J061--Triennial Electrical Inspection for VA Wilkes-Barre

Awarded
36C24426Q0250Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract, titled J061—Triennial Electrical Inspection for VA Wilkes-Barre, is a Firm-Fixed Price award issued under the Lowest-Price Technically Acceptable (LPTA) evaluation method to a Service-Disabled Veteran-Owned Small Business Set Aside, with the NAICS code 238210 and a solicitation number of 36C24426Q0250. It requires the contractor to conduct comprehensive triennial electrical inspections at the Wilkes-Barre VA Medical Center, located at 1111 E. End Blvd., Wilkes-Barre, PA 18711, within six months of contract award, with a total period of performance of twelve months. All work must comply with ANSI/NETA MTS-2015, VHA Directive 1028, OSHA 29 CFR 1910 and 1926, NFPA 70E, CSA Z462, and ASTM F1506 standards, with all testing performed on de-energized equipment unless otherwise specified. The contractor must submit a Gantt Chart for approval, maintain calibrated tools and PPE, and immediately report critical deficiencies. Deliverables include a final written report and documentation verifying compliance with all technical and safety requirements. The contract mandates strict adherence to subcontracting limitations under FAR 52.219-14 and VAAR 852.219-71, restricting payments to non-SDVOSB/VOSB subcontractors to no more than 75% of total contract value, excluding material costs. Offerors must hold current SBA certification as an SDVOSB and submit a signed certification with their proposal; failure to do so renders the offer ineligible. Invoicing is required electronically through the Tungsten e-Invoice Network under VAAR 852.232-72, with payment processed via Electronic Funds Transfer. The contracting office is the Department of Veterans Affairs, Network Contracting Office 4, Services 2, located in Philadelphia, PA, with Allan Tabliago listed as the primary Contract Specialist. There is no identified Contracting Officer’s Representative, and the contract includes clauses related to whistleblower protections, conflicts of interest, prohibited subcontractor relationships, and security prohibitions, with multiple deviations noted in standard FAR clauses. The place of performance is FOB DESTINATION, meaning ownership and responsibility transfer upon arrival

General Info

J061 electrical inspection contract for VA Wilkes-Barre with DEI clause enforcing non-discrimination compliance.

Contract Value

$254,817

NAICS

811310 - Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance

Place of Performance

PA, USA

Set-Aside

SDVOSBC

Award Issued Date

Documents

24

36C24426Q0250 Amendment 0002 - Triennial Electrical Inspection for VA Wilkes-Barre

DOCX, High priority: read this first3 pages · amendment
High

36C24426Q0250 Amendment 0008 - Triennial Electrical Inspection for VA Wilkes-Barre

DOCX, High priority: read this firstamendment
High

36C24426Q0250 Amendment 0009 - Triennial Electrical Inspection for VA Wilkes-Barre

DOCX, High priority: read this first3 pages · amendment
High

36C24426Q0250 Amendment 0010 - Triennial Electrical Inspection

DOCX, High priority: read this first3 pages · amendment
High

36C24426Q0250 - Triennial Electrical Inspection Services

PDF, High priority: read this first43 pages · rfq
High

693-23-105 Arc Flash Study - Wilkes-Barre VAMC

PDF, High priority: read this first23 pages · specifications
High

Amendment 0001 to Solicitation 36C24426Q0250 for Triennial Electrical Inspections VA Wilkes-Barre

DOCX, High priority: read this first3 pages · amendment
High

Amendment 0003 to RFQ 36C24426Q0250 for Triennial Electrical Inspection VA Wilkes-Barre

DOCX, High priority: read this first3 pages · amendment
High

Amendment 0004 to Solicitation 36C24426Q0250 - Triennial Electrical Inspection VA Wilkes-Barre

DOCX, High priority: read this first6 pages · amendment
High

Amendment 0005 to Solicitation 36C24426Q0250 for Triennial Electrical Inspection VA Wilkes-Barre

DOCX, High priority: read this first3 pages · amendment
High

Amendment 0006 to RFQ 36C24426Q0250 for Triennial Electrical Inspection VA Wilkes-Barre

DOCX, High priority: read this first3 pages · amendment
High

Amendment 0007 to RFQ 36C24426Q0250 for Triennial Electrical Inspection VA Wilkes-Barre

DOCX, High priority: read this first5 pages · amendment
High

Amendment 0011 to Solicitation 36C24426Q0250 for Electrical Inspection SOW

DOCX, High priority: read this first8 pages · amendment
High

Amendment 0012 to Solicitation 36C24426Q0250 for Electrical Inspection SOW rev.2

DOCX, High priority: read this first8 pages · amendment
High

Amendment 0013 to Solicitation 36C24426Q0250 for Triennial Electrical Inspection VA Wilkes-Barre

DOCX, High priority: read this first3 pages · amendment
High

ANSI/NETA MTS-2023 Maintenance Testing Specifications

PDF, High priority: read this first104 pages · specifications
High

ANSI/NETA MTS-2023 Maintenance Testing Specifications

PDF, High priority: read this first48 pages · specifications
High

Price Cost Schedule for Electrical Testing Services

DOCX, High priority: read this first1 page · price-cost-schedule
High

Protective Device Setting Adjustments Report

PDF, High priority: read this first34 pages · specifications
High

RFQ 36C24426Q0250 Triennial Electrical Inspection Services for VA Wilkes-Barre

DOCX, High priority: read this first3 pages · rfq
High

SCA Wage Determination No. 2015-4239 Rev31 for Pennsylvania

PDF, High priority: read this first6 pages · wage-determination
High

VAAR 852.219-75 Notice of Limitations on Subcontracting

DOCX, High priority: read this first2 pages · other
High

Wilkes-Barre VA Medical Center - Electrical Power Distribution System Equipment Inventory

PDF, High priority: read this first6 pages · specifications
High

36C24426P0318 - Triennial Electrical Inspection for VA Wilkes-Barre

DOCX, Low priorityaward
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

15 updates
PhaseAwarded
Posted

Combined Synopsis

Notice updated

Response deadline changed from Mar 6, 2026 to Mar 13, 2026. The notice title changed. The notice description changed.

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Mar 13, 2026 to Mar 20, 2026. The notice title changed. The notice description changed.

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Mar 20, 2026 to Mar 27, 2026. The notice description changed.

Notice updated

Response deadline changed from Mar 27, 2026 to Apr 3, 2026. The notice description changed.

Notice updated

Response deadline changed from Apr 3, 2026 to Apr 10, 2026. The notice description changed.

Notice updated

Response deadline changed from Apr 10, 2026 to Apr 17, 2026. The notice description changed.

Notice updated

Response deadline changed from Apr 17, 2026 to Apr 24, 2026. The notice description changed.

Notice updated

Response deadline changed from Apr 24, 2026 to May 1, 2026. The notice description changed.

Notice updated

Response deadline changed from May 1, 2026 to May 8, 2026. The notice description changed.

Notice updated

Response deadline changed from May 8, 2026 to May 15, 2026. The notice description changed.

Notice updated

NAICS code changed from 238210 to 811310. The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Awarded

Contract was awarded

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Veterans Affairs → 244-NETWORK Contract Office 4 (36C244)
Contacts1 person available
OfficePITTSBURGH, PA, 15215, USA
Office AddressPITTSBURGH, PA, 15215, USA
Contacts
Allan TabliagoContract Specialist

Full Description

Show more
5. PROJECT NUMBER (if applicable) CODE 7. ADMINISTERED BY 2. AMENDMENT/MODIFICATION NUMBER CODE 6. ISSUED BY 8. NAME AND ADDRESS OF CONTRACTOR 4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE 9A. AMENDMENT OF SOLICITATION NUMBER 9B. DATED PAGE OF PAGES 10A. MODIFICATION OF CONTRACT/ORDER NUMBER 10B. DATED BPA NO. 1. CONTRACT ID CODE FACILITY CODE CODE Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers E. IMPORTANT: is extended, (a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended. 12. ACCOUNTING AND APPROPRIATION DATA (REV. 11/2016) is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A. 15C. DATE SIGNED B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b). RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified. C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF: D. OTHER Contractor 16C. DATE SIGNED 14. DESCRIPTION OF AMENDMENT/MODIFICATION 16B. UNITED STATES OF AMERICA Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect. 15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER 15B. CONTRACTOR/OFFEROR STANDARD FORM 30 PREVIOUS EDITION NOT USABLE Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.) (Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.) (If required) (SEE ITEM 11) (SEE ITEM 13) (X) CHECK ONE 13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS, IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. 11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT (Signature of person authorized to sign) (Signature of Contracting Officer)
3 10
0012 05-12-2026

None 36244 Department of Veterans Affairs Network Contracting Office 4 Services 2 3900 Woodland Ave. Philadelphia PA 19104 Allan Tabliago | +1 (555) 000-0000 contact@example.gov 36244 Department of Veterans Affairs Network Contracting Office 4
To all Offerors/Bidders




36C24426Q0250


X
X
X








1. The purpose of the amendment is used to incorporate the Statement of Work (SOW) rev.2. 2. Paragraph 2.2 includes "The contractor and its employees shall be certified by the International Electrical Testing Association (NETA) or equivalent certifying organization." 3. Paragraph 2.3 includes "Each of the contractor s on-site crew leaders shall hold a current certification. This certification shall be in accordance with ANSI/NETA ETT, Standard for Certification of Electrical Testing Technicians."
Stephanie Luniewski Contracting Officer



Page 1 of
Page 8 of 8
Page 1 of
DEPARTMENT OF VETERANS AFFAIRS WILKES-BARRE VA MEDICAL CENTER Statement of Work (SOW) rev.2 for Maintenance, Inspection and Testing of the Electrical Power Distribution System
Introduction: This Statement of Work (SOW) describes the requirements for the maintenance, inspection, testing, and calibration of the Electrical Power Distribution System and all of its components at the Wilkes-Barre VA Medical Center (WBVAMC) in Wilkes-Barre, Pennsylvania. These work items are/may be referenced as Maintenance and Testing in this document, hereafter.
This SOW describes the requirements for the Qualified Professional Electrical Contractor known hereafter as Contractor in this document. Contractor who is contracted by the WBVAMC to perform maintenance and testing of the Electrical Power Distribution System, and all of its components shall meet all requirements stated in Section II of this SOW.
This SOW describes the requirements to establish maintenance and testing reports.
Qualifications for Contractors:
The Contractor shall be an experienced Electrical Contractor having been properly trained and have permanent staff required to perform the proposed work. Electrical Contracting (i.e., the construction, repair, testing and maintenance of industrial and commercial electrical distribution systems) shall be the primary interest/specialty of the Contractor s core business operation.
The contractor and its employees shall be certified by the International Electrical Testing Association (NETA) or equivalent certifying organization. Employee certification requirements are as follows:
Supervisors: Level 4 Senior Certified Electrical Testing Technician Technicians: Level 3 Certified Electrical Testing Technician or Level 4 Senio Certified Electrical Testing Technician Apprentices: Level 2 Certified Assistant Electrical Testing Technician
All personnel on site shall have completed the Occupational Safety & Health Administration (OSHA) approved 10-hour construction safety training. There shall be at least one crew leader with OSHA 30-hour safety training certification present at the job sites at all times.
Contractor s field service engineers and technicians shall have technical training and demonstrable track records of working experience in the maintenance, inspection, and testing of complex Electrical Power Distribution Systems and related components in healthcare, industrial, educational, and commercial facilities.
Electrical components on which the Contractor s personnel shall have experience include, but are not limited to, medium and low voltage switch gear & switchboards; motor control centers; busways; power distribution panelboards; low voltage controls; emergency and standby generators; automatic transfer switches, wiring, transformers, meters, and other electrical appurtenances. Contractor s personnel shall be capable of the following: (1) testing, assessing, evaluating, servicing and reconditioning components, (2) assuring that the equipment on which work has been performed is safe, reliable and acceptable for its intended purpose, and (3) identifying defective equipment and potential safety problems, environmental hazards or code violations.
Contractor personnel shall have safety training either on-the-job or class-room type - in electrical safety outlined in the OSHA Standard 29 Code of Federal Regulations (CFR) 1910 Subpart S Electrical, and the NFPA 70E Standard for Electrical Safety in the Workplace. The Contractor s safety lead person shall be identified, and a safety briefing shall be conducted prior to the start of work. Training certifications or equivalent shall be submitted to the VA Technical Point of Contact (TPOC) prior to the start of work indicating each technician is a Qualified Person as defined by NFPA 70E. Each of the contractor s on-site crew leaders shall hold a current certification, Level III or higher, in electrical testing. This certification shall be in accordance with ANSI/NETA ETT, Standard for Certification of Electrical Testing Technicians.
Contractors shall have ready access to the latest versions of the following documents/references
a. NFPA 70, National Electrical Code. b. NFPA 70B, Recommended Practice for Electrical Equipment Maintenance. c. NFPA 70E, Standard for Electrical Safety for the Workplace. d. NFPA 99, Health Care Facilities Code. e. NFPA 110, Standard for Emergency and Standby Power System. f. OSHA Standard 29 CFR 1910, Subparts I, J, K & S. g. Inter-National Electrical Testing Association, Inc. (ANSI/NETA MTS- 2015) Standard for Maintenance Testing Specifications for Electrical Power Distribution Equipment and Systems. h. Operating/Maintenance manuals and specifications of the electrical equipment to be maintained and tested. These documents may be obtained from the WBVAMC. If not available from the WBVAMC, they shall be obtained by the contractor from the equipment manufacturer s website. If the document cannot be obtained from the equipment manufacturer s website, the contractor shall immediately alert the TPOC. These reference documents are required to ensure the contractor tests, inspects and performs maintenance in accordance with the equipment manufacturer s specifications. i. VHA Directive 1028 - Electrical Power Distribution System. See Attachment 5.
Contractor shall have and provide all necessary tools, equipment and Personal Protective Equipment (PPE) including Hazard Risk Category 3 Arc Flash Suits meeting ASTM F 1506 Standard for Electrical Safety to perform the work safely, effectively, and in a timely manner. All tools, equipment and PPE shall comply with the requirements of OSHA Standard 29 CFR 1910, Subpart I, and NFPA 70E as applicable. As per the equipment inventory list in Attachment 1 and prior to the start of work Contractor shall submit to the WBVAMC TPOC documentation stating that all tools, instruments, test equipment and PPE have been calibrated within the last 12 months. All tools, instruments and equipment shall be in good mechanical and electrical condition. Dated calibration labels shall be visible on all instruments, test equipment, tools and PPE as appropriate.
Scope of Work:
The contractor must be able to complete all the required tasks under this Scope within six (6) months upon award.
The Contractor shall provide a proposed schedule. The proposed schedule shall be in the form of a Gantt Chart of suitable scale indicating the tasks and their durations which will be reviewed and mutually coordinated between the contractor and the TPOC. The proposed schedule shall be reviewed by the WBVAMC Chief Engineer of Facilities Management Services and the TPOC for acceptance, and any requirements for adjusting the schedule (e.g. to minimize the disruption to critical care, life-safety and in- patient operations) shall be incorporated by the Contractor. The contractor shall maintain flexibility during the scheduled period of the effort to allow for some coordinated adjustments of the submitted GANTT schedule. The Government may need to make some schedule adjustments, which will be coordinated between the contractor and the TPOC, due to unknown events arising from life-safety and in-patient operations, and critical care concerns.
Work items, definitions, and references shall comply with the latest edition of the ANSI/NETA Maintenance Testing Specifications, MTS, and with the VHA Directive 1028 - Electrical Power Distribution System. All tests shall be performed with the apparatus de-energized and grounded except where otherwise specifically required to be ungrounded or energized for certain tests.
Contractors shall immediately report deficiencies that are deemed critical or catastrophic to the Contracting Officer (CO), TPOC, and Chief Engineer of Facilities Management Services for immediate actions.
Maintenance and Testing shall be performed on the Electrical Power Distribution System as per the following attachments:
Note: All attachments referenced in this statement of work are in adobe pdf format and attached to this contract.
Attachment 1 Inventory of Electrical Power Distribution System Equipment to be maintained, inspected and tested under this contract. Attachment 2 ANSI/NETA MTS-2015 Maintenance, inspection and testing requirements for all equipment identified in Attachment 1. Attachment 3 ANSI/NETA MTS-2015 Reference Tables and Appendix A (Definitions) for all required maintenance, inspection and testing requirements identified in Attachment 2. Attachment 4 Protective Device Setting Adjustments that are required to be made by the contractor on existing Electrical Power Distribution System Equipment during the performance of the work under this contract.
The following Attachment is provided to the contractor for reference only:
Attachment 5 Power Systems Study Drawings 1 through 22. These drawings are not certified as-built drawings of the facilities electrical distribution system.
(Note: The Contractor awarded this contract will be provided with additional Power System Study information relevant to the work which will include coordination study information, short-circuit analysis, arc-flash hazard analysis and all available protective device setting information.)
System Function Tests: Provide function tests for all equipment listed in Attachment 1. Refer to Section 8. SYSTEM FUNCTION TESTS in Attachment 2 for equipment testing requirements.
Infra-Red Scanning (IR Scanning): IR Scanning for all equipment listed in Attachment 1. Refer to Section 9. THERMOGRAPHIC SURVEY in Attachment 2 for equipment testing requirements. This work shall be performed while the Electrical Power Distribution System is energized, and all equipment covers removed.
An infra-red scanning camera shall be used to identify and document hot spots in the Electrical Power Distribution System. This will include all horizontal and vertical bus bars on rear accessible switchboards. The objective will be to identify exceptions such as any loose, broken or corroded connections within the system, short circuits, overloads, load imbalances or faulty, mismatched or improperly installed components. Problem connections shall be replaced with new connectors, and/or tightened with a torque wrench in accordance with the equipment manufacturer s specifications.
The contractor shall provide a second infra-red scan to verify that discrepancies indicated by the initial infra-red scan have been corrected.
Note that since this work item must be done while the Electrical Power Distribution System is energized, appropriate safety precautions must be taken before, during and after scanning the system.
4-Hour Power Outage Test:
Note: The 4-hour test must be conducted during moderate outdoor air temperature so that a reasonable indoor air temperature can be maintained. Past testing has been conducted in early spring or fall.
The Contractor will be required to be present for and to fully participate in the WBVAMC Facilities 4-hour test of the Essential Electrical Systems (EES). This test shall fulfill the requirements of VHA Directive 1028 - Electrical Power Distribution System, NFPA 110 (e.g. Para. 8.4.9.) and The Joint Commission.
This test will include the opening of both electric utility medium voltage sources for a minimum of 4-hours.
This testing will also include the alternate closing of each utility medium voltage source to verify proper operation of the WBVAMC s medium voltage switchgear control systems.
During this test period, the contractor shall verify the operation of all EES components including the transfer to emergency power and return to normal service. The Contractor shall provide all load bank equipment required for this test.
The Contractor shall include in their bid proposal all costs associated with the services of the local electrical utility company, PPL Electric Utilities, for the duration of this test. The estimated duration of the Contractor s and PPL Electric Utilities involvement of this test is between 8 12 hours. PPL Electric Utilities contact information: +1 (555) 000-0000, Option 4, or contact@example.gov.
The contractor will be required to assist the WBVAMC Facilities Maintenance Personnel with troubleshooting and potentially correcting any malfunctioning electrical distribution equipment discovered during the test.
Contractor shall make any required adjustments/ re-calibrations to all equipment which has already been maintained, inspected and tested under this Scope of Work.
Generator Load Bank Testing
Note: The generators at this facility are classified as Level 1 equipment.
The Contractor shall provide all load bank equipment required for this test for each generator identified in Attachment 1.
The load bank test shall occur during the four (4) hour disconnect from the commercial utility power.
The generators shall be tested for a continuous four (4) hours at minimum of 30% of the nameplate kw rating for the first three (3) hours and not less than 75% of the kw rating for the remaining one (1) hour.
Test Conditions: Note: Test conditions will require a multitude of shutdowns. The shutdowns will be scheduled in accordance with the Gant chart and are subject to re-scheduling pending on operations at the Wilkes Barre VAMC. The contractor shall determine which circuits are capable of being tested through secondary injection test method and/or primary injection method.
VA Staff will de-energize/re-energize all Electrical Power Distribution System equipment.
Contractor to rack (Remove/Reinstall) and test all Electrical Power Distribution System equipment.
The WBVAMC normal business hours are from 6:00AM 5:30PM Monday through Friday. All testing shall be performed on weekends, for safe and continuous operation of the medical center. Work affecting critical care, life-safety and in-patient care areas will be scheduled for Saturdays and Sudays, 7:00 AM until 5:00PM. Additional hours are allowed to ensure all systems are back to normal operating conditions before the start of normal business hours. Any extensions to a shift will be at no additional cost to the government.
Contractor shall ensure that adequate staff will be allocated to this contract in order to complete all work in a timely manner and conform to the approved final schedule.
After completing maintenance, testing, inspection and calibration of each device in the electrical power distribution system the Contractor shall place an adhesive label on each device containing their company name, test results and date of the services performed.
Test Report: A complete written report of the work performed shall be provided to the VA within seven (7) days of completion. The reports shall include the following:
Company s name, address, telephone & FAX numbers. Name and signature of contractors who performed the maintenance and testing. VA Work Contract Number, name of VA Contracting Officer. Date and Time of Work Copies of Contractor s Valid Licenses, Professional and Training Certificates Descriptions and Model Numbers of specialized tool and equipment used, such as torque wrench or infra-red scanning camera. Location, Type, Name and Name Plate Information of Electrical Equipment maintained and tested. Descriptions of work items Test Data Reference Materials such as equipment manufacturer s specifications, coordination study, etc. Remarks on conditions of electrical equipment, including a listing of all deficiencies, if any. Recommended corrective actions, if any.
Submit four (4) hard copies of the report and (1) electronic version of the report in Microsoft Word Format to the Chief of Facilities Management Services. All reference materials shall be included in the electronic version of the report, either through scanning or other means of electronic text import methods.
Records Management
Citations to pertinent laws, codes and regulations such as 44 U.S.C chapters 21, 29, 31 and 33; Freedom of Information Act (5 U.S.C. 552); Privacy Act (5 U.S.C. 552a); 36 CFR Part 1222 and Part 1228.
Contractor shall treat all deliverables under the contract as the property of the U.S. Government for which the Government Agency shall have unlimited rights to use, dispose of, or disclose such data contained therein as it determines to be in the public interest.
Contractor shall not create or maintain any records that are not specifically tied to or authorized by the contract using Government IT equipment and/or Government records.
Contractor shall not retain, use, sell, or disseminate copies of any deliverable that contains information covered by the Privacy Act of 1974 or that which is generally protected by the Freedom of Information Act.
Contractor shall not create or maintain any records containing any Government Agency records that are not specifically tied to or authorized by the contract
The Government Agency owns the rights to all data/records produced as part of this contract.
The Government Agency owns the rights to all electronic information (electronic data, electronic information systems, electronic databases, etc.) and all supporting documentation created as part of this contract. Contractor must deliver sufficient technical documentation with all data deliverables to permit the agency to use the data.
Contractor agrees to comply with Federal and Agency records management policies, including those policies associated with the safeguarding of records covered by the Privacy Act of 1974. These policies include the preservation of all records created or received regardless of format [paper, electronic, etc.] or mode of transmission [e-mail, fax, etc.] or state of completion [draft, final, etc.].
No disposition of documents will be allowed without the prior written consent of the Contracting Officer. The Agency and its contractors are responsible for preventing the alienation or unauthorized destruction of records, including all forms of mutilation. Willful and unlawful destruction, damage or alienation of Federal records is subject to the fines and penalties imposed by 18 U.S.C. 2701. Records may not be removed from the legal custody of the Agency or destroyed without regard to the provisions of the agency records schedules.
Contractor is required to obtain the Contracting Officer's approval prior to engaging in any contractual relationship (sub-contractor) in support of this contract requiring the disclosure of information, documentary material and/or records generated under, or relating to, this contract. The Contractor (and any sub-contractor) is required to abide by Government and Agency guidance for protecting sensitive and proprietary information.
===========================End of Statement of Work========================== End of Document

Similar Contracts

Same NAICS industry code

NAICS: 811310
New
Kubota M8200 Clutch Replacement
Solicitation # kubota-m8200-clutch-replacement
Management & Training Corporation is soliciting bids for the clutch replacement of a Kubota M8200 tractor with front wheel assist, no cab or loader, located at the Earle C. Clements Job Corps Center in Morganfield, Kentucky. The contractor is responsible for providing all transportation, labor, supervision, tools, and new manufacturer-specified parts to diagnose and repair the clutch assembly and power take-off system. Key technical requirements include replacing friction discs, bearings, oil seals, and O-rings, as well as resurfacing the flywheel and replacing hydraulic pipes and filters as necessary. Final acceptance is contingent upon the Facility Maintenance Department verifying proper clutch engagement and PTO operation under load. This is a fee-for-service contract awarded on a best-value basis, with a response deadline of November 3, 2026. The solicitation is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certifications. Applicants must submit a bid sheet, proof of insurance, a completed supplier packet including Form W-9, and a self-certification form. The contract is subject to various Federal Acquisition Regulations, including Service Contract Labor Standards under Wage Determination 2015-4687 Revision 31 for Kentucky, and strict requirements regarding the security of non-public information and the prevention of trafficking in persons.
Earle C. Clements Job Corps Center

POSTED

about 7 hours ago

DEADLINE

in 7 days
View Details
NAICS: 811310
New
SLED
ANNUAL ROTATING EQUIPMENT INSPECTION, TESTING, REPAIR, RECONDITIONING AND STORAGE SERVICES
Solicitation # 2026-RFP-130
Lakeland Electric is soliciting proposals under RFP 2026-RFP-130 to establish a pool of qualified contractors for the annual inspection, testing, repair, reconditioning, and storage of critical rotating equipment at the McIntosh and Larsen Power Plants. The scope of work covers a wide range of assets, including low- and medium-voltage AC/DC electric motors and circulating water and condensate pumps. Required services include clean inspection tests, troubleshooting, motor rewinding, dynamic field balancing, laser alignment, and vibration analysis. Additionally, the selected contractors must provide logistics support, including pickup, delivery, and secure indoor storage with ongoing preservation activities such as shaft rotation and lubrication. Proposals are due by 3:00 pm on October 30, 2026, via the OpenGov portal. Award decisions will be based on a 100-point scoring system evaluating pricing (30%), qualifications and experience (25%), technical and facility capabilities (25%), service approach and response (15%), and past performance (5%). Mandatory submittals include a signed W-9, Florida Sunbiz registration, a notarized Hold Harmless Indemnification Agreement, and a Human Trafficking Affidavit. Contractors must adhere to strict safety standards, including OSHA regulations for crane operations and powered industrial trucks, and must certify compliance with drug-free workplace and suspension and debarment regulations.
LE - Production - MPP

POSTED

about 15 hours ago

DEADLINE

in 3 days
View Details

More opportunities from Department Of Veterans Affairs → 244-NETWORK Contract Office 4 (36C244)

Same awarding agency

NAICS: 811210
New
Federal
J065--Notice of Intent to Sole Source Maintenance of Alaris Infusion Pumps
Solicitation # 36C24427Q0040
The Department of Veterans Affairs has issued a notice of intent for a single, Firm-Fixed Price contract to provide annual maintenance and support services for the Alaris System software and components at the Butler Healthcare Care Center in Butler, Pennsylvania. The primary objective is to secure a post-warranty, full maintenance agreement for the Guardrails software package and to update the network configuration by adding a new range of IP addresses via the VA Altoona server. The period of performance consists of a one-year base period after receipt of order, with four additional one-year option periods available at the government's discretion. The scope of work includes the installation of the latest software versions for Guardrails Suite MX and Alaris Systems Manager, as well as comprehensive technical support and clinical services. Key deliverables include quarterly infusion analytics reports, technical telephone support, monthly web-based training, and annual on-site visits from both technical service and RN clinical consultants. The contractor must ensure compliance with Federal Information Processing Standards (FIPS) 140-2 for the Alaris Packet Control Unit wireless module and adhere to BD's federal terms and conditions. Financial administration will be handled through monthly invoicing for maintenance and support fees.
Electronic and Precision Equipment Repair and Maintenance

POSTED

about 18 hours ago

DEADLINE

in 6 days
View Details
NAICS: 236220
New
Federal
Z1DA--642-22-104 | Upgrade Substation Building 2 Phase 1 for Philadelphia VAMC
Solicitation # 36C24426R0088
The Department of Veterans Affairs Network Contracting Office 4 is soliciting proposals for the replacement of Electrical Substations 1 and 2 at the Corporal Michael J. Crescenz Medical Center in Philadelphia, Pennsylvania. This project aims to increase electrical capacity to support current and future facility demands by replacing 29-year-old equipment with new 480/277V substations, each featuring a 1500 kVA transformer. To ensure continuous medical center operations and minimize service outages, the contractor must install a temporary 480/277V substation with a 1500 kVA transformer, which will remain as a spare unit upon project completion. The period of performance is 1,000 calendar days from the issuance of the Notice to Proceed. This is a negotiated RFP set aside 100% for VIP-listed Service-Disabled Veteran-Owned Small Businesses (SDVOSB) under NAICS code 236220. Award will be based on a Best Value Tradeoff, with technical proposals evaluated separately from price proposals. Key evaluation factors include the phasing and live electrical cutover strategy, utility shutdown coordination, infection control and PCRA implementation, and environmental and hazardous waste compliance. Proposals are due by November 20, 2026, at 4:00 PM EST. Requirements include the provision of 100% performance and payment bonds, a 20% bid guarantee, and the identification of key personnel, including a Project Manager, Licensed Electrical Supervisor, and Quality Control Manager.
Commercial and Institutional Building Construction

POSTED

about 18 hours ago

DEADLINE

in 24 days
View Details
NAICS: 236220
New
Federal
Z2DA--FY26 NRM 460-20-004 | Tuckpointing FY26 | NCO 4 Construction East (VA-26-00060656)
Solicitation # 36C24426B0018
Solicitation 36C24426B0018 is a sealed bid invitation for a firm fixed-price construction contract to perform tuckpointing, masonry, and caulking repairs at the Wilmington VA Medical Center in Delaware. This project, identified as Project 460-20-004, involves the repair and replacement of deteriorated exterior masonry and caulking systems across ten campus buildings. The estimated magnitude of construction is between 2,000,000 and 5,000,000 dollars, with a required period of performance of 270 calendar days from the Notice to Proceed. The contract is a 100 percent set-aside for certified Service-Disabled Veteran-Owned Small Businesses (SDVOSB) under NAICS code 236220. Award will be granted to the responsive and responsible bidder offering the lowest price. Key requirements include the provision of performance and payment bonds, compliance with the Davis-Bacon Act, and adherence to the Buy American Act. The contractor must provide a dedicated quality control person with a QC/OQA background to validate work and generate a final punch list. Technical specifications mandate that all materials be installed according to manufacturer standards and local building codes, with a required cleaning mock-up to establish the quality standard. Bids must be submitted electronically, and offerors must be registered in the System for Award Management (SAM) and verified through VetCert at the time of proposal.
Commercial and Institutional Building Construction

POSTED

about 18 hours ago

DEADLINE

in 8 days
View Details
NAICS: 334516
New
Federal
6550--VISN 4 Coagulation Testing
Solicitation # 36C24427Q022
Solicitation 36C24427Q022 is a request for a five-year Indefinite Delivery Indefinite Quantity (IDIQ) contract to provide advanced automated primary coagulation testing systems for nine VA Medical Centers within VISN 04. The anticipated period of performance runs from December 1, 2026, to November 30, 2031. The contractor is required to provide FDA-approved instrumentation, including delivery, installation, and removal, along with all necessary reagents, standards, quality controls, and consumables. A key requirement is the implementation of a bi-directional, bar-coded computer interface compatible with the VA laboratory information system, supporting Code 39 and Code 128 formats with a failure rate of less than 1%. The government will award the contract to the responsible quoter determined to be most advantageous based on a comparative evaluation of past performance, price, and technical capability. Pricing is based on a Cost per Patient Reportable Result (CPRR) model. Equipment acceptance is contingent upon the systems operating at an effectiveness level of 90% or more for 30 consecutive calendar days following installation. All quality control and calibration must adhere to Clinical and Laboratory Standards Institute (CLSI) guidelines, and waste characterization must comply with Code of Federal Regulations Title 40. Invoices are to be submitted electronically to the Austin Payment Center and paid in arrears upon inspection and acceptance.
Analytical Laboratory Instrument Manufacturing

POSTED

2 days ago

DEADLINE

in 22 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS