Transverse WT Bulkhead 48. The content consists of a detailed parameter list and alphanumeric data strings related to technical components.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for 9-7-517 Cable Racks - Boat and Upper Deck Aft: Technical specification document for cable racks on the boat and upper deck aft, specifically referencing part/component SC1011/12 BALL-POLY.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Arrangement of Dragshack - Technical Drawings: Technical drawing specifications and general notes for the 'Arrangement of Dragshack'. The document contains multiple sections (C-C, E-E, E-E-B, E-E-C) focusing on dimension verification requirements prior to and after fabrication and finishing.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Cable Racks - Engine and Generator Room Upper Levels: Technical specifications document detailing requirements for cable racks in engine and generator room upper levels, including details on digital signal processor I/O ports and power supply unit (PSU) components.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Cable Racks - Engine Generator and Aux Mach Rooms Lower Levels: Technical data table containing numerical values and categories related to cable racks for engine generator and auxiliary machinery rooms on lower levels.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Cable Racks - Forecastle and Upper Decks Forward: Technical specification document detailing positional data and base measurements for cable racks located on the Forecastle and Upper Decks Forward. The document contains tabular data regarding positions and base coordinates.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for CABLE RACKS - PUMP ROOM AND MOTOR ROOM HOLD LEVEL: Technical specification or data table regarding cable racks for pump and motor rooms, containing coordinate or positional data. The document appears to be a technical drawing or specification sheet based on the filename and numerical data provided.
PDF
PDF, High priority: read this firstcontract-document
HighAI Summary for Contract 5/1/2/1/1 - Existing Aux Switchgear: A technical contract document dated January 22, 1973, from Westinghouse Electric Corporation (UK) Ltd. The document specifies a 'Water Tight Contract' (No. 5/1/2/1/1) including a bill of materials for water inlet and outlet valves, and technical sections (A-A through D-D) detailing oil filters, coolers, main switchgear, transformer tanks, and control room wiring.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Dredge McFarland Systems Upgrade Project #2812A - Electrical Distribution One Line Diagrams: Technical electrical distribution one-line diagrams and specifications for the Dredge McFarland Systems Upgrade Project #2812A. Issued for review on August 31, 2009, by Ockerman Automation Consulting, Inc. for the US Army Corps of Engineers. The document includes generator ratings (1500kW, 533V), pump motor specifications (2800HP, 720V DC), and critical electrical installation notes regarding voltage drop, cable standards (IEC 60092-353/IEEE Std-45), and circuit breaker ratings.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Electric Load Monitoring Panel - 9-7-2519: Technical document containing sketches and views for an Electric Load Monitoring Panel, including 2-D and 3-D room layouts with door and window placements.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Engine Starting & Monitoring Console Specifications: Technical specifications and dimensions for four types of engine monitoring and workstation panels: Dredge Engine Monitoring, Dredge Engine Workstation, Aux Engine Workstation, and Aux Engine Monitoring.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Foundations for Jetting Pumps - Technical Data: Technical document containing electrical resistance parameters (R0-R17) and alphanumeric coding related to foundations for jetting pumps.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Jetting Water and Hopper Washdown System Plans, Sections, and Elevations: Technical drawing and specification document detailing the plans, sections, and elevations for a Jetting Water and Hopper Washdown System. It includes general notes regarding concrete materials, pipe sizes, and manufacturer specifications for containers and tolerances.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Variable Speed AC Motors - Dragarm Hoist Motor Specifications: Technical specification sheet for variable speed alternating current (AC) motors, specifically detailing enclosure types, cooling methods, mounting, and frame dimensions (L4429 through L4473) for drive end shifts and keys.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for W912BU-10-R-0033 Amendment 0001 - McFarland Overhaul: Amendment 0001 to solicitation W912BU-10-R-0033, issued July 10, 2010, by the US Army Engineer District, Philadelphia. This amendment clarifies vessel visit dates and times and replaces technical specification MAINT-301 with MACH-301 regarding electrical improvements for the Dredge McFarland. Key updates include requirements for removing old equipment, installing new GFE (Government Furnished Equipment), cabling, and coordination with GFE suppliers, as well as safety requirements for temporary lighting and lead-based paint handling.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for W912BU-10-R-0033 Amendment 0002: Amendment 0002 to solicitation W912BU-10-R-0033, issued by the US Army Engineer District, Philadelphia on July 12, 2010. Key changes include increasing the quantity for CLIN 0001AC from 75 to 90 days, updating the total performance period in Section L-1 to 90 calendar days (approx. Sept 7 to Dec 6, 2010), and correcting terminology in Section C by replacing 'MANT-' with 'MACH-'.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for W912BU-10-R-0033 Amendment 0003: Amendment 0003 to solicitation W912BU-10-R-0033, dated July 15, 2020. This modification updates Section B and Section C to change the scope of work from the relocation of the starboard jetting pump to the relocation of the port jetting pump (CLIN 0001DF) for MDC Project 2802. It includes updated technical specifications and reference drawings for the fabrication and installation of a removable steel foundation and platform.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for W912BU-10-R-0033 Amendment 0004: Amendment 0004 to solicitation W912BU-10-R-0033, issued on July 22, 2010, by the US Army Engineer District Philadelphia. The amendment extends the response deadline from August 9, 2010, to August 17, 2010, and provides instructions for additional site visits to the vessel 'Dredge McFarland'.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for W912BU-10-R-0033 Amendment 0005: Amendment 0005 to solicitation W912BU-10-R-0033, issued by the US Army Engineer District, Philadelphia on August 9, 2010. The amendment extends the response deadline from August 17, 2010, to September 9, 2010, and modifies the period of performance to begin on or about December 1, 2010, for a duration of 90 calendar days. The procurement is for a Firm Fixed-Price Job Order for drydocking and repairs to the Dredge MCFARLAND.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for W912BU-10-R-0033 Amendment 0006: Amendment 0006 to solicitation W912BU-10-R-0033, issued on August 21, 2010, by the US Army Engineer District, Philadelphia. This document provides a summary of changes to the line item descriptions in Section B (Supplies or Services and Prices), specifically adding new CLINs including 0001FK (MACH-933 Rebuild Bilge Manifolds) and 0001FL (HULL-910 Inspect Port and Starboard Rudder Bearings).
PDF
PDF, High priority: read this firstamendment
HighAI Summary for W912BU-10-R-0033 Amendment 0007: Amendment 0007 to solicitation W912BU-10-R-0033, issued on September 3, 2010, by the US Army Engineer District, Philadelphia. The amendment extends the response deadline to October 5, 2010, and modifies the technical specifications and Statement of Work (SOW) for CLIN 0001DD regarding MACH-301 vessel modifications. Key technical changes include the installation of ION power meters, removal of automatic dredging consoles, replacement of circuit breakers in main and emergency switchgear, and installation of TNIU-133 cabling.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for W912BU-10-R-0033 Amendment 0008: Amendment 0008 to solicitation W912BU-10-R-0033, issued by the US Army Engineer District Philadelphia on September 23, 2010. This amendment provides an additional period for prospective offerors to conduct a site visit of the vessel 'Dredge McFarland' at Dockside FT Mifflin, Philadelphia, PA, between September 23 and October 1, 2010.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for W912BU-10-R-0033 Amendment 0009: Amendment 0009 to solicitation W912BU-10-R-0033, issued by the US Army Engineer District, Philadelphia on September 28, 2010. The primary purpose of this amendment is to extend the offer response date and time from October 5, 2010, at 3:00 PM to October 19, 2010, at 3:30 PM.
PDF
PDF, High priority: read this firstrfp
HighAI Summary for W912BU-10-R-0033 Overhaul of Dredge McFarland: Solicitation W912BU-10-R-0033 issued on July 7, 2010, by the US Army Engineer District, Philadelphia. The procurement is for the overhaul of the Dredge McFarland, including drydocking, blasting, painting, and steel work. The document includes a detailed CLIN structure for Firm Fixed Price (FFP) and 'if-directed' work items.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Welded Foundation Data: Technical foundation data sheet titled "Welded Foundation Data". It provides general notes on liner thickness, overlap requirements, bracket thickness guidance, and provisions for drip pans for oil pump foundations. The document also includes a dimensional table referencing bottom diameter and related foundation/material callouts, indicating this is a design/specification reference rather than a solicitation or award.
PDF
PDF, Low priorityother
LowAI Summary for 9-7-515 Cable Racks - Fan Upper and Bridge Decks: Unreadable document.
PDF
PDF, Low priorityother
LowAI Summary for 9-7-518 CABLE RACKS - MAIN DECK: The document content consists of a table of alphanumeric coordinates and characters, which does not provide legible procurement details, specifications, or instructions. It appears to be a corrupted or non-textual data export.
PDF
PDF, Low priorityspecifications
LowAI Summary for Dragarm Winch Motor Outline and Data: Technical outline/data sheet for a dragarm winch motor. The provided content appears heavily corrupted or OCR-noisy and does not reveal readable procurement instructions, pricing, or submission requirements. Based on the filename, it is likely a component specification or outline drawing reference for the motor.
PDF
PDF, Low priorityother
LowAI Summary for General Arrangements and Replacement Plans: Mixed-content engineering drawing/reproduction document labeled "GENERAL ARRANGEMENTS" with multiple page splits and fragments referencing ship or plant deck layouts, equipment locations, replacement plans, revision notes, and drawing metadata (dates, plan numbers, scale, approvals). It appears to be a general arrangements drawing package rather than a procurement solicitation or contract award.
PDF
PDF, Low priorityspecifications
LowAI Summary for Jetting System Modifications - Sheet 1 of 4: Engineering drawing sheet titled "Jetting System Modifications," Sheet 1 of 4. The page appears to show a key plan, total square miles, approximate boredge square miles, and references to other plates/billets, along with a detail note for a concrete pipe section. No solicitation, award, or contract terms are present.
PDF
PDF
AI Contract Breakdown
Uniform Contract Format
Contract not broken down yet
CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.
Timeline
19 updates
PhaseAwarded
Posted
Presolicitation
Notice updated
Response deadline changed from Jul 16, 2010 to Jul 28, 2010. The notice description changed. The point of contact changed.
Notice updated
Response deadline changed from Jul 28, 2010 to Aug 9, 2010. The notice description changed.
Notice updated
Notice details unchanged. Attachments may have changed.
Notice updated
Notice details unchanged. Attachments may have changed.
Notice updated
Notice details unchanged. Attachments may have changed.
Notice updated
Notice details unchanged. Attachments may have changed.
Notice updated
Notice details unchanged. Attachments may have changed.
Notice updated
Notice details unchanged. Attachments may have changed.
Notice updated
Notice details unchanged. Attachments may have changed.
Deadline changed
Response deadline changed from Aug 9, 2010 to Aug 17, 2010.
Deadline changed
Response deadline changed from Aug 17, 2010 to Sep 9, 2010.
Notice updated
Notice details unchanged. Attachments may have changed.
Deadline changed
Response deadline changed from Sep 9, 2010 to Oct 5, 2010.
Notice updated
Notice details unchanged. Attachments may have changed.
Deadline changed
Response deadline changed from Oct 5, 2010 to Oct 19, 2010.
Notice updated
Response deadline changed from Oct 19, 2010 to Nov 4, 2010. The notice description changed.
Notice updated
The notice description changed.
Deadline changed
Response deadline changed from Nov 4, 2010 to Nov 30, 2010.
Notice updated
Notice details unchanged. Attachments may have changed.
Type Changed
Presolicitation → Solicitation
Awarded
Contract was awarded
Submission Closed
Find active opportunities like this
Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.
Organization & Contact Information
Show more
AgencyDepartment Of Defense → W2SD Endist Philadelphia
The U.S. Army Corps of Engineers, Philadelphia District, awarded a Firm Fixed Price Job Order under a Master Ship Agreement. The U.S. Army Corps of Engineers, Philadelphia District award is for the contractor to provide, Drydocking and Repairs to the Dredge MCFARLAND. The general elements of work include, but are not limited to: a. Drydocking, utilities and services; painting of vessel from keel to rail, overflow and distribution troughs replacement, dredging valve repairs, hopper door repairs, controllable pitch propulsion (CPP) system repairs, including possible replacement of the P & S tailshafts. b. Provide services to support an upgrade of the vessel's electrical system and dredge controls which will be performed during this availability. c. If-Directed items which include the replacement of the cutlass bearings and flushing of the CPP hydraulic system, and other miscellaneous maintenance, including steel and piping replacement, as required.
More opportunities from Department Of Defense → W2SD Endist Philadelphia