Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Defense was posted on August 26, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

JBSA FSH - HVAC Replacement OEM Parts Only – BAC Cooling Tower and Temtrol AHU

Closed
FA301626Q0260NoI-SS_BrandNameFederal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The 502d Contracting Squadron at JBSA Lackland intends to award a sole-source, firm-fixed-price purchase order for original equipment manufacturer components to restore HVAC infrastructure at JBSA FSH. This procurement is limited strictly to the acquisition of proprietary parts for Baltimore Aircoil Company cooling towers and Temtrol air handling units, specifically excluding any installation or on-site labor. The government has determined that only brand name OEM components are acceptable to ensure system compatibility with building automation systems, preserve existing manufacturer warranties, and adhere to Department of the Air Force engineering standards. Interested parties must submit a capability statement via email within five days of the notice, including corporate information, OEM authorization from BAC and Temtrol, and proof of delivery capabilities within 30 days after receipt of order. This notice serves as an intent to sole source under the Revolutionary FAR Overhaul guidelines to determine if a competitive solicitation is necessary. All prospective contractors must be registered in the System for Award Management to be eligible for the award.

General Info

Sole-source purchase of OEM HVAC components for JBSA FSH without installation services.

NAICS

333415 - Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment Manufacturing

Place of Performance

0, TX, 78234, USA

Set-Aside

NONE

Documents

1

JBSA FSH HVAC Replacement OEM Parts Only - Notice of Intent to Single Source

PDF, High priority: read this firstspecial-notice
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

special-notice

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA3016 502 Cons Cl
Contacts2 people available
OfficeJBSA LACKLAND, TX, 78236-5286, USA
Office AddressJBSA LACKLAND, TX, 78236-5286, USA
Contacts
Ulysses Solis
Teresa Calavera Sullivan

Full Description

Show more

502d Contracting Squadron (502 CONS), JBSA Lackland hereby gives notice of its intent to award a sole-source, firm-fixed-price purchase order to acquire Original Equipment Manufacturer (OEM) parts/components for the replacement and restoration of existing HVAC infrastructure at JBSA FSH. No installation, assembly, or on-site labor services are required.


Specifically, this requirement entails the procurement of proprietary OEM components for:


  • Baltimore Aircoil Company (BAC) Cooling Towers
  • Temtrol Air Handling Units (AHUs)

This acquisition is being conducted in accordance with (IAW) the Revolutionary FAR Overhaul (RFO) streamlined procurement guidelines and existing base facility engineering standards.


STATUTORY AUTHORITY - The Government intends to solicit and negotiate this requirement under the authority of 10 U.S.C. 3204(a)(1) or 41 U.S.C. 3304(a)(1) RFO 6.103-1 “Other than Full and Open Competition, Only One Responsible Source and No Other Supplies or Services will Satisfy Agency Requirements.”


The Contracting Officer has determined that only one (1) source is reasonably available to satisfy the technical and operational constraints of this installation, specifically requiring brand name OEM components. This streamlined notice is issued under the regulatory simplification policies established by the RFO initiative to minimize administrative burden while securing critical mission support.


JUSTIFICATION FOR SINGLE SOURCE (OEM PARTS ONLY) - The facility infrastructure at JBSA FSH relies heavily on integrated mechanical HVAC systems engineered to exact manufacturer tolerances. To maintain system reliability, security, and operational capability, only authentic BAC and Temtrol components are acceptable for the following reasons:


  • System Compatibility & Integration - The current cooling tower and air handling systems are proprietary units designed by Baltimore Aircoil Company and Temtrol. These systems interface directly with the base’s unified Building Automation Systems (BAS) and environmental control loops. The installation of non-OEM or third-party aftermarket components will disrupt system calibration, communication protocols, and overall mechanical performance.
  • Warranty Preservation - The existing BAC Cooling Towers and Temtrol Air Handling Units are covered under existing manufacturer performance warranties. The introduction of non-OEM replacement parts voids these manufacturer warranties, exposing the Government to substantial financial risk in the event of major mechanical failures.
  • Maintenance & Engineering Standards - To comply with DAF Civil Engineering standards and streamlined acquisition guidelines under the RFO initiative, all repairs and replacements must meet the original manufacturer's specifications. OEM components ensure identical materials, performance metrics, thermos-dynamic efficiency, and safety profiles, preventing premature wear on surrounding system components.

DESCRIPTION OF REQUIRED SUPPLIES - This procurement requires a standard package of critical HVAC components, including but not limited to:


  • BAC Cooling Tower OEM Components: Replacement fill media, spray nozzles, drive shafts, fan assemblies, and structural casing components engineered strictly for BAC models.
  • Temtrol Air Handling Unit OEM Components: Direct-drive fan arrays, proprietary heating and cooling coils, custom damper assemblies, and control actuators matching Temtrol specifications.

All items must be delivered in brand new original packaging from the manufacturer and must bear the standard OEM product warranty. See Attch 1. HVAC REPLACEMENT OEM PARTS ONLY LISTING (B3820 & B1029).


SUBMISSION INSTRUCTIONS FOR INTERESTED PARTIES - THIS NOTICE OF INTENT IS NOT A SOLICITATION, REQUEST FOR PROPOSAL or REQUEST FOR QUOTE. However, interested parties may identify their interest and capability in fulfilling this requirement by responding within five (5) days after publication of this notice.


This information will be used to determine the appropriate acquisition strategy, including whether a competitive solicitation is necessary. The Government retains sole discretion in making this determination. No formal solicitation package is available.


IAW RFO 6.103-1(d) and the commercial streamlining principles of the RFO, the Government will consider capability statements, proposals, or quotations submitted by any responsible source that can demonstrate its ability to fulfill this requirement by email only with “RESPONSE TO INTENT TO SOLE SOURCE – HVAC OEM Parts Only (BAC & Temtrol)” in the subject line. All documents submitted will not be returned.


Interested firms must submit comprehensive supporting evidence in writing to demonstrate their capability. Submissions must include the following information:


  • Corporate Information: Company name, address, SAM.gov Unique Entity Identifier (UEI), and CAGE code.
  • OEM Authorization: A formal letter or certificate from Baltimore Aircoil Company (BAC) and Temtrol verifying that the vendor is an authorized dealer, distributor, or reseller certified to supply authentic OEM parts.
  • Technical Compliance: Proof that the offered components are brand name OEM items and meet all technical, dimensional, and functional specifications IAW the brand name Model and Serial Number.
  • Delivery Capabilities: Demonstrated ability to supply and deliver the requested components to JBSA FSH within the required timeframe of 30-days ARO.

Please submit your response electronically via email to both points of contact listed below. Your submission must be received no later than the active response deadline; late or incomplete packages will not be accepted.


  • Ulysses Solis Contract Specialist, at ulysses.solis@us.af.mil
  • Teresa Sullivan, Contracting Officer at teresa.sullivan.4@us.af.mil

A determination not to compete this requirement, based upon responses to this notice, is solely within the discretion of the Government. Information received will normally be considered solely for determining whether to conduct a competitive procurement.


The Government will NOT be responsible for any costs incurred by interested parties in responding to this notice of intent. Only written responses will be considered. All responses from responsible sources will be fully considered. As a result of analyzing responses to this notice of intent, the Government shall determine if a solicitation will be issued. Any prospective contractor must be registered in the System for Award Management (SAM) to be eligible for award.


List of Attachment:


  1. HVAC REPLACEMENT OEM PARTS ONLY LISTING (B3820 n B1029)

More opportunities from Department Of Defense → FA3016 502 Cons Cl

Same awarding agency

NAICS: 811310
New
Federal
Aviation Support Equipment Load Testing
Solicitation # F2MT2M6146AQ01
This Sources Sought Notice, solicitation number F2MT2M6146AQ01, is a market research effort to identify qualified sources capable of providing aviation support equipment load testing and maintenance for the 433rd MXS/AMXS at Joint Base San Antonio-Lackland, Texas. The scope of work involves non-personal services including annual preventive maintenance inspections, load tests, certification, and both scheduled and unscheduled repairs to ensure the safe operation of aircraft support equipment. All services must adhere to OSHA Standards 1910 and 1926, ANSI Standards B30.16 and B30-5, and applicable Air Force Instructions and Technical Orders. Key deliverables include an initial annual preventive maintenance schedule, certification reports due within two workdays of completion, and repair estimates provided within 48 hours of an initial survey. Performance requirements specify that standard preventive maintenance must be completed and equipment returned within 48 hours of pickup, while approved repairs must be returned within three business days. Interested vendors must submit their response, including company details, CAGE code, and a statement of capability with product literature, to Dalwyn Corporan-Polanco by 10:00 AM CDT on October 20, 2026. This notice is for research purposes only and does not constitute a solicitation or a promise to issue one.
Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance

POSTED

2 days ago

DEADLINE

in 3 days
View Details
NAICS: 562991
New
Federal
Restroom and Shower Trailer Rental
Solicitation # FA301627Q0006
Solicitation FA301627Q0006 is a Firm-Fixed-Price Request for Quote issued by the United States Air Force for the turnkey rental, delivery, setup, and maintenance of three 8-stall shower trailers and three 8-stall restroom trailers. The facilities will support relocated Medical Education and Training Campus occupants at Building 10207, Lackland Gateway, Joint Base San Antonio, Texas. The contractor is responsible for providing all necessary utilities, including power generation, water supply, and sewer services. Maintenance requirements include two weekly cleanings and waste tank pumping, with a unilateral government option to increase the frequency to three times per week. The contract consists of a six-month base period from October 30, 2026, to April 29, 2027, with three subsequent two-month option periods. This acquisition is set aside 100% for Service-Disabled Veteran-Owned Small Business (SDVOSB) concerns under NAICS code 562991. Award will be made to the responsible offeror based on a Price Only Factor, specifically the lowest Total Evaluated Price that is determined to be complete and reasonable. Mandatory requirements for offerors include CMMC Level 1 self-certification reflected in the SPRS and the submission of a Unescorted Access Request at least 10 business days prior to base entry. Quotes must be submitted via the PIEE solicitation module and emailed to the designated points of contact by October 19, 2026. Invoicing and payment will be processed electronically through the Wide Area WorkFlow system.
Septic Tank and Related Services

POSTED

3 days ago

DEADLINE

in 2 days
View Details
NAICS: 238220
New
Federal
Brand Name or Equal - WaterFurnace Model: UBH015R for B3631 & B3635 - Turnkey Replacement
Solicitation # A070764SS
The 502d Contracting Squadron is conducting market research via a Sources Sought Synopsis to identify capable industry sources for the turnkey removal and replacement of 48 ceiling-suspended Dedicated Outside Air System Water-Source Heat Pumps at the JBSA Ft Sam Houston San Antonio Military Medical Center Dormitory Annex, specifically in buildings B3631 and B3635. The project is projected as a Firm-Fixed Priced Purchase Order under NAICS code 238220. The contractor must provide all personnel, equipment, and supervision to install units that meet strict technical specifications, including a 1.25-ton capacity, horizontal ceiling-plenum configuration, and the use of low-GWP refrigerants such as R-454B or R-32, as R-410A is strictly prohibited. A critical requirement is that replacement units must fit through existing access openings measuring approximately 3 feet 11.5 inches by 2 feet to avoid structural demolition. The scope of work includes the integration of the units into the central Building Automation System via BACnet IP/MSTP and the use of AHR/ISO 13256-1 certified water-to-refrigerant coaxial heat exchangers. Performance must be completed within 275 days of award. Interested respondents must provide company identification, SAM.gov certifications, and confirmation that technicians hold EPA Section 608 Universal Certifications. Small business prime contractors must also verify they can cover at least 51 percent of the contract cost with their own personnel. Responses are due by October 26, 2026, and must be submitted in PDF format with a maximum length of ten pages, excluding equipment cut sheets.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

3 days ago

DEADLINE

in 9 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS