Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Sources Sought opportunity from Department Of Veterans Affairs was posted on February 6, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

J045--36C259-24-AP-1064 | Boiler Program Development

Closed
36C25924Q0227Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 811310
New
Kubota M8200 Clutch Replacement
Solicitation # kubota-m8200-clutch-replacement
Management & Training Corporation (MTC) is soliciting bids for the clutch replacement of a Kubota M8200 tractor with front wheel assist, no cab or loader, located at the Earle C. Clements Job Corps Center in Morganfield, Kentucky. The scope of work requires the contractor to provide all transportation, labor, supervision, tools, and new manufacturer-specified parts to diagnose and repair the clutch assembly and power take-off (PTO) system. Key technical requirements include disassembling tractor components, replacing friction discs, bearings, oil seals, and O-rings, resurfacing the flywheel, and replacing hydraulic pipes and filters as necessary. The project is complete once the Facility Maintenance Department verifies proper clutch engagement and PTO operation under load. This is a small business set-aside opportunity under NAICS code 811310, open to various SBA-certified categories including VOSB, SDVOSB, WOSB, and HUBZone businesses. Proposals must be submitted via email to Angie Mahoney by November 3, 2026, and must include a lump sum bid sheet, a completed supplier packet with a W-9 and self-certification form, and proof of insurance. Award will be based on best value, considering the contractor's qualifications, experience, and the itemized cost breakdown. The contract is subject to Federal Acquisition Regulation (FAR) clauses regarding the Buy American Act, combating trafficking in persons, and Service Contract Labor Standards per Wage Determination No. 2015-4687 Revision 31 for Kentucky.
Earle C. Clements Job Corps Center

POSTED

about 2 hours ago

DEADLINE

in 5 days
NAICS: 811310
New
SLED
**Certified SB/DVBE Only** IFPQ Boiler Inspection, Maintenance, Repair, Testing, and Reporting in Los Angeles County
Solicitation # 07A6539
The California Department of Transportation (Caltrans) is soliciting price quotes for an Invitation for Price Quote (IFPQ 07A6539) to provide comprehensive boiler inspection, maintenance, repair, testing, and reporting services at the District 7 Office facility in Los Angeles, California. The scope of work includes annual and quarterly preventative maintenance for three Unilux water tube boilers and six boiler pumps, ensuring compliance with manufacturer standards, ASME Code, OSHA requirements, and South Coast Air Quality Management District standards. This is a set-aside solicitation exclusively for certified Small Business (SB), Microbusiness (MB), or Disabled Veteran Business Enterprise (DVBE) entities. The contract will be awarded to the responsible bidder offering the lowest price quote who meets all specifications. Key operational requirements include a 48-hour response time for routine service requests and a strict prohibition on subcontracting any portion of the work. The contractor must adhere to State General Prevailing Wage Rates for Los Angeles County and provide a payment bond for any service request exceeding 25,000 dollars. Required submission documents include a Price Quote Proposal, Bidder Certification Sheet, Non-Collusion Declaration, and certifications for California Civil Rights Laws and the Darfur Contracting Act. Invoicing is conducted monthly in arrears and must be accompanied by certified payroll records and DVBE utilization reports. The agreement is subject to a budget contingency clause, meaning it is enforceable only if sufficient funds are provided by the California State Legislature or the United States Government.
California Department of Transportation

POSTED

about 11 hours ago

DEADLINE

in 15 days
NAICS: 811310
New
SLED
Dietary Equipment Service Agreement
Solicitation # BPM059212
Clifton T. Perkins Hospital Center is soliciting bids for a Dietary Equipment Service Agreement to provide inspections and maintenance for industrial food and beverage equipment within the facility's main kitchens. This Small Business Reserve Procurement is limited to vendors certified by the Governor's Office of Small, Minority and Women Business Affairs. The scope of work includes regular inspections for wear and tear, preventive maintenance, and specific calibration for refrigeration, freezers, cooking appliances, sanitation and warewashing equipment, ventilation, and ice machines. The contract is an Indefinite Quantity agreement with Fixed Unit Prices, featuring a one-year base period and a total award cap of 50,000 dollars. Qualified bidders must hold a Maryland HVACR license issued by the Department of Labor and provide three professional references demonstrating at least three years of relevant experience. Because the facility is a secure psychiatric hospital, contractors must adhere to strict safety and conduct guidelines, including tool inventory controls, patient confidentiality agreements, and professional dress codes. Site visits must be requested by email to the Procurement Officer by October 20, 2026. Bids must be submitted exclusively via the eMMA portal by November 4, 2026, at 2:00 pm. Award will be granted to the responsible bidder offering the most favorable bid price.
Clifton T. Perkins Hospital Center

POSTED

about 13 hours ago

DEADLINE

in 5 days
NAICS: 811310
New
SLED
RFP 07-135 Roseville Electric Utility – Air Compressor Maintenance
Solicitation # 07-135
The City of Roseville is soliciting proposals under RFP 07-135 for a consultant to provide comprehensive scheduled preventive and corrective maintenance for air compressors and auxiliary systems, including Ingersoll Rand equipment. The services will be performed at the Roseville Energy Park and Sunset Energy Center in California. The selected consultant will be responsible for providing all necessary labor, technical expertise, specialized tooling, and materials. This is a prevailing wage project with an initial contract duration of five years, estimated to commence in April or May. Proposals must be submitted by December 16, 2026, via email to the City Clerk or through physical delivery in a sealed container with the required Attachment H label. The award will be based on a formal evaluation panel process considering the firm's experience and qualifications (25 points), the proposed project plan (35 points), and cost (40 points), with potential interviews for top candidates. Requirements for the successful bidder include obtaining a City of Roseville business license, providing 100% faithful performance and labor and materials bonds, and maintaining specific insurance policies. Consultants must also disclose any conflicts of interest and adhere to the Levine Act regarding political contributions.
City of Roseville

POSTED

about 16 hours ago

DEADLINE

in about 2 months

General Info

NAICS

811310 - Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance

Place of Performance

CO

Set-Aside

NONE

Documents

1

36C25924Q0227 - Boiler Program Development

DOCX, High priority: read this firstsources-sought
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Sources Sought

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Veterans Affairs → Network Contract Office 19 (36C259)
Contacts1 person available
OfficeGreenwood Village, CO, 80111, USA
Office AddressGreenwood Village, CO, 80111, USA
Contacts
Alejandra SierraContract Specialist

Full Description

Show more
Page 2 of 2 REQUEST FOR INFORMATION / SOURCES SOUGHT SYNOPSIS The Department of Veterans Affairs Network Contracting Office (NCO) 19, Rocky Mountain Acquisition Center (RMAC) is issuing this source sought notice as a means of conducting market research to identify parties having an interest in, and the resources to support this requirement for Boiler Program and Safety Device Testing for the Rocky Mountain Regional Veterans Affairs Medical Center, located at 1700 N. Wheeling Street, Aurora, CO 80045. The result of this market research will contribute to determining the method of procurement. The applicable North American Industry Classification System (NAICS) code assigned to this procurement is 811310 Commercial and Industrial Machinery and Equipment (Except Automotive and Electronic) Repair and Maintenace. This is a request for information and sources only, which may or may not lead to a future solicitation! This is not a solicitation. This request for capability information does not constitute a request for proposals; submission of any information in response to this market survey is purely voluntary; the government assumes no financial responsibility for any costs incurred. Contractor shall provide all necessary personnel, tools, (test) equipment for the Boiler Program and Safety Device Testing according to the Scope of Work (SOW). BASED ON THE RESPONSES TO THIS SOURCES SOUGHT NOTICE, THIS REQUIREMENT MAY BE SET-ASIDE FOR SSERVICE DISABLED VETERAN OWNED SMALL BUSINESSES, SMALL BUSINESSES OR PROCURED THROUGH FULL AND OPEN COMPETITION and only one award MAY be made. Telephone inquiries will not be accepted or acknowledged, and no feedback or evaluations will be provided to companies regarding their submissions. SUBMISSION INSTRUCTIONS: If your organization can provide these services and is interested in this opportunity, please respond to Alejandra Sierra, Contracting Specialist, Department of Veterans Affairs, NCO 19, 6162 South Willow Drive, Suite 300, Greenwood Village, Colorado 80111 or via e-mail at contact@example.gov and contact@example.gov with a statement describing your capabilities. The capability statement shall include a point of contact, complete mailing address, telephone number, email address, and state the company s business size status and should address this specific requirement, with appropriate documentation supporting claims of organizational and staff capability. Please be as thorough as possible in your submission. Requests for copies of a solicitation will not be honored or acknowledged. The deadline for responses is Wednesday, February 15, 2024 at 8:00 AM mountain time. Boiler Program Development & Site Specific Procedure Development For Eastern Colorado Health Care System (ECHCS) at Rocky Mountain Regional VA Medical Center (RMRVAMC) Statement of Work Objective: To bring RMRVAMC into compliance per VHA Directive 1810 January 4, 2023 and the VHA Boiler and Associated Plant Safety Device Testing Manual 7th Edition January 2023. Combustion Analysis/Tuning Semi-Annually Pressure Relief Valve Replacement and Certification Boiler Program Development 6-year Inspection and Magnetic Particle Testing Service Hours for H Stamp Welding, Testing, and Certification Equipment BOILERS Boiler #1: Cleaver Brooks; Model No. 4WI-200-700-200ST; Serial No. T3786-1-1 Boiler #2: Cleaver Brooks; Model No. 4WI-200-700-200ST; Serial No. T3786-1-2 Boiler #3: Cleaver Brooks; Model No. 4WI-200-700-200ST; Serial No. T3786-1-3 Boiler #4: Cleaver Brooks; Model No. 4WI-200-700-200ST; Serial No. T3786-1-4 Deaerator Tanks De-Aeration tank: Cleaver Brooks, Spraymaster; Model No. SM-4000; Serial No. T3786-5-1; 100,000 lbs/hour capacity. Condensate/Surge Tank. Condensate/Surge Tank: Cleaver Brooks; Model No. SRG-4096-4F; Serial No. T3786-6-1; 4,096 gallon capacity. Combustion Analysis/Tuning (Semi-Annual) The inspections, testing, and adjustments shall comply with: The recommendations and requirements of VHA Boiler Plant Safety Devices Testing Manual. The written recommendations of the equipment manufacturers. The requirements and recommendations of NFPA 85 Boiler and Combustion Systems Hazard Code including applicable appendices. Burner performance requirements in this document. A summary of the work is as follows: Review boiler plant log sheets and alarm and trouble reports. Review records that show combustion performance (flue gas oxygen). Perform overall visual inspection of systems. Verify that systems comply with referenced codes and VA requirements stated in this contract. Test the operation and set points of all burner/boiler safety interlock devices. Refer to list below. Record the settings and compare with required settings. Make adjustments as necessary and record the new settings. The operation of a device must result in burner shutdown and/or proper alarm operation. Operate burner(s) on each fuel from low fire to high fire and back to low fire in at least six increments and record combustion performance (flue gas oxygen, carbon monoxide, NOx where applicable), fuel train pressures, atomizing train pressures, burner pressures, stack temperatures, boiler steam output. Compare the combustion performance data with VA requirements (see below) and previous readings. If necessary, make adjustments to the fuel flow and combustion air controllers, control valves and dampers to obtain the required performance. Record the new performance data. If further work, such as repairs or burner modifications, is needed to correct any problems, provide recommendations to the COR. Verify accuracy of instrumentation listed below. Verify that all devices are properly selected for the application in terms of type, size, set point range, performance, and code approval. Calibrate all instruments that are not within manufacturer s specifications for accuracy. Immediately inform COR and POC of any recommended repairs, modifications, or safety related problems. List of interlocks and safety devices to be inspected and tested on each boiler/burner: High and low fuel pressure switches (gas/oil). Low fuel oil atomizing media (steam/compressed air) pressure switches. Low differential pressure switch, atomizing media/fuel oil (if provided by burner manufacturer). Oil burner position switch (if provided by burner manufacturer). Fuel safety shut off valves proof of closure (over-travel/valve seal switch). Leak test fuel safety shut off valves (main and pilot burners) (leakage into burner). Leak test gas fuel vent valves. Forced draft motor interlock. Forced draft damper wide-open interlock for purge. Outlet damper open interlock for purge (if outlet damper provided). Purge airflow interlock. Purge timing. Ignition timing. Low fire position interlock, if present. Combustion airflow interlock. Main flame out time to close fuel valves. Ignition flame out burner shutdown. Scanner not sensing ignition spark (ultraviolet scanner). Scanner not sensing hot refractory (infrared scanner). Required burner performance (natural gas and fuel oil): Turndown (ratio of maximum and minimum firing rates): 10/1 8/1 5/1 4/1 (Refer to original burner specification). Achieve, but do not exceed, boiler maximum steam flow output rating. Measure fuel input at minimum and maximum firing rates. Maximum carbon monoxide: 200 parts per million (ppm) Maximum NOx (Nitrous Oxide): Refer to original burner specification. Flue gas oxygen: 2.5 4.2% (Up to 5.2% at loads below 40% of maximum steam output; no upper limit at minimum firing rate; oxygen can be one percentage point higher on oil firing). Flue gas oxygen (low excess air burners): 1.0 2.0% (Up to 2.5% at loads below 40% of maximum steam output; no upper limit at minimum firing rate; oxygen can be one percentage point higher on oil firing). No visible smoke, except on heavy oil fuel maximum opacity is 20%. Comply with local emissions regulations. Flames shall be stable with no pulsations, shall be retained near burner, no blow-off or flashbacks, no constant flame impingement on refractory or water-walls. Pressure Relief Valve Replacement & Certification Pressure Relief Valve Replacement Labor, equipment, and supporting material costs to remove current valves, replace and install the new valves listed below: 8 EA 1 ½ Kunkle 6030HGE01-AM 4 EA 2 Kunkle 6252AKH01-AS 3 EA Kunkle 6252KNM01-LS 2 EA Kunkle 6252ALJ01-LS 10 EA Ashcroft 04V012VASS50 Block & Bleed Valves Labor, equipment, and material costs to bench test and certify the following removed valves and return to the Government: 8 EA 1 ½ Kunkle 6030HGE01-AM 4 EA 2 Kunkle 6252AKH01-AS 3 EA Kunkle 6252KNM01-LS 2 EA Kunkle 6252ALJ01-LS 10 EA Ashcroft 04V012VASS50 Block & Bleed Valves Repair and Replacements due to Bench Test Failures Vendor to supply quote for replace/rebuild of any valve(s) that failed the bench test requirement in section 4.1.2 Boiler Program and Lockout Tagout Document Development Procedure Development The contractor shall develop site specific Boiler Plant Standard Operating Procedures (SOPs) and associated documentation templates and forms. They shall write a VHA compliant Boiler Plant Engineering SOP and accompanying attachments to address all Directive 1810 required procedures and documentation forms to include new hire and ongoing training programs. SOP shall include hot water distribution systems. The contractor shall develop written site specific normal and emergency operation procedures for high pressure boiler plant and associated plant devices. The contractor shall develop site specific safety device testing procedure for all safety devices on high pressure boilers and associated plant devices. Procedures will be site specific and in accordance with VHA Safety Device Testing Manual 7th Edition. Procedures will provide step by step guidance with photos of local equipment to facilitate a compliant safety device testing program. Custom documentation sheets will also be developed for each test. The contractor shall create procedures onsite and will fully vet each procedure form completeness, accuracy, and performability alongside in house personnel. The contractor shall provide all procedures and documentation forms into useable printable packaged booklets in PDF form. The contractor shall provide all electronic files created over to the VA upon completion of services. VA shall have full authority and freedom to edit/update files as desired. Program Documentation Updates. Program documents will be evaluated in option years 1 onsite with RMR Energy Plant personnel. Anticipated onsite work to take 5 business days with each business day lasting 9 hours. The site visit must be coordinated and scheduled via email 4 months in advance. Lockout Tagout Procedure Development. Contractor to provide step by step Lockout/Tagout (LOTO) procedures for the equipment listed in section 2 above using the attached LOTO standard operating procedure (SOP), OSHA 1910.333, and NFPA (b) (2) regulations. Procedure development will require the Contractor to be onsite to gather all required information and coordinate with FMS and Safety Leadership at RMR. LOTO in-person training for 15 operators over the course of 5 days, each day will be 9 hours. Training must take place at RMR. LOTO documents will be evaluated in option years 1 onsite with RMR Energy Plant personnel. Anticipated onsite work to take 5 business days with each business day lasting 9 hours. Inspection and Magnetic Particle Testing Annual internal and external inspections are required for each boiler. Internal inspections of the feed water de-aerator pressure vessel are required. All inspections to be completed on the base year and will be the top priority of the contractor s proposed schedule. Contractor shall coordinate with COR to schedule an inspection. The Contractor shall ensure coordination and scheduling of any inspection is conducted at least two weeks prior to the intended date of an inspection. Inspections must be scheduled for periods when the VA determines that the boilers that will be inspected internally will not be needed for steam supply and when the COR or his/her designate is available on site to monitor the inspections. To maintain steam service, only one boiler at a time will be scheduled for internal inspections per inspection visit. Thus, multiple visits will be necessary every year to inspect all the boilers internally. Feed water de-aerator pressure vessel inspections must be scheduled during periods of low steam demand. Coordinate the inspection schedule with the COR so that VAMC can have personnel available to monitor the inspections. Boilers scheduled for internal inspection will be prepared by the contractor prior to the scheduled arrival of the Qualified Professional Inspector. This includes cooling the boilers to near ambient temperature and having all man ways, hand holes and furnace access doors open; the boilers cleaned of loose materials waterside and fireside; electrical lock-out, tag-out in place; connecting piping isolated; proper illumination provided; compliance with confined space access requirements including having safety personnel present in the boiler plant. Similar advance preparations will be made to the feed water de-aerator when it is scheduled for internal inspection. VAMC will comply with any other requirements of the contractor that are considered reasonable by VAMC and have been presented in writing at least two weeks prior to the scheduled inspection. The boiler and feed water de-aerator inspections shall comply with the guidelines in the current issue of the NATIONAL BOARD INSPECTION CODE, Part RB, In-service Inspection of Pressure-Retaining Items, and ASME Boiler and Pressure Vessel Code, Section VI or VII as applicable. In addition to those guidelines, the inspections shall comply with all requirements listed in statement of work. The inspector must completely enter the internal spaces of the boiler or feed water de-aerator and visually inspect all internal surfaces that can be accessed. Methods for testing safety devices shall comply with VHA Boiler Plant Safety Device Testing Manual, 7th Edition. Repairs and Re-Inspections Repairs Contractor to provide quote (to include subsequent re-inspection) to COR within 5 business days of discovery for all deficiencies identified through inspections required as part of section 6.1. All repairs must be approved and coordinated with COR prior to scheduling any work. Contractor to provide repairs not to exceed $25,000 per year of contract and all testing/certification documents within 10 business days. Emergencies Contractor to provide up to 6 emergency (after hours and/or weekend/holiday) call outs per year of contract. Contractor to provide quote for any emergent repairs needed within 24 hours of site visit to the COR via email. Contractor to provide emergent repairs not to exceed $15,000 per year of contract and all testing/certification documents within 10 business days. Summary of the minimum inspection requirements for boilers: Review the boiler history including: operating conditions, date of last inspection, current inspection certificate, ASME stamping on boiler, National Board registration number, history of repairs and modifications. Review boiler logs, water test reports, and reports on tests performed on the burner controls and interlocks. The contractor is expected to do this work on station. Assess the external parts of the boilers and boiler accessories and piping and valves for safety, accessibility, proper maintenance and operation, cleanliness, and compliance with codes. Inspect for evidence of leakage of combustion gases or fluids, externally and internally, including all gaskets. Inspect foundations for signs of stress such as cracking or movement. Inspect boilers externally and internally for defects including bulges, blisters, cracks, wasted or eroded material, warping, general corrosion, grooving and pitting, damaged insulation. Inspect all accessible internal surfaces for waterside and fireside deposits, including scaling, sediment, debris, carbon deposits. Examine all stays and stayed plates. Inspect gas side baffles. Inspect internal drum surfaces and steam separating internals. Inspect tubes, tube ends and tube alignment. Check for sagging tubes. Set combustions for boilers number one, two, and three, on natural gas and number two oil. Test all safety devices and perform annually required accumulation tests on boilers one, two and three. Verify that all nozzles of internal piping such as feed water admission and bottom blow off collection are clear with no obstructions. Inspect seating surfaces of man ways and hand holes. Check that boiler structure is plumb and level with no excessive deformations. Check for missing items such as bolts and nuts. Examine all valve and pipe connections to the pressure vessel. Inspect refractory including burner throat, expansion joint, bull ring, furnace seals, furnace walls and floor. Verify proper alignment of burner assembly. Inspect furnace for evidence of flame impingement. Test operation of water level gage glass. Perform mechanical and electrical inspection of disassembled low water cutouts (disassembly by VA). After reinstallation, test operation to the extent possible. Test low water cutouts on hot boilers by lowering water level gradually. Verify that steam pressure gage is properly calibrated. Test operation of high steam pressure cutouts on hot boilers by raising steam pressure. Inspect safety valve installations and verify that the valves have proper capacity and set pressure and valves, drains and vents are properly installed. Verify that valve locking seals are not broken. On boilers that are hot, perform an operation test under pressure to confirm operation at proper set pressures. Operate boiler with burner at high fire to verify adequate steam flow capacity of the safety valves ( accumulation test ). Inspect piping connected to the boilers for evidence of leakage, provision for expansion, provision of adequate support, proper alignment, and evidence of detrimental conditions. Inspect piping to the water column, low water cutoffs and alarms, gage glass. Verify that interior of piping is clear of obstructions. Inspect valves on boiler feed water, blow down, drain and steam systems. Perform service and Calibration of boiler instrumentation and controls. Provide recommendations for non-destructive testing when the inspections indicate that this is necessary to assure continued safety and reliability under current operating conditions. Summary of the minimum inspection requirements for Feed water Deaerators: Review the feed water de-aerator history including: operating conditions, date of last inspection, current inspection certificate, ASME stamping, National Board registration number, materials of construction, extent of post weld heat treatment, history of repairs and modifications. Assess the external parts of the feed water de-aerator and accessories and piping for safety, accessibility, cleanliness, proper operation, and compliance with codes. Test hazardous gas monitoring system. Inspect for evidence of leakage. Note feed water de-aerator pressure gage and thermometer readings and verify gage and thermometer accuracy. Inspect safety valve installation and verify that the valves have proper set pressure and capacity and are properly installed. Perform an operation test under pressure to confirm operation at proper set pressures. Verify that the de-aerator can safety withstand the test pressure prior to testing the valve(s) in-situ. Verify that non-condensable gas vent line is open and proper orifice is provided to permit venting of gases. Inspect support structures for proper integrity and allowance for thermal expansion. Internal Inspections: Visually inspect all visible pressure vessel surfaces for corrosion, material thinning, deposits, and weld cracking. Inspect spray nozzles and trays. Work Standards The Contractor shall travel to the RMRVAMC and work in conjunction with the COR, Boiler Plant Supervisor and other appropriate personnel to complete all deliverables outlined in sections 3.0 7.0. Contractor must follow the VHA Boiler Plant Safety Device Testing Manual 7th Edition procedures. Work site shall be free of debris and returned to original condition upon completion of preventative maintenance. Contractor personnel shall present a neat appearance and wear VA issued identification tags at all times. The Contractor shall assign the appropriate quantity and type of personnel to successfully complete all functions specified in this SOW. The Contractor shall maintain throughout the life of this contract, a current list of technicians and their credentials available for inspection by the Government at any time. Requirements and Qualifications of Testing Personnel Inspection and Testing Requirements At least two weeks notice to the Contracting Officer s Representative (COR) is required prior to an inspection. Work cannot be scheduled during heavy steam load periods. Only one boiler at a time can be out of service for the inspection, testing and calibration procedures. Work must be conducted when the COR or his/her representative is available on site to monitor the work. The contractor is required to prepare the boilers for inspection by opening, cleaning watersides and firesides, and preparing the boiler for inspection following National Board, ASME, Veterans Administration and industry requirements/guidelines. The contractor will also be required to restore the boiler for service. Each burner and the burner control, monitoring and safety interlock systems shall be inspected and tested and adjusted as necessary. VA will have the boilers that are to be serviced prepared for the test personnel upon their scheduled arrival. This includes having the boilers clean of soot and loose scale; fully warmed and at normal steam pressure; steam exhaust silencer system operable; all boiler, burner and fuel train pressure gages and thermometers calibrated; fuel meters in accurate operation (pressure/temperature correction factors provided, if applicable); boiler steam flow, stack temperature and flue gas oxygen instruments operating. VA will comply with any other requirements of the test personnel that are considered reasonable by VA and have been presented in writing at least two weeks prior to the scheduled testing. The COR or his/her representative will observe the work. Qualifications of Testing Personnel Boiler Inspectors shall be a qualified Professional Inspector . Proof of qualification shall be provided to the COR upon request. They shall be versed with and have access to the current versions of reference materials defined in section13.0. A Qualified Professional Inspector is defined as one who possesses one or a combination of the below requirements: A boiler inspector who has a valid commission from the National Board of Boiler and Press Vessel Inspectors (NB). A boiler inspector who has qualified by passing a written examination under the laws, rules, and regulations of a jurisdiction of a state. A boiler inspector who is regularly employed as a boiler inspector by a jurisdiction which has adopted and administers one or more sections of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code as a legal requirement and has a representative serving as a member of the ASME Conference Committee. A boiler inspector who is regularly employed by an insurance company which has been licensed or registered by the appropriate authority of a State of the United States to wrote boiler or pressure vessel insurance. Combustion Analysis personnel shall be qualified for boiler plant burner, control, and instrumentation testing. Proof of qualification shall be provided as part of the contractor s proposal. Qualification includes completing at least a one-year trade school and five years successful experience in this field. The experience shall be largely wit institutional and industrial boiler plants similar in design to the VAMC plants. The testing personnel shall be equipped with portable electronic flue gas analyzers and all other test instruments necessary for the required tests and calibrations, all currently calibrated either according to the manufacturer s specifications or a standard traceable to the national Bureau of Standards. Reports and Records The Boiler Program Development documents will be furnished within 6 months of contract award. The Bi-Annual Boiler Personnel Training site specific written report will be furnished within 90 days of each training occurrence. Combustion Analysis/Tuning Report Requirements: Provide complete written report of the inspection fully describing all tests performed, all findings, and recommendations. The report shall have two sections the first section will be in a table form that with four columns: The first column labeled FUNCTION did the device pass or fail. The second column labeled Device list the device number and description in accordance with the VHA Boiler Plant Safety Devices Testing Manual 7th Edition. The third labeled Deficiencies-Recommendations The fourth column labeled corrective actions list any corrective actions taken during the inspection. Furnish report within 10 business days of facility inspection in Microsoft Word format by email to the COR. Provide hard copies of data sheets and flue gas analyzer strip printouts to the COR. All safety-related deficiencies shall be immediately reported to the COR, Boiler Plant Supervisor and/or Chief Engineer during the inspection visit. Inspection and Magnetic Testing Report will be furnished within 10 business days of each inspection/testing visit. All visits must be completed within the base year. The Boiler Program Audit Report (section 3.0) will be furnished within two weeks of each program audit visit. Resources The Government will not furnish any resources for the fulfillment of the services required under this contract. The contractor must provide all tools, equipment, materials, transportation, professional expertise, personnel, and supervision for maintenance services required under this contract. Hours of Work and Scheduling Scheduling The work will be performed Monday through Friday from 7:30am to 4:00pm. The majority of the work will have minimal impact on the operation of the VA Medical Center. Any potential disruption to ongoing medical center operations shall be coordinated 2 weeks in advance and shall be subject to review and approval by the COR/POC. Any other disruption of operations in any building shall be scheduled at least one week in advance with the COR/POC. Work shall be scheduled to allow continuous operation of all facilities to the greatest extent possible. Federal Holidays New Year s Day Dr. Martin Luther King Jr s Birthday Presidents Day Memorial Day Juneteenth Independence Day Labor Day Columbus Day Veteran s Day Thanksgiving Day Christmas Day Any other day specifically declared a National Holiday by the President of the United States When one of the above-shown holiday falls on a Sunday the following Monday will be observed as the legal holiday. When a federal holiday falls on a Saturday, the preceding Friday is observed as the legal holiday. Contractor Check-In All Contractor personnel working onsite at the VA facility shall check in and out with the COR/POC located in Building L (ENC). Access to work areas, and performance monitoring, will be provided by the COR. In all cases, the COR/POC shall be notified of any changes which may affect the response time of vital equipment. Compliance The Contractor shall be fully responsible for compliance with all VA, local, state, and Federal environmental/occupational safety laws, rules and regulations. The Contractor shall follow life and safety codes and take necessary actions to avoid conditions that may be hazardous to the health and safety of hospital personnel and patients. The Contractor is responsible for meeting all applicable OSHA and VA guidelines for safe working processes; example: lockout/tagout. All work for the duration of the contract shall be performed by trained technicians. All safety measures shall be approved as adequate by the safety officer in advance. Hazardous material disposal (refrigerant, oil, etc.) shall be the responsibility of the contractor. Quantities of hazardous material disposed of by the contractor shall be included in the service report. Reference Materials VHA Boiler and Associated Plant Safety Device Testing Manual 7th Edition. VA Directive 1810 January 4, 2023 ASME Boiler and Pressure Vessel Code ASME B31.1, Power Piping Code ASME CSD-1, Controls and Safety Devices for Automatically Fired Boilers ANSI/NB-23, National Board Inspection Code NFPA 85, Boiler and Combustion Systems Hazards Code Utilize National Board Forms NB-6 and NB-7 NATIONAL BOARD INSPECTION CODE, Part RB, In-service Inspection of Pressure-Retaining Items RMR Lockout Tagout SOP Period of Performance This requirement is for one (1) 12-month base year, plus one (1) 12-month option year. Place of Performance All work will be performed at Rocky Mountain Regional VA Medical Center at 1700 N. Wheeling Street, Aurora, Colorado, 80045.

More opportunities from Department Of Veterans Affairs → Network Contract Office 19 (36C259)

Same awarding agency

NAICS: 623220
New
Federal
Q519--554 | Short Term Psychiatric Transitional Housing Long-Term Contract | Base+4
Solicitation # 36C25926Q0497
Solicitation 36C25926Q0497, issued by the Department of Veterans Affairs Network Contracting Office 19, seeks a contractor to provide short-term, transitional residential care and psychiatric step-down services for the Rocky Mountain Regional VA Medical Center in Aurora, Colorado. The scope of work includes the potential use of Mental Health Transitional Living Homes Level I or II. The contract is structured with a base period from December 1, 2026, to November 30, 2027, and four subsequent one-year option periods. Payment is based on an individual bed day of care, defined as the period from 12:00 pm to 11:59 am the following day. The government will award the contract based on the most advantageous offer, evaluating technical capability, regulatory practices including HIPAA and OSHA compliance, and quality assurance programs. Contractors must maintain 24-hour staffing, ensure ADA accessibility, and adhere to strict health and safety codes. Required submissions include three separate volumes covering technical capability, past performance, and price, along with certifications for the Immigration and Nationality Act and Organizational Conflicts of Interest. Performance will be monitored through a Quality Assurance Surveillance Plan involving unannounced site visits, patient satisfaction surveys, and clinical outcome measures.
Residential Mental Health and Substance Abuse Facilities

POSTED

about 20 hours ago

DEADLINE

in 8 days
View Details
NAICS: 339112
New
Federal
6695--SURGERY GLOBUS INSTRUMENT SET
Solicitation # 36C25927Q0043
The Oklahoma City Veterans Affairs Health Care System requires one complete Globus Medical instrument set for use in neurology and orthopedic spine surgeries. This comprehensive solution must include all necessary components for functionality, such as cables, connectors, and mounts, and must adhere to stainless-steel standard operating procedures. The instruments must be reusable and specifically designed for spinal procedures in the operating room. The contractor must be an expert in the neuro and ortho spine field and is responsible for replacing any malfunctioning or broken items at no cost to the VA for the first 12 months following purchase, coordinating maintenance with the OKC VAHCS Biomedical Engineering Department. This procurement is identified as a sources sought notice under NAICS code 339112 and is set aside for Service-Disabled Veteran-Owned Small Businesses. Deliveries to the Oklahoma City facility are required Monday through Friday between 07:00 and 16:00. The instrument set consists of 35 specific line items, including various pedicle probes, rod templates, ratcheting handles, driver shafts, and taps. Interested vendors must provide a capability statement, business size information, country of origin, and estimated lead times. There are no security accreditation requirements as the contractor will have no access to patient records or restricted hospital areas, and no VA employee training is required.
Surgical and Medical Instrument Manufacturing

POSTED

2 days ago

DEADLINE

in 7 days
View Details
NAICS: 513210
New
Federal
R604--Mail Tracking Service
Solicitation # 36C25927Q0017
Solicitation 36C25927Q0017 is a firm-fixed price contract set aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB) to provide a web-based package and mail tracking system for the Department of Veterans Affairs. The primary site of performance is the Rocky Mountain Regional VA Medical Center in Aurora, Colorado, specifically within the KS-100 SCMS Warehouse. The system must be capable of processing approximately 250,000 parcels and will initially support up to 12 users. The contractor is responsible for providing all necessary hardware, including one barcode printer, 12 scanners with integrated signature pads, and one mobile device, as well as all associated consumables and routine replacement parts. The software will operate as a standalone system not connected to the VA network, meaning it should be SaaS permitted and will not require integration with internal VA identity management or directory services. The contract consists of a base period from October 30, 2026, to October 29, 2027, with four subsequent one-year options extending the total potential duration to five years and six months. Quotes are due by 14:00 MT on October 30, 2026. Pricing must be comprehensive, including all initial hardware, installation, and implementation costs within the original quote, though the government accepts a higher base-year price to account for these non-recurring expenses. Technical support is required to align with warehouse operating hours of 6:30 a.m. to 2:30 p.m. Award will be based on a comparative analysis of technical capability, price, and past performance, with a strict requirement that offerors be VetCert verified to be eligible for award.
Software Publishers

POSTED

3 days ago

DEADLINE

in about 12 hours
View Details
NAICS: 238110
New
Federal
554-27-117 Conduct Concrete and Civil Site Repairs.
Solicitation # 36C25926Q0826
Solicitation 36C25926Q0826 is a 100 percent set-aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB) to perform concrete and civil site repairs at the Rocky Mountain Regional VA Medical Center in Aurora, Colorado. The project, estimated between 100,000 and 250,000 dollars, involves comprehensive drainage remediation, sidewalk leveling, curb repair, and the removal and replacement of concrete sections to address trip hazards and improve snow removal. The scope of work includes 52 specific repair items and requires strict adherence to VA standards, AIA Construction Guidelines, and Joint Commission Environment of Care Standards. Performance must begin within 10 calendar days of award and be completed within 90 calendar days. The government will award the contract based on best value, evaluating offerors on price, past performance on at least two similar projects of 100,000 dollars or more within the last five years, and safety records, including an Experience Modification Rate (EMR) of 1.0 or less. Contractors must provide a Site Specific Safety Plan and ensure a competent person with a 30-hour OSHA card is on-site at all times. Proposals must be submitted via email to Elia L Ruiz Manzo by November 13, 2026, at 10:00 AM MT, and must include a signed SF-1442, a Limitations on Subcontracting certification, and past performance documentation.
Poured Concrete Foundation and Structure Contractors

POSTED

3 days ago

DEADLINE

in 14 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS