Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Sources Sought opportunity from Department Of Defense was posted on May 15, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

JESTR Slipper Wear Tribology - Validated Model for Development of Wear Reduction Techniques and Materials

Closed
FA9101-25-Q-Sources_Sought_Slipper_Wear_Tribology-541330-Engineering_ServicesFederal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

General Info

NAICS

541330 - Engineering Services

Place of Performance

Holloman AFB, NM, USA

Set-Aside

NONE

Documents

1

Sources Sought: JESTR Slipper Wear Tribology Engineering Services

PDF, Low prioritysources-sought
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Sources Sought

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA9101 Aedc Pkp Procrmnt Branch
Contacts1 person available
OfficeARNOLD AFB, TN, 37389-1332, USA
Office AddressARNOLD AFB, TN, 37389-1332, USA
Contacts
Greggory Jones

Full Description

Show more
During testing at the Holloman High Speed Test Track (HHSTT) and other tracks, - sleds (means to carry the unit under test and propulsion) are constrained to the rail by metal - slippers that wrap around the rail head and ensure the sled follows the trajectory defined by the track. Slipper wear tribology, continues to be a limitation for certain sled tests, especially during high-speed tests or when the sled is required to travel longer distances. The physical interaction between the slippers and the rail during sled testing is not well understood. Excessive slipper wear (to the point where the sled could leave the rail) is thought to be caused by large forces generated from impacts between the slippers and the rail, friction forces applied over time, and potentially other interaction effects. High speeds and long travel distances tend to increase slipper wear, but the accurate prediction of slipper wear has proven to be challenging. Slippers that wear to the point of structural failure are of most concern, especially with higher velocities and longer travel distances expected in the future. One of the central problems in the development of wear-resistant materials for use in slippers is the lack of a validated, high-speed wear prediction model. Without a validated prediction model the amount of wear slippers are likely to experience during a sled test cannot be accurately predicted. Atch 1 Request Due Date: 22 May 2025, 10:00 AM CST

More opportunities from Department Of Defense → FA9101 Aedc Pkp Procrmnt Branch

Same awarding agency

NAICS: 333517
New
Federal
CNC Small Wire EDM
Solicitation # FA9101CNCSmallWireEDM
The Department of the Air Force is issuing a Sources Sought Notice to identify capable small and large businesses for the procurement of a new, fully functional Small CNC Wire Electrical Discharge Machining (EDM) machine for the Arnold Engineering Development Complex (AEDC) at Arnold Air Force Base, Tennessee. The required equipment must support submerged and non-submerged machining, automatic wire threading and alignment, and U-V taper cutting, with minimum axis travel of 15.5 inches for X, 11.5 inches for Y, 8.5 inches for Z, and plus or minus 2.4 inches for U and V. The machine must be compatible with a 480V, 3PH, 60 HZ electrical system and be built to NFPA 79 standards. Delivery is required within 90 days of order receipt, with the contractor providing assembly, startup, and functional testing based on ISO/ANSI standards at the AEDC Model Shop. The government requires a minimum 24-month warranty after installation and a 10-year accuracy guarantee on the linear drive system. Additionally, the contractor must provide two days of formal on-site operator training for up to five people and two days of maintenance training for up to five workers. Service support requirements include a 36-hour on-site repair response time and a 48-hour delivery window for repair parts. Interested respondents under NAICS code 333517 must submit company information, SAM UEI and CAGE codes, a compliance matrix, product literature, and past performance data to the contracting office by November 2, 2026.
Machine Tool Manufacturing

POSTED

2 days ago

DEADLINE

in 4 days
View Details
NAICS: 333994
New
Federal
New Heat Treat Equipment
Solicitation # FA9101NHT
The Air Force Test Center’s Installation Contracting Division is conducting market research through a Sources Sought Notice to identify capable small and large businesses for the turnkey procurement, delivery, installation, and commissioning of a new Surface Combustion Allcase Batch Integral Quench Furnace Line. Located at Holloman Air Force Base in Building 1185, the project includes the installation of a Uni-DRAW Temper Furnace and a Spray/Dunk Wash Unit. The selected contractor will be responsible for all specialized engineering, rigging, and labor, ensuring the system is fully operational and compliant with NFPA 86, AMS 2750, OSHA 29 CFR 1910, and NEC/NFPA 70 standards. The performance timeline involves a 4 to 6 week kickoff and drawing phase, followed by a manufacturing lead time of approximately 52 to 78 weeks. On-site installation is expected to take 4 to 6 weeks, with an additional 2 to 3 weeks for commissioning and handover. Formal acceptance requires a successful three-cycle production demonstration and the sign-off of an Engineering Release Form. Additionally, the contractor must provide a two-year extended warranty and comprehensive on-site training for operators and maintenance personnel. Interested respondents must submit their company information, UEI number, technical solutions, budgetary estimates, and delivery timelines by November 2, 2026.
Industrial Process Furnace and Oven Manufacturing

POSTED

3 days ago

DEADLINE

in 4 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS