Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Kansas was posted on July 23, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

JCW State Line Road Force Main Project

Closed
2024-029 Addendum 1State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 221320
New
Federal
Y--GRCA 257282 - Replace Wastewater Plant at South Ri
Solicitation # 140P2026R0101
Solicitation 140P2026R0101 is an unrestricted full and open competition Invitation for Bid issued by the National Park Service, DSC Contracting Services Division, for the replacement of the South Rim Wastewater Treatment Plant at Grand Canyon National Park, Arizona. The project involves the construction of a GD Membrane Bio-Reactor wastewater treatment plant, including new treatment facilities, administrative and support buildings, and process systems. The scope of work encompasses complete demolition and removal of existing infrastructure, site preparation, grading, paving, fencing, and improvements to the facility access road. A critical requirement is that the existing plant must remain in permitted operation until the new facility is accepted by the government, and the contractor must provide a 12-month operational support period. The contract is a firm-fixed-price acquisition with a magnitude exceeding 100 million dollars. The mandatory period of performance is 1095 calendar days, scheduled from February 1, 2027, to February 1, 2030. Award will be based on a multi-factor, best-value tradeoff process evaluating technical experience, technical approach, key personnel experience, and price. Required deliverables include a detailed commissioning plan covering startup sequencing, operator training, and regulatory coordination. The contractor must furnish performance and payment bonds and comply with union prevailing wage rates, Department of the Interior cybersecurity requirements, and ADA/ABA accessibility standards.
Dsc Contracting Services Division

POSTED

about 10 hours ago

DEADLINE

in 21 days
NAICS: 221320
Federal
Operations and Maintenance (O&M) Services for the SBIWTP
Solicitation # 191BWC26R0009
Solicitation 191BWC26R0009, issued by the International Boundary and Water Commission, seeks a contractor to provide Firm Fixed Price Operations and Maintenance (O&M) services for the South Bay International Wastewater Treatment Plant (SBIWTP) in San Ysidro, California. The contract is structured with a base year running from June 1, 2027, to May 31, 2028, and multiple option years extending through May 2031. A primary objective of the scope is managing plant operations, SCADA systems, and maintenance during the facility's expansion from 25 MGD to 50 MGD. The contractor must ensure 24/7 staffing, including a bilingual operator, and maintain strict compliance with the National Pollutant Discharge Elimination System (NPDES) permit and other regional water quality board regulations. Award will be based on the Highest Technically Rated with a Fair and Reasonable Price method, where non-price factors—such as plant operations, permit compliance, and staffing—are significantly more important than cost. Key requirements include the designation of a Project Manager, Superintendent, Site Safety and Health Officer, SCADA Specialist, and Asset Manager. The contractor is responsible for a wide array of deliverables, including a Phase-In Plan, Preventative Maintenance Plan, and monthly performance reports. Security is a high priority, requiring background investigations for personnel and adherence to NIST standards for protecting Controlled Unclassified Information. Performance will be monitored via a Quality Assurance Surveillance Plan focusing on regulatory compliance, uptime, and effluent quality.
Internat Boundary And Water Commission

POSTED

8 days ago

DEADLINE

in 2 months
NAICS: 221320
Federal
Waste Water Treatment Plant Services
Solicitation # FA448627Q0002
Solicitation FA448627Q0002 is a Request for Quotation issued by the Department of the Air Force for Waste Water Treatment Plant Services at Lajes Field in Praia da Vitoria, Azores, Portugal. The contractor will be responsible for the operation and maintenance of a waste water treatment plant with a capacity of 800,000 gallons per day, as well as the associated lift station, oil-water separator, and grease traps. Key requirements include providing a Lead Operator with a Level II or higher WPI Certification and at least three years of experience, implementing a 52-week preventive maintenance plan, and ensuring compliance with ISO/IEC 17025 laboratory standards and Portuguese decree law 183/2009 for waste landfills. The scope also encompasses corrosion control, painting, and the management of hazardous materials. The government intends to award a single Firm-Fixed-Price contract with a total duration not to exceed 66 months, consisting of a base period and four option periods. This is an unrestricted acquisition, and proposals must be submitted electronically by November 23, 2026, at 14:00 Azores Time. Offers are evaluated through a three-step sequential process: an administrative compliance review, a technical acceptability evaluation based on experience, approach, and a quality control plan, and finally a price evaluation in Euro currency. Award is contingent upon the availability of funds. Payments will be processed electronically via the Wide Area WorkFlow system.
FA4486 765 Abs Conf

POSTED

16 days ago

DEADLINE

in 26 days

AI Contract Overview

Show more

The Johnson County Wastewater Department is seeking sealed bids for the State Line Road Force Main Project, designated as Bid Request No. 2024-029. The project involves the installation of approximately 17,750 feet of 20- and 24-inch diameter sanitary sewer force mains, along with related appurtenances, from 8900 State Line Road to the Tomahawk Wastewater Treatment Facility. Additional work includes installing gravity sewer lines, steel casing pipes via auger boring, gravity manholes, air release valve assemblies, and constructing a concrete pigging station. The project also encompasses stream restoration, landscaping, fencing, and vegetation replacement in parks, as well as installing conduit for future fiber optic systems, pavement replacement, traffic control, and microsurfacing on State Line Road. The scope covers all necessary labor, materials, permits, and temporary facilities, with some materials pre-procured by Johnson County, which the contractor must properly install and test. Bidding is conducted electronically through IonWave, with a mandatory pre-bid conference via Zoom scheduled for August 6, 2024. Bidders must submit a bid bond equal to 5% of their bid, along with required questionnaires and documentation, by the response deadline of August 28, 2024. The project is estimated to have a contract size between five and ten million dollars, and the work must be completed within a period that will be specified in the bid documents. The process includes provisions for plan and specification access, clarification requests, and adherence to Johnson County’s electronic bidding procedures. The comprehensive scope, detailed technical and logistical requirements, and strict submission protocols aim to ensure the successful execution of this substantial infrastructure upgrade within the designated timeline and budget.

General Info

Place of Performance

KS, USA

Set-Aside

NONE

Documents

13

2024-029 Addendum 1: Fully Insured Group Vision Plan

PDF, High priority: read this firstamendment
High

2024-029 Bidder Questionnaire for Manufacturers and Subcontractors

DOCX, High priority: read this firstquestionnaire
High

2024-029 JCW State Line Geotechnical Exploration Report

PDF, High priority: read this firstgeotechnical-report
High

Addendum No. 1 for IFB No. 2024-029 State Line Road Force Main Project

PDF, High priority: read this firstamendment
High

Bid Bond Form for JCW State Line Road Force Main Project - Contract LWC1-6B

DOCX, High priority: read this firstbid-bond
High

Bid Form for JCW State Line Road Force Main Project 2024-029

DOCX, High priority: read this firstbid-form
High

2024-029 JCW State Line Tunneling Geotechnical Report

PDF, Low prioritygeotechnical-report
Low

How to do Business with Johnson County and Supplier Response Quick Tutorial

PDF, Low priority21 pages · other
Low

RFP 2024-029 Addendum 1 - Public Questions & Answers

PDF, Low priorityq-and-a
Low

2024-029 SLR Force Main Project Manual (final).pdf

PDF

2024-029 SLR Force Main Project Plans.pdf

PDF

extract (1).pdf

PDF

extract.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Notice updated

Response deadline changed from May 23, 2024 to Aug 28, 2024. The notice title changed. NAICS code changed from 541715 to 221320. The notice description changed. The point of contact changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyKansas → Johnson County
Contacts1 person available
OfficeN/A
Organization / AgencyKansas → Johnson County
Office AddressN/A

Full Description

Show more
Sealed bids for Bid Request No. 2024-029 for the Johnson County Wastewater (JCW) State Line Road Force Main Project shall be submitted electrically via IonWave at https://jocogov.ionwave.net until the close date/time reflected above. At that time, all bids that have been duly received will be publicly read aloud via Zoom Video Conferencing at:
https://zoom.us/j/97314791050?pwd=UXBYdjJpUklVdWd6MWk3RTJTZFBqUT09
This bid includes the following Work:
Installation of approximately 17,750 feet of 20-inch and 24-inch diameter sanitary sewer force main (pipe and fittings furnished by Owner) and appurtenances generally from 8900 State Line Road to the Tomahawk Wastewater Treatment Facility; installation of approximately 800 lineal feet of 10-inch diameter gravity sewer; installation of approximately 307 lineal feet of 24-inch steel casing pipe and 480 lineal feet of 42-inch steel casing pipe by auger boring; installation of four (4) gravity manholes ranging in diameter from 4-foot to 6-foot; installation of ten (10) new combination air release valve assemblies in vaults; construction of a 12-foot by 19-foot cast-in-place concrete pigging station including valving; stream restoration of Indian Creek in two (2) locations; sodding and seeding of disturbed unpaved areas including restoration of soccer fields and park ground in Leawood Park and replacement of disturbed fencing and vegetation in the Leawood Dog Park; installation of approximately 15,000 feet of new 2-inch conduit and associated pull boxes (for a future fiber optic system by others); placement of flowable fill backfill of the gravity and force main under paved areas; full depth replacement of two southbound asphalt lanes of State Line Rd, a single lane of State Line Way, a single lane of 109th Street, mill and overlay of turning lanes on State Line Road, and miscellaneous pavement with quantities of 5,315 tons of KCMMB A1 asphalt, 551 tons of KCMMB A2 asphalt, 8,474 tons of KCMMB A3 asphalt, and 26,829 SY of AB-1 aggregate base; replacement of 3,681 lineal feet of curb and 182 SY of median pavers; replacement of 3,861 SY of concrete pavement and sidewalk; traffic control and permitting necessary to conduct work on existing roadways; installation of Type III Microsurfacing of two (2) northbound lanes of State Line Road from 89th Street to 103rd Street; temporary facilities; and all other appurtenances, labor, and materials. Note: a list of materials pre-procured by Johnson County is provided in the Bidding Documents and will be the responsibility of the awarded Contractor to properly install and test as required to ensure proper function.  
Copies of the plans and specifications are available through IonWave at https://jocogov.ionwave.net/SourcingEvents.aspx?SourceType=1 or can be downloaded for a non-refundable fee online at https://www.drexeltech.com in their eDistribution public jobs plan room; additional assistance is available at contact@example.gov.   A Mandatory Pre-Bid Conference will be held at 10:00AM CT on August 6, 2024, via Zoom Video Conferencing at:  https://zoom.us/j/98163373818?pwd=bWlDNEVTTWoyTlJmdlNtbTNoSnlpQT09   Technical questions and requests for clarification shall be submitted via IonWave no later than 5:00PM CT on August 19, 2024, to allow adequate time to issue an addendum, if needed.   Bidders shall submit the following with their bid:
Bid Bond: Bidders shall submit with their bid a bid bond issued by a surety company licensed to do business in the State of Kansas in the amount of five percent (5.0%) of the total amount of their bid.  Said guarantee shall be made payable to the Board of County Commissioners of Johnson County, Kansas.
Materials/Equipment Manufacturer and Subcontractor Questionnaire: form is provided in the Project Manual and as a separate attachment in IonWave.
  No bid may be withdrawn within a period of sixty (60) days from the date of the bid opening.

More opportunities from Kansas → Johnson County

Same awarding agency

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS