Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Sources Sought opportunity from Department Of Veterans Affairs was posted on August 29, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

J041--Chiller Plant Maintenance - Louis Stokes Cleveland VAMC

Closed
36C25026Q0018Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 811310
New
Kubota M8200 Clutch Replacement
Solicitation # kubota-m8200-clutch-replacement
Management and Training Corporation is soliciting lump sum fee proposals for the clutch replacement of a Kubota M8200 tractor with front wheel assist, located at the Earle C. Clements Job Corps Center in Morganfield, Kentucky. The scope of work requires a qualified contractor to provide all transportation, labor, materials, and equipment to diagnose and repair the clutch assembly and power take-off system. Key technical requirements include replacing friction discs, bearings, oil seals, and O-rings, resurfacing the flywheel, and replacing hydraulic pipes and filters as needed. The contractor must perform all work according to manufacturer specifications and provide a final summary of diagnostic findings, an itemized list of replaced parts, and warranty documentation upon completion. This solicitation is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified entities. Bids must be submitted via email to Angie Mahoney by 3:00 PM CST on November 3, 2026, and must include a bid sheet, proof of insurance, a completed supplier packet with a W-9, and applicable SBA certification letters. Award decisions will be based on best value, with a focus on administrative compliance and technical qualifications. The contract is subject to various Federal Acquisition Regulations, including standards for combating trafficking in persons, Buy American restrictions, and Service Contract Labor Standards per Wage Determination 2015-4687 Revision 31 for Kentucky.
Earle C. Clements Job Corps Center

POSTED

about 3 hours ago

DEADLINE

in 5 days
NAICS: 811310
New
SLED
RFP 07-135 Roseville Electric Utility – Air Compressor Maintenance
Solicitation # 07-135
The City of Roseville is soliciting proposals under RFP 07-135 for a consultant to provide comprehensive scheduled preventive and corrective maintenance for air compressors and auxiliary systems, including Ingersoll Rand equipment. The services will be performed at the Roseville Energy Park and Sunset Energy Center in California. The selected consultant will be responsible for providing all necessary labor, technical expertise, specialized tooling, and materials. This is a prevailing wage project with an initial contract duration of five years, estimated to commence in April or May. Proposals must be submitted by December 16, 2026, via email to the City Clerk or through physical delivery in a sealed container with the required Attachment H label. The award will be based on a formal evaluation panel process considering the firm's experience and qualifications (25 points), the proposed project plan (35 points), and cost (40 points), with potential interviews for top candidates. Requirements for the successful bidder include obtaining a City of Roseville business license, providing 100% faithful performance and labor and materials bonds, and maintaining specific insurance policies. Consultants must also disclose any conflicts of interest and adhere to the Levine Act regarding political contributions.
City of Roseville

POSTED

about 6 hours ago

DEADLINE

in about 2 months
NAICS: 811310
New
SLED
Roseville Electric Utility – Gas Compressor Maintenance
Solicitation # 07-137
The City of Roseville is soliciting proposals for Gas Compressor Maintenance Services to support the Roseville Energy Park and the Roseville Energy Center and RPEAK. The selected contractor will provide all labor, supervision, technical expertise, specialized tooling, equipment, and materials necessary for both scheduled preventive and corrective maintenance on natural gas compressors, specifically Gas Packagers and Ariel models, and their associated auxiliary systems. The contract is intended to run for an initial term of five years, with services estimated to commence in April or May. This is a prevailing wage project requiring adherence to all fair employment laws, with certified payroll required for contracts exceeding 25,000 dollars. The successful proposer must provide a 100 percent Faithful Performance Bond and a 100 percent Labor and Materials Bond. Proposals are due by December 17, 2026, and must include a Proposer’s Certification, a Non-collusion Declaration, a Levine Act Disclosure Statement, and proof of active registration with the California Secretary of State. Award will be made to the responsible proposer determined to be the most advantageous to the City through a formal evaluation panel process. Invoicing is to be submitted monthly, delineated by task and personnel, with payment terms set at 30 days following receipt of satisfactory services.
City of Roseville

POSTED

about 6 hours ago

DEADLINE

in about 2 months

General Info

NAICS

811310 - Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance

Place of Performance

Department of Veterans Affairs Louis Stokes Cleveland VA Medical Center 10701 East Blvd, Cleveland, OH, 44106-1702, USA

Set-Aside

NONE

Documents

1

Chiller Plant Maintenance - Louis Stokes Cleveland VAMC

DOCX, Low prioritysources-sought
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Sources Sought

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Veterans Affairs → 250-NETWORK Contract Office 10 (36C250)
Contacts1 person available
OfficeDAYTON, OH, 45428, USA
Office AddressDAYTON, OH, 45428, USA
Contacts
Chad KemperContracting Officer

Full Description

Show more
Sources Sought Notice Page 4 of 4 *= Required Field Sources Sought Notice Page 1 of 4 Department of Veterans Affairs Sources Sought Notice Chiller Plant Maintenance Louis Stokes Cleveland VA Medical Center This is a Sources Sought notice and not a request for quotes. This request is solely for the purpose of conducting market research to enhance VHA s understanding of the market s offered products, services and capabilities. The Government will not pay any costs for responses submitted in response to this Sources Sought. The Department of Veterans Affairs (VA), VA Healthcare System, Network Contracting Office (NCO) 10, on behalf of Louis Stokes Cleveland VA Medical Center in Cleveland, Ohio, is conducting market research through this sources sought notice to seek sources that can provide Chiller Plant Maintenance and Services for the Louis Stokes Cleveland VA Medical Center. The NAICS Code for this acquisition is 811310, size standard of $12,500,000. The product service code is J041. The contracting office is contemplating award of a Firm-Fixed-Price contract for this service. This Sources Sought notice provides an opportunity for respondents to submit their notice of ability, and their available services in response to the requirement described below. Vendors are being invited to submit information relative to their potential of fulfilling the requirement below, in the form of a capability response that addresses the specific requirement identified in this Sources Sought. Pursuant to FAR Part 10, Market Research, the purpose of this notice is to determine if sources capable of satisfying the agency's requirements exists and to determine the commercial practices of company's engaged in providing the needed service. Pursuant to FAR Part 6 and FAR Part 19, competition and set-aside decisions may be based on the results of this market research. This notice in no way obligates the Government to any further action. This is a "REQUEST FOR INFORMATION" only. Requests for a solicitation will not receive a response. DESCRIPTION The Louis Stokes VA Medical Center located at 10701 East Blvd, Cleveland, Ohio 44106 is seeking a qualified contractor to provide all labor, materials, equipment, transportation, and supervision necessary to provide full-service, on-site Chiller Plant Maintenance to maintain and service all chillers, pumps, cooling towers, VFDs, and building automation controls necessary to cool and de-humidify the Medical Center for the health and safety of our patients, staff, medical equipment and visitors. GENERAL REQUIREMENTS Please provide the requested information with any responses: 1. Company Name and POC information. 2. SAM.gov UEI number. 3. GSA contract number if these services are offered on Federal Supply Schedule. 4. Socioeconomic category (SDVOSB, VOSB, WOSB, 8a, Small Business or Large Business). If this contract is set-aside, it will be subject to the Limitations on Subcontracting rules per FAR 52.219-14, 13 CFR 125.6 and VAAR 852.219-75. 5. Please provide a capability statement that addresses the organization s qualifications and ability to perform as a contractor for the work described below. 6. Statement ensuring any licenses, insurances, training, certifications, or special accommodations necessary to perform this task will be met. If there are specific requirements, please provide rationale. 7. Any questions, comments, or concerns, that may otherwise assist us. RESPONSE COMMITMENT Please send all inquiries to: contact@example.gov. Phone calls will not be accepted. Eligibility in participating in a future acquisition does not depend upon a response to this notice. ?.## STATEMENT OF WORK (SOW) Contract Title Chiller Plant Maintenance Background The Louis Stokes VA Medical Center located at 10701 East Blvd, Cleveland, Ohio 44106 is seeking a qualified contractor to provide all labor, materials, equipment, transportation, and supervision necessary to provide full-service, on-site Chiller Plant Maintenance to maintain and service all chillers, pumps, cooling towers, VFDs, and building automation controls necessary to cool and de-humidify the Medical Center for the health and safety of our patients, staff, medical equipment and visitors. Scope The vendor shall supply all labor, materials, equipment, clean up, transportation, and supervision necessary to perform all full-service, on-site maintenance, repairs, and replacement as scheduled and needed to the chiller plant chillers, cooling towers, pumps and any auxiliary equipment located at Louis Stokes Cleveland VA Medical Center to maintain the equipment in full operational status. This will include all equipment listed in Parts One, Two, Three, Four and Five. Vendor will have documented certified technicians and the ability to provide repair and replacement parts. The Louis Stokes Cleveland VA Medical Center is expecting to add an additional/new chiller during Fiscal Year 2026. The new Chiller will be added to the scope of the contract. Specific Tasks See equipment list and maintenance description below: 5.1. Task 1: Part One - Centrifugal Chillers NUMBER MFG MODEL TONS/ OUTPUT CH-I TRANE CVHF128NA 1,200 4160V CH-2 TRANE CVHF128NA 1,200 4160V CH-3 TRANE CVHF128NA 1 ,200 4160V CH-4 TRANE CVHF1280 1,200 480V CH-5 TRANE CVHF13DFA 1,200 480V 5.1.1. Requirements for Centrifugal Chillers and Rotary Chillers: ANNUAL Maintenance Once a year, thorough preventative maintenance will be performed, including the following: Furnish oil filters and gaskets as required. Pressure test as required using system pressure. Repair any leaks. Provide refrigerant leak reports to owners as required by EPA guidelines. Detailed inspection of purge system and thorough cleaning of purge compressor, purge oil separator, purge drum. Detailed inspection of purge system to include control circuit diagnostics, purge tank checkout and water removal, replace filter drier cores and clean the air-cooled condenser, if applicable. Check the condition of contacts for wear, pitting, etc. Check and calibrate safety controls, including all transmitters, flow meters, and all other monitoring devices. Meg compressor motor and oil pump. Check main starters and perform recommended testing (this includes all the chillers). Check the main starters, tighten all starter terminals, and check contacts for wear. Check overloads. Tighten motor terminals and control panel terminals. Clean oil strainer, replace filter and gasket where required. Tighten oil heater leads. Check operation of vane position. Take oil sample and have analyzed for acid, moisture, and wear metal content. Change oil when so indicated by oil analysis unless done on annual schedule. Provide yearly recommended maintenance on refrigerant monitor along with calibration test, if applicable. Report any noted deficiencies. Monthly Maintenance: Monthly inspections to be made during the operating season, to include the following: Adjust operating and safety controls. Record settings. Complete operating log of temperatures, pressures, and voltages. Change oil in purge vacuum pumps when required. Check operation of purge system. Check operation of control circuit. Check operating of lubricant system including oil pump and oil pressure regulator. Check operation of motor and starter. Check customer log with the operator, discuss operation of the machine generally. Report to operator any uncorrected deficiencies noted. Make operating log of temperatures, pressures, voltages, amperages, etc. Check and adjust operating and safety controls. Check operation of oil reservoir sump heater. Check oil level and add as required. Check operation of control circuit. Check operating log with operator, discuss operation of the machine generally. Check operation of motor and starter. Seasonal Start Up The contractor will advise regarding the start of the month. 1. Test motor (Meg). 2. Start the machine, check controls, and calibrate. 3. Complete operating log and record settings monthly. 4. Check refrigerant and oil levels. 5. Check purge operation. 6. Check starter operation, voltage, and current. Set up operating log with operator, instruct, and advise troubleshooting techniques. Analysis Services Various diagnostic tests are to be performed depending on equipment duty and type. Reports with interpretation and recommendations are to be included. 1. Oil sample and analysis for wear metals, acid content, and moisture. Sample to be taken two (2) times per year. 2. Refrigerant analysis for acid and moisture content (as required). Annual Operator Training Training of operators or building engineers on the equipment covered, if required. 1. Eight (8) hours of training per year for every boiler plant employee, up to 16 employees. 2. Any un-utilized training costs will be reimbursed. Parts Replacement All parts needed to replace failed components on non-covered equipment will be offered at a discount percentage (30%). This does not include materials or components, such as refrigerant, oil, and other materials the contractor will provide to perform maintenance and repairs as emergencies or scheduled under annual maintenance, monthly maintenance, seasonal start up and analysis services. Any parts, repairs, and/or maintenance outside of the standard maintenance that will require additional charges must be discussed with the COR and CO prior to any work being done. All additional charges will require a new purchase order to be issued. Work done without a purchase order will be assumed to be covered by the Vendor. Only the CO can obligate funding. Written Reports: Provided to customer representative following each regular inspection or emergency call. 5.2. Task 2: Part Two Trace Automation & Controls 5.2.1. Requirements for Tracer Automation Equipment Main Plant and Process Chiller Plant: A. Contractor will provide full-service coverage for regular systematic maintenance and parts, materials and labor for repairs, including all software support, defects in materials or manufacture, or due to normal wear and tear. B. Contractor will provide and install any new operational software and/or graphics with the latest revisions over the course of the contract. C. Unit maintenance and repair/replacement of PCs, Monitors, UPSs and associated equipment will be the liability of the contractor over the duration of the contract with no additional cost. D. Scheduled maintenance includes diagnosis of system performance, inspection, cleaning, adjustments, and other procedures as required by specifications according to system use and configuration. Semi-Annual Preventative Maintenance Maintenance/repair or replacement if required of the Building Automation Systems. Includes all operated valves, programming panels, BCU s, Tracer Output/Input panels and workstations associated with Energy Center equipment and operations, to include the following: Master Station Check the operating environment and clean the console. Check and clean the central processing unit and record input voltage. 2. If necessitated by operational difficulties, run system diagnostics. Contractor will provide and install any new operational software and/or graphics with the most current version at no cost over the course of the contract. 3. Clean and maintain BCU modules in both the Penthouse and Ambulatory Care. 4. Check and clean CRTs and Printers. 5. Perform complete system backup. 6. Remote Stations and Field Hardware: Verify regulated power assembly and battery voltages, adjust as required. Inspect cabinet at earth ground potential. Verify proper system electrical ground isolation. Inspect interconnecting cables and electrical connections. Via terminal exercise-controlled devices with manual command functions and verify proper response of connected field hardware. Check for alarms and overrides. Note specific alarm and override conditions for review with the owner personnel. Clean external surfaces of the panel enclosure and associated field equipment units. Review system performance with Medical Centers designated contact. Discuss specific parameter changes implemented as required. Inspect interior surfaces and components of the panel enclosure and associated field equipment. Ensure all mounted devices add plug in components are securely in place. Evaluate binary and analog points for proper operation and reporting Perform a general performance review of all points. Check individual critical points. Determine new or revised calibration coefficients as required. Record any parameter values which are different than those shown on program listings. ANNUAL OPERATOR TRAINING The contractor will provide up to eight (8) hours of Tracer Summit on-site customer training, if requested. WRITTEN REPORTS Provided written reports to COR following each regular inspection or emergency call. 5.3. Task 3: Part Three Chill Water/Tower Water Pumps, & Drives NUMBER MFG MODEL SERVICE CWP-I WEINMAN 444TT CHILLED WATER 2400GPM 150HP CWP-2 WEINMAN 444TT CHILLED WATER 2400GPM 150HP CWP-3 WEINMAN 444TT CHILLED WATER 2400GPM 150HP CWP-4 WEINMAN 444TT CHILLED WATER 2400GPM 150HP CWP-5 PACO 444TT CHILLED WATER 2400GPM 150HP CWP-6 PACO 444TT CHILLED WATER 2400GPM 150HP VFD CWP-1 DANFOSS/ GRAHAM VLT6000H190 CHILLED WATER 480V VFD CWP-2 DANFOSS/ GRAHAM VLT6000H190 CHILLED WATER 480V VFD CWP-3 DANFOSS/ GRAHAM VLT6000H190 CHILLED WATER 480V VFD CWP-4 HONEYWELL SMART VFD HVFDSD3C1500G100 CHILLED WATER 480V VFD CWP-5 EATON CFX9000 CHILLED WATER 480V VFD CWP-6 EATON SVX9000 CHILLED WATER 480V TWP-I WEINMAN 12L2 TOWER WATER 3600GPM 100HP TWP-2 WEINMAN 12102 TOWER WATER 3600GPM 100HP TWP-3 WEINMAN 12L2 TOWER WATER 3600GPM 100HP TWP-4 WEINMAN 12L2 TOWER WATER 3600GPM 100HP TWP-5 PACO KP8012-56 TOWER WATER 3600GPM 100HP TWP-6 PACO 8012 TOWER WATER 3600GPM 100HP VFD-TWP-1 DANFOSS/ GRAHAM MCD3075 TOWER WATER 480V VFD-TWP-2 DANFOSS/ GRAHAM MCD3075 TOWER WATER 480V VFD-TWP-3 DANFOSS/ GRAHAM MCD3075 TOWER WATER 480V VFD-TWP-4 EATON SVX9000 TOWER WATER 480V VFD-TWP-5 EATON CFX9000 TOWER PUMP 480V VFD-TWP-6 EATON SVX9000 TOWER PUMP 480V 5.3.1. Requirements for all Chill-Water, Tower/Condenser Water Pumps: Monthly Maintenance Monthly inspections to be made during the operating season, to include the following: 1. Lubricate pump bearings per manufacturer s recommendations. 2. Lubricate motor bearings per manufacturer s recommendations. 3. Check the suction and discharge pressures. 4. Check packing or mechanical seal and adjust as necessary. 5. Check motor voltage and amperage. SEASONAL START UP 1. Clean pump strainers. 2. Lubricate pump bearings per manufacturer s recommendations. 3. Lubricate motor bearings per manufacturer s recommendations. 4. Tighten all nuts and bolts. Check motor mounts and vibration pads. 5. Visually check pump alignment and coupling. 6. Check motor operating conditions. 7. Inspect electrical connections and contractors. 8. check mechanical seals or pump packing. 9. Operate pumps and check efficiency. PARTS REPLACEMENT All parts or failed components of the equipment needed to be replaced will be provided by the vendor/contractor. This includes all materials or components, such as refrigerant, oil, and other materials the Contractor will provide to perform maintenance and repairs as scheduled under monthly maintenance and seasonal start up. Any parts, repairs, and/or maintenance outside of the standard maintenance that will require additional charges must be discussed with the COR and CO prior to any work being done. All additional charges will require a new purchase order to be issued. Work done without a purchase order will be assumed to be covered by the Vendor. Only the CO can obligate funding. WRITTEN REPORTS Provided to customer representative following each regular inspection or emergency call. 5.3.2. Requirements for Adjustable or Variable Frequency Drives ANNUAL MAINTENANCE: Once a year a thorough preventative maintenance schedule will be performed including the following: Base year initial base line reading of all VFDs will be provided in written report and subsequent yearly reports will be provided. Remove all debris, dust, or residue material from the drive enclosure. Clean printed circuit boards with an approved cleaner or small brush. Inspect for any lose plugs or ribbon cables. Inspect for any damaged or missing items. Look for any overheated or charred components. Look for discolored components, smudges, or smoke residue. Tighten all connections. Inspect cooling fans for proper operation and change filters quarterly. Check the continuity of all control circuit fuses. Perform diode test of the diode bridges. Perform continuity check of Debus and bus caps. Perform diode test of transistors. Check and record AC line voltage. Check and record motor output lead voltage for balanced supply. Check and record Debus voltage. Compare data with previous tests to expose degradation of components. PART REPLACEMENT All parts needed to replace failed components of the equipment will be provided by the contractor. This includes all materials or components, such as refrigerant, oil, and other materials the Contractor will provide to perform maintenance and repairs as scheduled under annual maintenance. Any parts, repairs, and/or maintenance outside of the standard maintenance that will require additional charges must be discussed with the COR and CO prior to any work being done. All additional charges will require a new purchase order to be issued. Work done without a purchase order will be assumed to be covered by the Vendor. Only the CO can obligate funding. 5.4. Task 4: Part Four Cooling Towers, Cooling Tower Fan Drives, Semi-Annual Tower Cleaning, & Disinfection NUMBER MFG MODEL TONS MOTOR CT-I EVAPCO REP 224-018 1200TONS 2CELLS CT-2 EVAPCO REP 224-018 1200TONS 2CELLS CT-3 EVAPCO REP 224-018 1200TONS 2CELLS CT-4 EVAPCO REP224-118 1200TONS 2CELLS CT-5 EVAPCO AT224-118 1200TONS 2CELLS VFD-CT-I HONEYWELL SMART VFD HVFOSD306005100 COOLING TOWER FANS 30 60HZ VFD-CT-2 DANFOSS/ GRAHAM VLT6000 COOLING TOWER FANS 30 60HZ VFD-CT-3 DANFOSS/ GRAHAM VLT6000 COOLING TOWER FANS 2 @ 30EA 60HZ VFD-CT-4B EATON CFX9000 COOLING TOWER FAN 1 30HZ VFD-CT4A HONEYWELL NXS0300A1001 COOLING TOWER FAN 1 30HZ VFD-CT-5 EATON SVX9000 FANS 2 60HZ 5.4.1. Requirements for Cooling Towers/Fluid Coolers MONTHLY MAINTENANCE Monthly inspections are to be made during the operating season, to include the following: Inspect the fan, motor, and belt. Check the oil level and add oil as needed. Check the intake strainer on cooling towers. Check operating conditions. Adjust as required. CLEANING & DISINFECTION PROCESS To be completed in early Spring (March/April) and late Fall (October/November) dependent on weather conditions and scheduled through the COR. The following stages highlight the general approach for cleaning and disinfection of cooling water systems. Certain modifications may be required depending on system access, design, operation or the like. All stages in the clean and disinfection process shall require assistance from the Customer such as the operation engineer who is familiar with the system. All supplies and PPE will be contractor supplied. Proper LOTO will be utilized as needed. Stage I Pre-Clean Disinfection for the destruction of biofilms and pathogens All cooling tower fans must be shut OFF and proper LOTO procedures in place prior to start of process, and all recirculation pumps must be ON. The system is disinfected using an oxidizing biocide such as chlorine or an equivalent chemistry. A bio dispersant may also be added to help remove organic deposits and enhance disinfection. Stage II Mechanical Cleaning for surface sanitation and removal of deposits Each system cell and/or sump is isolated and drained for mechanical cleaning. Each system cell is pressure washed from top to bottom, internal and external, as is reasonably accessible to remove deposits. Exceptional care is taken to remove deposits without damaging the fill pack. Deposits, including the sump if included in the scope, are removed for disposal. The Customer shall assist with disposal in the appropriate dumpsters or equivalents. Stage III Post-Clean Disinfection for the destruction of dislodged biofilms and pathogens. All cooling tower fans must be shut OFF, and all recirculation pumps must be ON. The system is disinfected using an oxidizing biocide such as chlorine or equivalent chemistry. The full water treatment program must be immediately resumed following the disinfection step to re-passivate system metallurgy. Stage IV Documentation and Certification The cleaning and disinfection service is documented with a service report with photos and a certificate for a record of due diligence. Documentation supports a site risk reduction program for control of Legionella in cooling water systems. SEASONAL START UP/SHUTDOWN The vendor will do a full check and start-up of all cooling towers and fluid coolers ensuring full operability. Clean debris from the platform and surrounding area. Clean water sump and check condition. Check make-up valve operation and adjust accordingly. Check and clean bleed-off line and overflow. Clean tower strainers. Check the condition of tower spray nozzles and eliminators. Check sump heaters and thermostats for calibration and operation. Check and adjust fan belts, as necessary. Check for leaks. Lubricate fan and motor bearings per manufacturer s recommendations. Check the amperage on motors. Inspect electrical connections, contractors, relays, and operating/safety controls. PARTS REPLACEMENT All parts needed to replace failed components of the equipment will be provided by the vendor/contractor. This includes materials or components, such as refrigerant, oil, and other materials the Contractor will provide to perform maintenance and repairs as scheduled under monthly maintenance and seasonal start up. Any parts, repairs, and/or maintenance outside of the standard maintenance that will require additional charges must be discussed with the COR and CO prior to any work being done. All additional charges will require a new purchase order to be issued. Work done without a purchase order will be assumed to be covered by the Vendor. Only the CO can obligate funding. WRITTEN REPORTS Provided to customer representative following each regular inspection or emergency call. Requirements for Adjustable or Variable Frequency Drives ANNUAL MAINTENANCE Once a year a thorough preventative maintenance schedule will be performed including the following: Base year initial base line reading of all VFDs will be provided in written report and subsequent yearly reports will be provided. Remove all debris, dust, or residue material from the drive enclosure. Clean printed circuit boards with an approved cleaner or small brush. Inspect for any lose plugs or ribbon cables. Inspect for any damaged or missing items. Look for any overheated or charred components. Look for discolored components, smudges, or smoke residue. Tighten all connections. Inspect cooling fans for proper operation and change filters quarterly. Check the continuity of all control circuit fuses. Perform diode test of the diode bridges. Perform continuity check of Debus and bus caps. Perform diode test of transistors. Check and record AC line voltage. Check and record motor output lead voltage for balanced supply. Check and record Debus voltage. Compare data with previous tests to expose degradation of components. PART REPLACEMENT All parts needed to replace failed components of the equipment will be provided by the contractor. This includes all materials or components, such as refrigerant, oil, and other materials the Contractor will provide to perform maintenance and repairs as scheduled under annual maintenance. Any parts, repairs, and/or maintenance outside of the standard maintenance that will require additional charges must be discussed with the COR and CO prior to any work being done. All additional charges will require a new purchase order to be issued. Work done without a purchase order will be assumed to be covered by the Vendor. Only the CO can obligate funding. 5.5. Task 5: Part 5 Rotary Chillers and Auxiliary Equipment (Process System) QTY DESCRIPTION MODEL MFG TYPE 2 CHILLERS 1,2 RTWD250F TRANE DUAL COMPRESSOR 134A 2 CHILLED WATER PUMPS EJMM2531T BALDOR 25HP 2 CONDENSER PUMPS EJMM1531T BALDOR 15HP 4 PUMP VFD S 1,2,3,4 TR200 TRANE 2 DRY-COOLER CONDENSERS REPCM-ACC KRAMER 8 FANS EACH 1 TRANE TRACER AUTOMATION SYSTEM MISC. PROCESS CHILLER 5.5.1. Requirements for Rotary Chillers: ANNUAL MAINTENANCE Once a year, thorough preventative maintenance will be performed, including the following Furnish oil filters and gaskets as required. Pressure test as required using system pressure. Repair any leaks. Provide refrigerant leak report to owners as required by EPA guidelines. Detailed inspection of purge system and thorough cleaning of purge compressor, purge oil separator, purge drum. Detailed inspection of purge system to include control circuit diagnostics, purge tank checkout and water removal, replace filter drier cores and clean the air-cooled condenser, if applicable. Check the condition of contacts for wear, pitting, etc. Check and calibrate safety controls, including all transmitters, flow meters, and all other monitoring devices. Meg compressor motor and oil pump. Check main starters and perform recommended testing (this includes all the chillers). Check main starters and tighten all starter terminals and check contacts for wear. Check overloads. Tighten motor terminals and control panel terminals. Clean oil strainer, replace filter and gasket where required. Tighten oil heater leads. Check operation of vane position. Take oil sample and have analyzed for acid, moisture, and wear metal content. Change oil when so indicated by oil analysis unless done on annual schedule. Provide yearly recommended maintenance on refrigerant monitor along with calibration test, if applicable. Report any noted deficiencies. MONTHLY MAINTENANCE Monthly inspections to be made during the operating season, to include the following: Adjust operating and safety controls. Record settings. Complete operating log of temperatures, pressures, and voltages. Change oil in the purge vacuum pumps when required. Check operation of purge system. Check operation of control circuit. Check operating of lubricant system including oil pump and oil pressure regulator. Check operation of motor and starter. Check customer log with operator, discuss operation of the machine generally. Report to operator any uncorrected deficiencies noted. Make operating log of temperatures, pressures, voltages, amperages, etc. Check and adjust operating and safety controls. Check operation of oil reservoir sump heater. Check oil level and add as required. Check operation of control circuit. heck operating log with operator, discuss operation of the machine generally. Check operation of motor and starter. SEASONAL START UP The contractor will advise regarding the start of the month. Test motor (Meg). Start machine, check controls, and calibrate. Complete operating log and record settings monthly. Check refrigerant and oil levels. Check purge operation. Check starter operation, voltage, and current. Set up operating log with operator, instruct, and advise troubleshooting techniques. ANALYSIS SERVICES Various diagnostic tests are to be performed depending on equipment duty and type. Reports with interpretation and recommendations are to be included. Oil sample and analysis for wear metals, acid content, and moisture. Sample to be taken two (2) times per year. Refrigerant analysis for acid and moisture content (as required). ANNUAL OPERATOR TRAINING Training of operators or building engineers on the equipment covered, if required. Eight (8) hours of training per year for every boiler plant employee, up to 16 employees. Any unutilized training costs will be reimbursed. PARTS REPLACEMENT: All parts needed to replace failed components on non-covered equipment will be offered at a discount percentage (30%). This does not include materials or components, such as refrigerant, oil, and other materials the contractor will provide to perform maintenance and repairs as emergency or scheduled under annual maintenance, monthly maintenance, seasonal start up and analysis services. Any parts, repairs, and/or maintenance outside of the standard maintenance that will require additional charges must be discussed with the COR and CO prior to any work being done. All additional charges will require a new purchase order to be issued. Work done without a purchase order will be assumed to be covered by the Vendor. Only the CO can obligate funding. WRITTEN REPORTS Provided to customer representative following each regular inspection or emergency call. 5.5.2. Requirements for Adjustable or Variable Frequency Drives ANNUAL MAINTENANCE Once a year a thorough preventative maintenance schedule will be performed including the following: Base year initial base line reading of all VFDs will be provided in written report and subsequent yearly reports will be provided. Remove all debris, dust, or residue material from the drive enclosure. Clean printed circuit boards with an approved cleaner or small brush. Inspect for any lose plugs or ribbon cables. Inspect for any damaged or missing items. Look for any overheated or charred components. Look for discolored components, smudges, or smoke residue. Tighten all connections. Inspect cooling fans for proper operation and change filters quarterly. Check the continuity of all control circuit fuses. Perform diode test of the diode bridges. Perform continuity check of Debus and bus caps. Perform diode test of transistors. Check and record AC line voltage. Check and record motor output lead voltage for balanced supply. Check and record Debus voltage. Compare data with previous tests to expose degradation of components. PART REPLACEMENT All parts needed to replace failed components of the equipment will be provided by the contractor. This includes all materials or components, such as refrigerant, oil, and other materials the Contractor will provide to perform maintenance and repairs as scheduled under annual maintenance. Any parts, repairs, and/or maintenance outside of the standard maintenance that will require additional charges must be discussed with the COR and CO prior to any work being done. All additional charges will require a new purchase order to be issued. Work done without a purchase order will be assumed to be covered by the Vendor. Only the CO can obligate funding. Deliverables The contractor will provide the following: Monthly preventive maintenance/ repair reports on all chiller plant equipment. Yearly refrigerant leak test reports. Yearly chiller vibration reports. Yearly oil test reports. Copies of all testing results along with certifications will be submitted to the COR. Performance Monitoring The COR will ensure maintenance and repairs are completed in accordance with the QASP submitted. Check In Requirements The Contractor Service Personnel and/or representative must report to the appropriate department Supervisor or designated point of contact (POC) to sign in with department staff before work begins. Additionally, one must submit any mobile media devices that would be used on the system for a virus scan. Upon completion of work, the Contractor Service Personnel and/or representative must report to the appropriate department Supervisor to brief that Supervisor or related department staff point of contact (POC) if Supervisor is unavailable concerning completion of service, and then to sign out. At the end of each briefing, Contractor Service Personnel and/or representative will and must sign out. Security Requirements The C&A requirements do not apply, and a Security Accreditation Package is not required. 9.1. Dedicated personnel will be assigned solely to observe, interact, assist, and assure protection of VA sensitive inf...

More opportunities from Department Of Veterans Affairs → 250-NETWORK Contract Office 10 (36C250)

Same awarding agency

NAICS: 811210
New
Federal
J066--Sakura Service Agreement | Follow on Base+4 | Start: 1/21/27 Columbus VAACC
Solicitation # 36C25027Q0082
The Department of Veterans Affairs Network Contracting Office 10 is soliciting a firm-fixed-price service agreement for the maintenance of Sakura instruments at the Chalmers P. Wylie Ambulatory Care Center in Columbus, Ohio. The contract, designated for HUBZone small businesses, covers a base year starting January 21, 2027, with four one-year options. The scope of work includes planned and corrective maintenance, emergency services, labor, parts, and technical support for specific equipment, including Tissue-Tek VIP 6 AI Processors, a Tissue-Tek Film Coverslipper, and a Tissue-Tek Prisma Plus. All services and parts must meet or exceed Original Equipment Manufacturer (OEM) standards. Award will be based on the Lowest Price Technically Acceptable (LPTA) method. Offerors must demonstrate competency in servicing the specified equipment and provide detailed plans for OEM parts acquisition and field service reporting. Key performance requirements include a telephone response within 24 hours of notification for unscheduled maintenance and equipment restoration within 72 hours. Additionally, field service reports must be submitted to the Healthcare Technology Management Department within 15 days of each visit. Proposals are due by November 12, 2026, via electronic email submission.
Electronic and Precision Equipment Repair and Maintenance

POSTED

about 10 hours ago

DEADLINE

in 14 days
View Details
NAICS: 562119
New
Federal
P100--Facility Scrap and Recycling Services — VA Northeast Ohio Healthcare System – Louis Stokes VA Medical Center
Solicitation # 36C25027Q0075
The Department of Veterans Affairs, Network Contracting Office 10, is soliciting quotes for facility scrap and recycling services for the Louis Stokes VA Medical Center and its associated offsite facilities in Cleveland, Ohio. This small business set-aside under NAICS 562119 involves the on-call removal, recycling, and disposal of scrap materials, including metals, wood, plastics, and ceramics. The contractor must pick up materials within 48 hours of notification, with emergent needs addressed within 24 hours. The contract is structured with five ordering periods and a performance end date of October 14, 2031, with a possible six-month extension. Award will be based on a comparative evaluation of administrative compliance, technical approach, price, and past performance. Technical evaluations focus on the methodology for pickup and disposal, communication and ordering plans, quality control, and the ability to remit recycling proceeds to the Agent Cashier within a strict 14-day deadline. Submissions must include specific administrative documents, such as a Certificate of Insurance and a Limitations on Subcontracting Compliance Worksheet, with pricing submitted exclusively in Microsoft Excel format. The contractor must also adhere to VHA Directives for waste-stream reporting and comply with VA cybersecurity and HIPAA privacy regulations.
Other Waste Collection

POSTED

about 10 hours ago

DEADLINE

in 25 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS