Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

JOFOC: 68HERH25C0005:Portable High Throughput Integrated Laboratory Identification Systems (PHILIS) Platform Modernization, Change Order

Awarded
JOFOC_68HERH25C0005_PHIIS_Change_OrderFederal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The U.S. Environmental Protection Agency, through the Office of Chief Procurement Officer and the Land, Enforcement, and Air Division, has justified a sole-source modification to contract 68HERH25C0005 under FAR Subpart 6.302-1 for the Portable High Throughput Integrated Laboratory Identification Systems (PHILIS) Platform Modernization. The sole source for this modification is MRIGLOBAL, identified by its Unique Entity ID HKQHNFKNKL15, due to its exclusive possession of proprietary design knowledge, completion of over 90% of the final system design, and the high risk of significant delay and technical disruption if the work were transitioned to another contractor. The modification increases the contract ceiling by $244,900, raising the total value to approximately $13.57 million, and includes technical upgrades such as enhanced insulation, sub-surface wiring for fire suppression systems, custom generator exhaust adaptors, and improved decontamination capabilities to support the PHILIS platform’s mission-critical role in responding to chemical warfare agents and toxic industrial chemicals. The work is performed at the agency’s base in Washington, DC, with field deployment capabilities across the country, and the modification is administered under a performance-based structure consistent with FAR Part 15, though the exact contract type (e.g., FFP or cost-reimbursable) is not explicitly declared. The contracting activity is led by Adrianne E. Wells as the Contracting Officer, with Stuart Willison serving as the Program Point of Contact for OLEM/OEM, ensuring continuity in oversight and performance evaluation. No formal evaluation factors, clause provisions, or standardized FAR 52.2-series contract clauses are applied, as this is a regulatory justification document rather than a competitive solicitation. The basis for award rests entirely on the uniqueness of the incumbent’s technical progress, the absence of viable alternatives, and the operational necessity of maintaining system integrity without interruption. The modification was digitally signed on May 4, 2026, and the public notice was posted on SAM.gov on May 26, 2026, with prior public comment closed on April 1, 2026. No packaging, labeling, invoicing methods, accounting codes, payment details, or security clearance requirements are specified in the documentation. The only attachments referenced are the signed justification document and the SAM.gov notice, both in PDF format, and no socioeconomic certifications, representations, or subcontracting plans

General Info

Sole-source modification to fund PHILIS platform upgrades for EPA emergency response, award to MRIGLOBAL only capable vendor.

NAICS

336211 - Motor Vehicle Body Manufacturing

Place of Performance

DC

Set-Aside

NONE

Documents

1

68HERH25C0005 J&A - PHILIS Platform Modernization

PDF, Low priorityjustification-and-authorization
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseAwarded
Posted

Justification (J&A)

Awarded

Contract was awarded

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyEnvironmental Protection Agency → Land, Enforcement, And Air Division
Contacts1 person available
OfficeWashington, DC, 20460, USA
Office AddressWashington, DC, 20460, USA
Contacts
Adrianne Wells

Full Description

Show more

JUSTIFICATION FOR OTHER THAN FULL AND OPEN COMPETITION


in accordance with FAR Subpart 6.302-1


This document is being prepared pursuant to the content requirements prescribed in Federal Acquisition Regulation (FAR) Subpart FAR 6.303-2(b).


1. FAR 6.303-2(b)(1), Identification of the agency and the contracting activity, and specific


identification of the document as a "Justification for other than full and open competition":


Agency: U.S. Environmental Protection Agency


Contracting Activity: Office of Chief Procurement Officer (OCPO)


Office of Land, Enforcement and Air Division (LEAD)


Program Office: Office of Land and Emergency Management (OLEM)


Office of Emergency Management (OEM)


Program POC: Stuart Willison, OLEM/OEM


Project Identification: 68HERH25C0005: Portable High Throughput Integrated Laboratory


Identification Systems (PHILIS) Platform Modernization, Change Order


Proposed Source(s): MRIGLOBAL (UEI: HKQHNFKNKL15)



PLEASE SEE ATTACHED DOCUMENT Justification for Other Than Full and Open Competition_68HERH25C0005 signed.pdf FOR FULL DETAILS.

Similar Contracts

Same NAICS industry code

NAICS: 336211
New
DIBBS
BOARD, FLOOR TRAILER
Solicitation # SPE7L1-27-T-2381
This solicitation, issued by the Defense Logistics Agency (DLA) under solicitation number SPE7L1-27-T-2381, is for the procurement of one wood floorboard for M872 series semitrailers, identified by NSN 2510010672630. The required material is White Oak with a minimum average weight of 47 PCF and no individual piece less than 42 PCF. Technical specifications require a maximum moisture content of 22 percent, S2S surfacing with square edges, and specific dimensions of 1-3/8 inches in thickness and 7-1/2 inches in width. The boards must be treated with a water-repellent preservative that does not contain chlorinated phenols. The overall length is 39 feet 3-1/4 inches, and the item may be supplied as shorter full-width pieces provided they are at least 4 feet long and align with specified crossmember spacing. The contract is open for full and open competition and requires delivery within 10 days after order, with an original required delivery date of October 13, 2026. Shipping is FOB Origin, with the final destination and bulk break point located at Fort Leonard Wood, Missouri. Packaging must comply with ASTM D3951 and RP001, utilizing steel straps with metal or plastic edge protectors, while marking must adhere to MIL-STD-129. Quality assurance will be managed through destination inspection and acceptance using sampling methods per MIL-STD-1916 or ASQ H1331. Administrative requirements include the use of the Wide Area Workflow (WAWF) for electronic invoicing and compliance with various FAR and DFARS clauses, including the Buy American Act and the Berry Amendment.
DLA WEAPONS SUPPORT LAND SUPPLY CHAIN

POSTED

about 22 hours ago

DEADLINE

in 10 days
View Details
NAICS: 336211
New
DIBBS
25--PANEL,BODY,VEHICULAR
Solicitation # SPE7LX-27-U-0341
Solicitation SPE7LX-27-U-0341 is a total small business set-aside for the procurement of vehicular body panels (NSN 2510011887401) under NAICS code 336211. The Department of Defense, through the DLA Weapons Support Strategic Acquisition Program Directorate, is seeking quotes for an estimated quantity of 14 units. This procurement may result in a unilateral indefinite delivery contract with a one-year term or until an aggregate total of 350,000.00 dollars is reached. The contract includes a guaranteed minimum quantity of 2 units, with an estimated one order per year. Deliveries are required within 112 days after receipt of order, with shipping terms established as FOB Origin for deliveries within the continental United States. The contractor must adhere to strict quality and packaging standards, including MIL-STD-2073-1E for packaging, MIL-STD-129 for marking, and RP001 for palletization. Inspection and acceptance will occur at the point of origin, requiring a manufacturer's inspection system that complies with SAE AS9003 or ISO 9001. All electronic invoicing must be processed through the Wide Area WorkFlow system. Additionally, the awardee must comply with the Buy American Act, the Berry Amendment, and cybersecurity requirements under DFARS 252.204-7012 and CMMC Level 2. Quotes must be submitted electronically via DIBBS by the deadline of November 9, 2026.
DLA WEAPONS SUPPORT STRATEGIC ACQ PROGRAM DIRECTORATE

POSTED

1 day ago

DEADLINE

in 14 days
View Details
NAICS: 336211
New
SLED
Van Outfitting
Solicitation # 582-27-15466-1
The Texas Commission on Environmental Quality (TCEQ) is soliciting bids for the outfitting of two Mercedes 2500 All-Wheel Drive Sprinter Vans to serve as mobile ambient air quality monitoring platforms. The project requires the installation of a Tier 4 diesel generator, 10-gauge aluminum cabinetry, heavy-duty shelving, countertops, and two 18U server racks. To maintain vehicle warranties, the vendor must be an approved Mercedes outfitter. Key technical requirements include ensuring interior noise levels do not exceed 60 dB during generator operation and providing a two-year warranty covering electrical, generator, and water intrusion issues. The outfitting must be performed within 100 miles of Austin, Texas. The contract is governed by the laws of the State of Texas and requires compliance with OSHA standards, RoHS directives, and specific ISO standards for tolerancing and surface finishes. Bidders must provide a quote on a F.O.B. destination basis and maintain commercial general liability insurance with at least 500,000 dollars per occurrence for bodily injury. Award decisions will be based on technical compliance and the lowest bid, considering specific Texas Government Code statutory factors. Deliverables include the completed vehicles, electrical schematics, and a one-time training session for TCEQ staff. Responses are due by November 06, 2026, at 2:00 PM CST.
Texas Commission on Environmental Quality

POSTED

3 days ago

DEADLINE

in 11 days
View Details

More opportunities from Environmental Protection Agency → Land, Enforcement, And Air Division

Same awarding agency

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS