Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

J045--EMERGENCY Cooling Tower Repair Services at the Minneapolis VA Health Care System

Awarded
36C26326Q0662Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Minneapolis VA Medical Center is conducting market research to identify qualified vendors capable of providing comprehensive inspection, maintenance, repair, and training services for two cooling towers located in Building 69’s energy center. This initiative, identified by NAICS code 238220 with a $19.0 million small business size standard, seeks input from businesses to shape future acquisition strategies, including potential set-asides for Service-Disabled Veteran-Owned, Veteran-Owned, and other socio-economic small businesses. The scope of work involves shutdown coordination, mechanical and electrical inspections, replacement of gearboxes and water distribution components, power washing of all accessible parts without chemicals, fan balancing, and post-repair performance testing using calibrated instruments and qualified personnel. Training for VA staff must be delivered over up to two days and cover operation, preventive maintenance, winterization, and troubleshooting for both the EvapTech 3-cell and Marley 1-cell cooling tower models. Contractors are required to supply their own scaffolding or OSHA-approved lifts, adhere strictly to PPE requirements including hard hats, safety glasses, and hearing protection, secure all necessary permits, and ensure no interference with facility operations during work hours, which are scheduled outside normal business hours (6 a.m. to 5 p.m.) unless otherwise coordinated. All work must be completed within the proposed period of performance from June 1, 2026, to June 30, 2027, with responsiveness and speed of execution being favorable factors. Responses to this sources sought notice, due by May 14, 2026, must include the vendor’s SAM Unique Entity ID, socio-economic status (including SDVOSB, VOSB, WOSB, or other classifications), disclosure of any existing government contracts enabling service delivery, details on proposed subcontracting percentages and tasks, estimated lead time for completion, and completed pricing fields for the single line item described in the provided table. Contractors must submit a testing plan, schedule of tasks with milestones, material submittals and technical data sheets, MSDS for any chemicals, photographic documentation of work phases, maintenance logs, warranty certificates for new components, and a worksite access protocol. All deliverables must be submitted via email to [email hidden]; failure to respond fully to any of the five required questions will render the submission non-responsive. This notice is not a solicitation and no contract will be awarded based on these responses; however, the information received will directly inform the government’s

General Info

Minneapolis VA seeks contractors for cooling tower repair, maintenance, inspection, and staff training services.

Contract Value

$493,789

NAICS

238220 - Plumbing, Heating, and Air-Conditioning Contractors

Place of Performance

MN, USA

Set-Aside

NONE

Award Issued Date

Documents

4

Sources Sought - Cooling Tower Repair Services Minneapolis VA Medical Center 36C26326Q0662

DOCX, High priority: read this firstsources-sought
High

VA Sole Source Justification for Cooling Tower Maintenance - FAR 13.5

DOCX, High priority: read this firstjustification-and-authorization
High

Award 36C26326P0612 - Emergency Cooling Tower Repair Services

DOCX, Low priorityaward
Low

Attachment+A-+Tower+Schematic+Plan+View.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseAwarded
Posted

Sources Sought

Awarded

Contract was awarded

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Veterans Affairs → Network Contract Office 23 (36C263)
Contacts1 person available
OfficeSaint Paul, MN, 55101, USA
Office AddressSaint Paul, MN, 55101, USA
Contacts
Traci JohannesContracting Officer

Full Description

Show more
The Minneapolis VA Medical Center is conducting market research to obtain Repair Services to Cooling Towers as described in the Preliminary Statement of Work below.
This is a SOURCES SOUGHT NOTICE only looking for businesses to provide the services listed in the Preliminary Statement of Work below for market research purposes. No proposals are being requested or accepted with this notice. THIS IS NOT A SOLICITATION FOR PROPOSALS OR PRICING AND NO CONTRACT SHALL BE AWARDED FROM THIS NOTICE. This notice shall not be construed as a solicitation or as an obligation on the part of the Department of Veterans Affairs.
Responses to this notice will be treated only as information for the Government to consider as part of their market research efforts. The information provided will be used by the Government in developing its acquisition strategy regarding possible set aside for Service-Disabled Veteran-Owned, Veteran-Owned, and other socio-economic categories of small business. Interested parties are responsible for adequately marking proprietary, restricted or competition sensitive information contained in their response. The Government does not intend to pay for the information submitted in response to this notice and parties responding will not be entitled to payment for direct or indirect costs incurred in responding to this notice.
The North American Industry Classification System (NAICS) code for this requirement is 238220 Plumbing, Heating, and Air-Conditioning Contractors, with an SBA Small Business Size Standard of $19.0 Million.
If you are a vendor capable of providing the requested information and required services described below with competitive pricing, send your information with a description of proof of capability and answers to all questions to: contact@example.gov on or before Thursday, May 14, 2026 at 12:00 PM Central Time.
Please provide answers as appropriate to the following questions in the table below with your response to this Sources Sought. Failure to respond accurately to the following questions may affect the acquisition strategy. Failure to respond to the questions at all, or not respond to select individual questions, will result in your response being determined as non-responsive.
1.  Please provide all socio-economic categories of your firm (e.g., SDVOSB, VOSB, WOSB, Large Business, 8a, etc.) as well as your firm s SAM Unique Entity ID number (replaces DUNS number) and Government Contract POC. 2.  State whether the requested services may be ordered against a government contract awarded to your organization (e.g Federal Supply Schedule (FSS), General Services Administration (GSA), etc.). 3.  State if subcontracting is contemplated for this requirement, what percentage of the work will be subcontracted, and for what tasks. 4. Provide estimated lead time to deliver a fully functioning solution as described in the Preliminary Statement of Work below. Vendors responding to this notice must show they can complete every task in the Preliminary Statement of Work within the period of performance listed in the ITEM INFORMATION below. This procurement is time-sensitive. 5. Complete the yellow highlighted areas in the ITEM INFORMATION directly below this section for market research pricing for the services described in the Preliminary Statement of Work. ITEM INFORMATION ITEM NUMBER DESCRIPTION OF SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT 0001
1.00 JB $___________ $___________
Provide inspection, maintenance, repair, and training for cooling towers in accordance with the Statement of Work.
Contract Period: Base POP Begin: 06-01-2026 POP End: 06-30-2027 PRINCIPAL NAICS CODE: 238220 Plumbing, Heating, and Air-Conditioning Contractors PRODUCT/SERVICE CODE: J045 Maintenance, Repair, and Rebuilding of Equipment Plumbing, Heating, and Waste Disposal Equipment

Preliminary Statement of Work Introduction:
The Minneapolis VA Medical Center, at One Veterans Drive, Minneapolis MN, herein referred to as MPLS VAMC, is in need of a service contract that includes inspection, maintenance, repair, and training for MPLS VAMC staff. The Contractor shall provide services to ensure the cooling towers on building 69 are operating at optimal performance by conducting thorough cleaning, inspection, and replacement as needed of the gearbox, and water distribution systems, valves, any due and overdue maintenance, and conduct staff training for safe operation routine maintenance of the cooling tower.
Definitions:
Cooling towers: Referred to as the physical large unit. One is EvapTech, the other is Marley 1-cell sigma and will be referred to as Tower 1 and Tower 2, respectively. Cells: The units within the towers. There are a total of four (4) cells. Three (3) cells are in Tower 1, and one (1) cell is in Tower 2. A photo is supplied as attachment A. Qualified Person: means one who, by possession of a recognized degree, certificate, or professional standing, or who by extensive knowledge, training and experience, has successfully demonstrated his ability to solve or resolve problems relating to the subject matter, the work, or the project. Cleaning: Consists of power wash only, no chemicals. PPE: Personal Protective Equipment
Scope of Work:
Cooling Tower 1: EvapTech 3-cell FRP Counterflow Cooling Tower, model # _EC324-424G, Located in building 69 energy center on the ground. EvapTech 3-cell FRP structure counterflow cooling tower, each cell measuring approximately 24 long x 24 wide x 18 tall with a 6 air inlet, 4 of TechClean 312 PVC film fill, and a 15 diameter fan with a 7 stack, originally submitted as designed to cool 9,900 gpm of water from 95°F to 85°F at 78°F wet bulb with 40 horsepower. Requirements (Inspection, Maintenance, and Repair of Tower): Shutdown and isolation of the equipment Contractor shall obtain approval from the Contracting Officer s Representative (COR) and coordinate a schedule to shutdown any cells of the cooling tower to ensure the shutdown not effected on the efficiency of the chillers. Perform a comprehensive detailed mechanical, visual, functional, and electrical inspection that checks of all major components of the 3-cell counterflow cooling tower. Contractor shall provide an inspection report, within 4 - 6 days of the initial inspection completion. Report shall include photos of the areas that have been marked for repair. Repairs not addressed in this SOW shall be approved by the COR or CO prior to completing any repairs. Remove the existing gearboxes from each cell of the 3-cell EvapTech tower and replace in-kind with new Amarillo 135 gearboxes. New gear boxes shall have a 7:1 ratio and 304SS ¾ ball valve. Driveshafts shall be realigned within acceptable tolerance upon installation of the new gearboxes to manufacturers tolerances. Include all necessary work to ensure proper gearbox operation, including inspect, change, or fill the oil in the gearbox to correct level. Inspect and adjust the fan blade pitch of each of the three Hudson APT-15KW-5 fan assemblies within acceptable manufacture tolerance. Contractor shall include balancing the fans to reduce the vibration to the minimum required by the cooling tower design. Replace damaged water distribution system components found during the inspection of the tower. Clean the cold-water basin of each cell. Clean the components in each cell which include: Fan assemblies, motors, drift eliminators, fill media (exterior layers only), distribution components, accessible structural members (no fill removal), and air inlet louvers. Testing Tower-To verify the operational readiness performance, and safety of the cooling towers system after maintenance, repair, a replacement, or new installation work. Testing shall ensure compliance with manufacture specifications, project requirements and applicable safety standards. Contractor shall develop a testing plan and submit with response to solicitation. Ensure that all tests are conducted using calibrated instruments and by qualified personnel. Any deficiencies shall be corrected, and then the tower shall be retested at no additional cost to the government. Report shall be submitted to the COR and CO once testing is completed. Testing Reports: Includes vibration testing, flow rate, temperature readings, and operational tests after repair or replacement, and inspection.

Cooling tower 2: Marley 1-cell Sigma FRP crossflow cooling tower, model # 126-111, building 69 energy center on the ground. Requirements (Inspection, Maintenance, and repair of tower): a. Perform a detailed mechanical inspection of the 1-cell crossflow cooling tower. An inspection report, which will follow within 4 - 6 days of the inspection completion and shall include photos of the areas that have been marked for repair. b. Adjust the fan blade pitch of the fan assembly within manufacturers tolerance and include balancing. c. Clean the cold-water basin. d. Remove the (2) existing 12 horizontal control valves and replace with new 12 HDG horizontal control valves. e. Clean the following components: Fan assembly, motor, drift eliminators, fill media (exterior layers only), distribution components, accessible structural members (no fill removal), and air inlet louvers. f. Remove the existing Marley 2700 series gearbox from the tower and replace in-kind with a new Marley 2700 series gearbox. g. Replace damaged water distribution system components found during the inspection of the tower. Testing Tower-To verify the operational readiness performance, and safety of the cooling towers system after maintenance, repair, a replacement, or new installation work. Testing shall ensure compliance with manufacture specifications, project requirements and applicable safety standards. Contractor shall develop a testing plan and submit with response to solicitation. Ensure that all tests are conducted using calibrated instruments and by qualified personnel. Any deficiencies shall be corrected, and then the tower shall be retested at no additional cost to the government. Report shall be submitted to the COR and CO once testing is completed. Testing Reports: Includes vibration testing, flow rate, temperature readings, and operational tests after repair or replacement, and inspection. Contractor furnished Training for MPLS VAMC staff Contractor shall provide a technical advisor for up to 2 days, to provide training in the operation of both the Marley and EvapTech cooling towers. Comprehensive training for the site personnel shall be focused on the proper procedure for maintaining the cooling towers, including routine checks, preventive maintenance tasked, devices required for the tests, and basic troubleshooting. All service and training shall be conducted in accordance with applicable safety, health, and environmental regulations. Training topics to include but not limited to: Tower types, heat load, CT components (structure, heat transfer, drift elimination, water distribution, and mechanical equipment), and operation and maintenance of the cooling tower (winterization/preventative maintenance). Contractor responsibilities: The contractor shall provide all necessary equipment, tools, and labor to complete the scope of work related to the cooling towers in accordance with the project specifications and safety requirements. Note- Due to the height of the towers the contractor will be required to provide scaffolding or an OSHA-approved lift to transport contracted employees, equipment, and supplies to the necessary work areas. MPLS VAMC will not be responsible for supplying this equipment. The contractor is responsible for completing the scope of work outlined in this contract. Ensure all contractor employees wear proper PPE. Shall include, but not limited to: a. Hard Hats unless written authorization is given by the COR in circumstances of work operations that have limited potential for falling object hazards such as during finishing work or minor remodeling. With authorization to relax the requirement of hard hats, if a worker becomes exposed to an overhead falling object hazard, then hard hats would be required in accordance with the OSHA regulations. b. Safety glasses - unless written authorization is given by the COR in circumstances of no eye hazards, appropriate safety glasses meeting the ANSI Z.87.1 standard must be worn by each person on site. c. Appropriate Safety Shoes based on the hazards present, safety shoes meeting the requirements of ASTM F2413-11 shall be worn by each person on site unless written authorization is given by the COR in circumstances of no foot hazards. d. Hearing protection - Use personal hearing protection at all times in designated noise hazardous areas or when performing noise hazardous tasks. Ensure contractor meets or exceeds all Federal, state, and local requirements. Such as pulling all required permits to complete the work, providing Scaffolding that meets or exceeds OSHA standards governed by OSHA Standard 29 CFR 1926 Subpart L, which sets out the legal requirements for the design, erection, use, and dismantling of scaffolding systems in construction. Contractor is responsible for any fines and fee s that occur if requirements are not met properly. Contractors provided under this contract are employees of the Contractor and shall not be considered VA employees. Contractors working on VA property shall be subject to the same rules and regulations as all contracted employees. Parking is allowed only in areas not designated for patient use. All traffic laws and parking rules on the grounds are strictly enforced. Failure to follow these laws and regulations may result in a citation being issued that will have to be resolved through the Federal Court system. Prior to reporting to work, the Contractor will need to contact the designated point of contact for the ordering facility to arrange an escort to the on-site badging department. VA staff will issue a temporary ID badge to the contracted employee, who will properly display the badge while working onsite. Upon completion of the assignment, the employee will return the badge. The VA reserves the right to refuse any Contractor access to VA property, for any or no reason. Contractors shall comply with all security requirements imposed by the ordering facility. Contractors shall not receive personal telephone calls or texts on their cell phone while rendering services. A VA employee must accompany Contractors who are providing services. The Contractor shall remove and dispose of any waste related to providing the ordered services. Contractor Furnished reports: Before work inspection report After work inspection reports: Mechanical operational test results Electrical Testing results Hydraulic testing results Thermal Performance Test Results Vibration and noise level testing results Water Quality testing results Visual and physical inspection results Contractor shall furnish works schedule. Schedule shall describe all tasks and include timeline with key milestones. Contractor s with quicker completion date shall be found more favorable than contractors with longer completion dates. Permits to complete work: Hot work permit (welding, cutting) Confined space entry permit Lockout/Tagout permit for equipment isolation Contractor shall provide material Submittals and Technical Data Sheets (TDS): include manufacture specifications for replacement parts and materials. Contractor shall provide: MSDS (Material Safety Data Sheets): for chemicals used in cleaning, disinfection, or water treatment ensures proper handling and safety. Contractor shall keep Photographic Records: Photos taken before, during, and after work for documentation and quality verification. Contractor shall keep updated Maintenance Log / Asset Register: Records of replaced parts, serial numbers, service history, and future maintenance tracking. Contractor shall supply to COR Warranty Certificates: From manufacturers or contractors for newly installed or repaired components. Contractor shall ensure that their employees wear contractor badge at all times while on VA premises. Badge shall be displayed above the waste or below the neck to be appropriately worn.
Work Schedule/Timelines
Contractor shall submit overall schedule for the project with their response to the solicitation that includes inspection, maintenance, repair, and training. Timelines shall be a part of the technical evaluation completed by the technical evaluation team. In events where a cooling tower is difficult to access requires shutdowns, or additional life safety and infection control measures; the Contractor is responsible for arranging all access, providing all required construction barriers, and coordinating shutdowns to not interfere with continuity of operations. Hours of Operation: Anticipated hours of work shall take place Monday to Friday outside normal business hours (normal business are defined as 6am to 5pm). Weekends and holiday work shall be coordinated with COR if contractor is required to work on them. Federal holidays are: New years day, Birthday of Martin Luther King jr., Washington s birthday, Memorial Day, Juneteenth, Independence Day, Labor Day, Columbus Day, Veterans Day, Thanksgiving Day, Christmas Day, and any other day declared a federal/ national day by the president. MPLS VAMC s goal is to have all maintenance and repair completed prior to major heat waves coming to Minneapolis, as the current condition of the towers cannot support the facility s cooling needs.

Similar Contracts

Same NAICS industry code

NAICS: 238220
New
CBP#9772 HVAC Air Handling Unit (AHU) and Ductwork Cleaning Services
Solicitation # CBP#9772
Management & Training Corporation (MTC) is soliciting bids for solicitation CBP#9772 to provide HVAC Air Handling Unit (AHU) and ductwork cleaning services at the Edison Job Corps Center in Edison, New Jersey. This fixed-price, single lump sum subcontracting opportunity has an estimated value between $100,000 and $250,000. The scope of work requires the thorough cleaning of twelve AHUs and associated coils and ductwork across the Kilmer and Edison Dormitories. Key deliverables include pre-cleaning inspections documented with photographs, the installation of permanent corrosion-resistant access panels, and a final project report. The contractor must complete all work within 90 consecutive business days following a written Notice to Proceed. Bids are due by November 17, 2026, and will be awarded based on overall best value. A mandatory physical site visit and signature on the attendance roster are required prior to bid submission. For bids equal to or greater than $25,000, a bid bond of 20% of the base bid is required, and the awarded contractor must provide performance and payment bonds from a surety company with at least an A- rating. The project is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certifications. Compliance with Davis-Bacon prevailing wage determinations for Middlesex County and various FAR clauses regarding security, privacy, and the Buy American Act is mandatory. Final acceptance is contingent upon a written confirmation from the Center following a successful inspection of the operational status of the equipment and the restoration of work areas.
Edison Job Corps

POSTED

about 3 hours ago

DEADLINE

in 19 days
View Details
NAICS: 238220
New
WOJC - Multi-Building Plumbing Leak Repair Project
Solicitation # WOJC – Multi-Building Plumbing Leak Repair Project
Education and Training Resources is seeking quotes for a subcontracting opportunity to perform multi-building plumbing leak repairs at the Westover Job Corps Center in Chicopee, Massachusetts. The scope of work includes replacing leaking shower P-trap drain pipes in Harris Hall dormitory (Rooms 123 and 213), repairing a cracked drain pipe in the pipe chase of Room 216, and replacing heat pipe sections in both the Administration Building and King Hall. All work must comply with the Massachusetts State Plumbing Code, International Plumbing Code, and OSHA safety standards, including lock-out/tag-out procedures. Contractors are responsible for providing all new commercial-quality materials and must repair any facility damage caused during performance at no additional cost. Bids are due by October 30, 2026, and must include a detailed cost breakdown on a Bid Sheet, a proposed service schedule, and proof of required Massachusetts licensing. Evaluation is based on cost, qualifications, and administrative compliance, with ETR serving as the sole judge for the award. Mandatory submission requirements include a SAM.gov UEI number, active registration, W-9, business licenses, and certificates of liability insurance. Depending on the project value, payment and performance bonds may be required for contracts exceeding 35,000 dollars. The project is subject to federal regulations, including the Davis-Bacon Act and Service Contract Act, requiring the submission of weekly certified payroll reports.
Westover Job Corps Center

POSTED

about 3 hours ago

DEADLINE

in about 2 hours
View Details
NAICS: 238220
New
MJCC EXHAUST FANS BLD. 1429
Solicitation # mjcc-exhaust-fans-bld-1429
The Muhlenberg Job Corps Center, operated by Insights Training Group LLC, is soliciting fixed price quotes from qualified HVAC and mechanical contractors to restore the exhaust fan and louver systems in Building 1429 located in Kentucky. The scope of work includes inspecting, repairing, and replacing various components across eight exhaust fans, specifically addressing failed louver actuators, motors, thermostats, blades, and guards. Contractors must ensure all equipment is fully operational and provide all necessary training and maintenance manuals. The project requires adherence to applicable building codes, manufacturer requirements, and OSHA and EPA regulations, including strict chemical management and the maintenance of Material Safety Data Sheets. This is a small business set-aside solicitation open to VOSB, SDVOSB, WOSB, and HUBZone certified entities. Award will be granted to the responsible offeror with a technically acceptable quote at the lowest price. Proposals must be submitted by October 30, 2026, and include a detailed cost breakdown, evidence of Kentucky state licensing, and proof of bonding capability. The contract is subject to the Davis-Bacon Act and FAR 22.403-1-CWRR, requiring the submission of weekly certified payroll with every invoice. Final payment is contingent upon satisfactory performance and the delivery of lien releases from all subcontractors and suppliers.
Muhlenberg Job Corps Center / Insights Training Group LLC

POSTED

about 3 hours ago

DEADLINE

in about 2 hours
View Details
NAICS: 238220
New
Centennial Dry Sprinkler System & Compressor Replacement Services
Solicitation # centennial-dry-sprinkler-system-compressor-replacement-services
Management & Training Corporation is soliciting bids for a fixed-price, single lump sum subcontract to provide dry-type sprinkler system and compressor replacement services at the Centennial Job Corps Center in Nampa, Idaho. The project scope involves the demolition and removal of existing distribution piping and air compressors in the Men's Dormitory, Women's Dormitory, and Recreation Building, followed by the installation of a new piping network and a code-approved air compressor. All work must adhere to NFPA 25 (2023 Edition) standards and local, state, and national codes. The selected contractor must complete all work within 30 consecutive business days following the written Notice to Proceed. Bids are due by December 1, 2026, and will be evaluated based on overall best value. Prospective bidders must conduct a mandatory physical site visit and sign an attendance roster to be considered. For bids equal to or greater than $25,000, a bid bond guarantee of 20% of the base bid is required at the time of submission, and performance and payment bonds from an A-rated surety will be required upon award. The solicitation is set aside for HUBZone, Woman-owned, and Service-Disabled Veteran-owned small businesses. Contractors must comply with prevailing wage rates per the Davis-Bacon Act and submit weekly certified payroll reports to receive payment. Required documentation for award includes a detailed cost breakout, proof of insurance, a UEI number, and a completed SF 1413 form. Final payment is contingent upon a successful final inspection, the submission of operation and maintenance manuals, and the delivery of a certificate of release of liens. First-tier subcontractors with awards exceeding $45,000 must also provide disclosures regarding debarment and suspension per FAR 52.209-6.
Management & Training Corporation/Centennial Job Corps Center

POSTED

about 3 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 238220
New
Dorm Hot Water Tank Replacement – Glenmont Job Corps Center – S26-006
Solicitation # S26-006
Adams and Associates, Inc. is seeking qualified mechanical and plumbing contractors for a subcontracting project at the Glenmont Job Corps Center in Glenmont, New York. The scope of work involves the removal and disposal of four existing 505-gallon domestic hot water storage tanks and the installation of four new 500-gallon insulated storage tanks, with two tanks per dormitory. Additionally, the contractor must replace four heat exchangers and install one new bronze Bell and Gossett circulator pump in the North Dormitory. Comprehensive services required include piping modifications using ProPress materials, electrical disconnections and reconnections, insulation matching existing standards, rigging, and the provision of a temporary hot water heater to ensure the facility remains operational during the estimated construction period of two and a half to three weeks. Proposals are due by November 9, 2026, at 4:00 PM ET, following a pre-proposal site walkthrough on October 29, 2026. Award selection is based on a weighted evaluation of price (60 percent), quality (20 percent), past performance (10 percent), and schedule (10 percent), meaning the lowest price does not guarantee selection. Contractors must comply with New York State statutory insurance requirements, Davis-Bacon prevailing wage determinations, and strict center security and safety regulations, including a no-fraternization policy with students. Required submission documents include a completed vendor questionnaire with UEI and NAICS codes, a current W-9, and applicable New York State licenses. Payment terms are Net 30 days upon completion and receipt of invoice.
Adams and Associates, Inc.

POSTED

about 3 hours ago

DEADLINE

in 11 days
View Details
NAICS: 238220
New
MJCC HVAC BLD. 1403-04 B HALL
Solicitation # mjcc-hvac-bld-1403-04-b-hall
Insights Training Group LLC, on behalf of the Muhlenberg Job Corps Center in Kentucky, is soliciting fixed-price quotes for an HVAC project at Building 1403-04 B Hall. The scope of work requires the contractor to furnish and install two 4-ton Trane 17 SEER (minimum) twinned split systems using R-454B refrigerant, including two 95% AFUE high-efficiency gas furnaces, matching indoor evaporator coils, and one Honeywell Pro 8000 programmable thermostat with a remote sensor. The project also encompasses the installation of new refrigerant line sets, exterior line hide, and necessary condensate management systems. All work must be completed within 45 days of award and adhere to manufacturer specifications, local codes, and OSHA and EPA regulations. The contract will be awarded to the responsible offeror whose quote is technically acceptable and represents the lowest price. To be considered, bidders must provide evidence of Kentucky state licensing and registration, a minimum 90-day bid guarantee, proof of ability to secure performance and payment bonding, a completed New Vendor Profile, and a W-9. The project is subject to Davis-Bacon Act labor standards, requiring the submission of weekly certified payroll and a signed Statement of Compliance with every invoice. Final acceptance is contingent upon a substantial completion walk-through by the center director, the provision of all operating and maintenance manuals, and the verification of proper zoning and temperature control. Quotes are due by October 30, 2026, at 5:00 PM.
Muhlenberg Job Corps Center / Insights Training Group LLC

POSTED

about 3 hours ago

DEADLINE

in about 2 hours
View Details
NAICS: 238220
New
Roswell JCC – Male Dormitory Bldg. Water Source Heat Pump Replacement (20 units)
Solicitation # roswell-jcc-male-dormitory-bldg-water-source-heat-pump-replacement-20-units
The Career Systems Development Corporation is soliciting proposals for the total replacement of twenty ceiling-mounted water source heat pumps at the Roswell Job Corps Center Male Dormitory Building 558 in New Mexico. The scope of work involves the removal and off-site disposal of twenty failed units and the installation of new Bosch 1-ton units or an equivalent model. Additionally, the contractor must install smoke dampers with fusible links in all vents leading into the plenum and ensure all installed plenum materials are plenum rated. All work must comply with NFPA 101, NFPA 70, and applicable plumbing, mechanical, and building codes. This solicitation is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. The project is subject to the Davis Bacon Act Wage Determination NM20260014, requiring the submission and approval of weekly certified payroll reports prior to invoice payment. Proposals exceeding 100,000 dollars require 100 percent payment and performance bonding upon award. Submissions must include a safe work process, detailed material and labor costs, total project cost, equipment cut sheets, warranty information, and a proposed payment schedule. Final deliverables include the operation manuals provided to the Facility Manager upon completion.
Career Systems Development Corporation

POSTED

about 3 hours ago

DEADLINE

in 8 days
View Details
NAICS: 238220
New
WOJC – Buried Domestic Hot Water (DHW) Pipe Repair
Solicitation # wojc-buried-domestic-hot-water-dhw-pipe-repair-0
Education & Training Resources is seeking quotes for a subcontracting opportunity to repair buried domestic hot water piping at the Westover Job Corps Center in Chicopee, Massachusetts. The scope of work requires the contractor to provide all labor, materials, equipment, and supervision to excavate, locate, remove, and repair compromised piping up to 4 inches in diameter at two specific locations: behind Singletary Hall and on the east side of Harris Hall. The project includes insulation and a one-year warranty on equipment and workmanship. Bidders must adhere to industry standards, OSHA regulations, and the National Electrical Code and NFPA Standard No. 101. Interested parties must submit their bids by November 6, 2026, to Garrett Owens. A complete proposal must include a detailed cost breakdown on a Bid Sheet, a proposed service schedule, Massachusetts licensing, certificates of insurance, and a completed vendor packet including a W-9 and Anti-Lobbying Certification. The winning bidder must possess an active SAM.gov registration and a Unique Entity ID. This is a small business set-aside opportunity that requires compliance with the Davis-Bacon Act or Service Contract Act, including the submission of weekly certified payroll reports. Award selection is at the sole discretion of ETR and is not based solely on the lowest bid.
Westover Job Corps Center

POSTED

about 3 hours ago

DEADLINE

in 7 days
View Details

More opportunities from Department Of Veterans Affairs → Network Contract Office 23 (36C263)

Same awarding agency

NAICS: 811310
New
Federal
J039--JLG Boom Lift Hydraulic Leak Repairs - STC (VA-27-00010304)
Solicitation # 36C26327Q0084
The Department of Veterans Affairs, Network Contracting Office 23, is issuing a sources sought notice for market research to identify qualified contractors for hydraulic repairs on a JLG Boom Lift, Model 600S, at the St. Cloud VA Health Care System in Minnesota. Under NAICS code 811310, the required services include replacing all hydraulic hoses through the cat track, replacing the hydraulic line from the pump to the block, replacing hydraulic oils, and updating the basket display decal and operator and ANSI manuals. The selected contractor must be located within a 100-mile radius and will be responsible for the pickup and delivery of the equipment to and from the St. Cloud VA campus. All repairs must be completed within three weeks of the contract award and must meet industry and manufacturer operational standards. This notice is not a formal solicitation and does not obligate the government to award a contract. Interested parties must submit their company information, including DUNS and SAM Unique Entity ID, a capability statement, and their socio-economic size classification to Contract Specialist Evan Beachy by 4:00 PM Central Time on November 04, 2026. Additionally, respondents should specify if the procurement can be handled through GSA, FSS, SEWP, or other existing contract vehicles. Responses are intended solely for planning purposes to help the government make informed acquisition decisions.
Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance

POSTED

1 day ago

DEADLINE

in 6 days
View Details
NAICS: 811210
New
Federal
J065--Karl Storz Support Services IDIQ VISN
Solicitation # 36C26327Q0022
The Department of Veterans Affairs Network Contracting Office 23 is soliciting a brand-name only, five-year Indefinite Delivery, Indefinite Quantity (IDIQ) contract for OEM-certified support and service of Karl Storz OR1 Video Integration Systems across the VISN 23 Healthcare System. This requirement, managed under simplified acquisition procedures, covers multiple locations including Minneapolis, St. Cloud, Fargo, Central Iowa, Iowa City, Black Hills, and Sioux Falls. The scope of work includes preventive and corrective maintenance, replacement parts, software and firmware updates, cybersecurity compliance, and technical training for clinical and biomedical staff. The contract has a guaranteed minimum value of 300,000 dollars and a maximum lifetime cost limitation of 5,600,000 dollars. Award will be based on a comparative evaluation of price and technical factors, including vendor qualifications, cybersecurity capabilities, and service level agreement response times. The contractor must adhere to strict OEM standards, NIST calibration requirements, and VA security policies, including the submission of cybersecurity artifacts and a signed Business Associate Agreement for HIPAA compliance. Performance will be monitored via a Quality Assurance Surveillance Plan targeting 98.9 percent operational uptime and 99 percent response time rates. Offers are due by November 11, 2026, and must include a signed SF 1449, completed pricing schedules, and proof of OEM certification for technicians.
Electronic and Precision Equipment Repair and Maintenance

POSTED

2 days ago

DEADLINE

in 13 days
View Details
NAICS: 238330
New
Federal
Replace Operating Room 5 Flooring
Solicitation # 36C26327Q0019
Solicitation 36C26327Q0019 is a Service-Disabled Veteran-Owned Small Business set-aside for the Department of Veterans Affairs, Network Contracting Office 23. The project involves providing all labor, materials, tools, and supervision to remove and replace the flooring and subflooring in Operating Room 5 (Room 4211, Building 1W) at the Des Moines VA Medical Center in Iowa. The work must be completed within 120 calendar days following the Notice to Proceed. Award will be granted to the responsible, eligible quoter who submits the lowest-priced acceptable quotation that meets all solicitation requirements, provided the price is determined to be fair and reasonable. Key technical requirements include conducting asbestos survey testing, adhering to the Architectural Design Manual, and utilizing certified installers through INSTALL or a comparable four-year apprenticeship program. The contractor must provide a floor tile mockup of 100 square feet to establish quality standards and comply with strict packaging and marking regulations for asbestos waste and HEPA filters. Administrative requirements include the submission of an Accident Prevention Plan and Site-specific Safety Plan for COR approval, as well as the provision of payment bonds or irrevocable letters of credit for contracts exceeding 35,000 dollars. The contract is subject to the Davis-Bacon Act and Buy American requirements, with specific limitations on subcontracting to ensure a minimum of 15 percent of the work is performed by the prime SDVOSB contractor.
Flooring Contractors

POSTED

2 days ago

DEADLINE

in 5 days
View Details
NAICS: 238220
New
Federal
J045--Glycol Loop Flushing - NWI
Solicitation # 36C26327Q0060
Solicitation 36C26327Q0060 is a firm fixed price request for quotation issued by the Department of Veterans Affairs Network Contracting Office 23 for the flushing, cleaning, and recharging of two closed-loop glycol heating systems, specifically the Surgery and Microbiology loops, at the Omaha VA Medical Center. The project requires the contractor to provide all labor, materials, equipment, and disposal handling to restore the systems to a stable operating condition using propylene glycol-based heat transfer fluid. The anticipated period of performance runs from November 1, 2026, to October 31, 2027, with the initial service required within 30 calendar days of award and a second identical service performed approximately 12 months later. Work must be conducted during normal business hours when temperatures exceed 40 degrees Fahrenheit and must comply with NFPA-99, ASHRAE 170, CMS, JCAHO, and VA HVAC Design Manual standards. This procurement is a total set-aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB), with strict limitations prohibiting the contractor from paying more than 50 percent of the government-paid amount to non-certified SDVOSB or VOSB firms. Award will be based on a comparative evaluation of price, technical quality, past performance, and veterans involvement. Key deliverables include pre-flush fluid sampling reports, system volume calculations, refractometer readings, and disposal manifests. Following Amendment 0001, the response deadline has been extended to November 10, 2026. Proposals must be submitted electronically to the contracting officer and include separate volumes for administrative documents, technical and past performance narratives, a subcontracting statement, and a labor standards statement confirming compliance with Service Contract Labor Standards.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

6 days ago

DEADLINE

in 12 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS