This Solicitation opportunity from Colorado was posted on January 4, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
The contract pertains to the development of new staff housing at the John Martin Reservoir, managed by the Colorado Department of Natural Resources - Division of Parks & Wildlife. The solicitation, numbered 2024000104, was posted on January 4, 2024, with a deadline for responses set for January 9, 2024. The project falls under the NAICS code 624221, which covers residential mental health and substance abuse facilities, indicating the scope involves housing services or facilities. The contract is part of a broader effort to support staff accommodation needs at the reservoir site within Colorado.
The primary point of contact for this solicitation is Chase Keltgen, who can be reached via email or phone for further details. The organization handling this project is a State and Local Government Entity (SLED), and the contract does not specify a set-aside or size range, suggesting it may be open or unspecified in scope. Interested parties can access additional information or submit responses through the provided online portal link. This initiative aims to enhance staff housing infrastructure, supporting operational efficiency and personnel welfare at the reservoir location.
HighAI Summary for Appendix A - General Conditions for Capital Construction (July 18, 2018): Dated July 18, 2018, this document outlines the General Conditions for Capital Construction for Colorado Parks and Wildlife projects. It serves as a standard part of all contracts and provides comprehensive guidelines on bidding requirements, award execution, scope of work, control of materials, legal responsibilities, and payment terms.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Appendix E - Manufacture Brochure (13'X 68' Dormitory): A manufacturer's product brochure for 13'x68' 5-bed, 5-bath dormitory units. The document details unit features including individual bedrooms/bathrooms, all-electric appliances, fire sprinklers, HVAC units, and a 160mph wind speed rating.
PDF
PDF, High priority: read this firstifb
HighAI Summary for C20JM1 IFB1 2024*104 - John Martin Reservoir State Park New Staff Housing: Invitation for Bids (IFB) issued by Colorado Parks and Wildlife for the installation of a new manufactured residence at John Martin Reservoir State Park. The document includes the invitation, bid schedule with CLIN-like items (mobilization, site prep, residence installation, and utilities), and submission instructions. Bids were due December 19, 2023.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Geotechnical Engineering Report - John Martin Reservoir State Park Upgrade: Dated May 3, 2001, this geotechnical engineering report by Terracon (Project No. 23015618) provides subsurface soil and bedrock analysis for proposed upgrades at John Martin Reservoir State Park in Bent County, Colorado. The document includes recommendations for foundation systems, floor slab design, sewage systems, and earthwork for a new maintenance building, water storage tank, and wetland ponds.
PDF
PDF, High priority: read this firstifb
HighAI Summary for IFB1 2024-104: John Martin Reservoir State Park Staff Housing: Invitation for Bid (IFB1 2024-104) for the installation of one new manufactured residence, including furnishings and utilities, at John Martin Reservoir State Park in Bent County, Colorado. Bids are due by December 19, 2023.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for IFB 2024-104 - Addendum No 1 - Staff Housing: Addendum No 1 for IFB 2024-104 regarding Staff Housing, dated December 15, 2023. This document updates the bid opening date to January 9, 2024, and the deadline for written questions to January 4, 2024.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for IFB 2024-104 Addendum No 2 - JMR SP Staff Housing: Addendum No 2 dated December 22, 2023, for IFB 2024-104 (Project #C20JM1) regarding New Staff Housing at John Martin Reservoir State Park. This document replaces the existing Bid Schedule, Measurement and Payment Section, and specific technical specifications (Sections 03300 and 13120). It also includes a detailed Q&A section addressing concrete requirements, foundation design, skirting, electrical service, and tax exemptions.
DOCX
DOCX, Low prioritybid-bond
LowAI Summary for Appendix D - Sample State Bid Bond Form: This document is a sample State Bid Bond Form from the State of Colorado Office of the State Architect State Buildings Program. It outlines the bond agreement where the Principal submits a proposal with a guaranty of at least 5% of the proposal amount as liquidated damages if the Principal defaults. The bond ensures the Principal maintains the proposal for 30 days or executes the required agreement and bonds if awarded. It includes signature requirements for the Principal and Surety, and notes that the bond must be accompanied by a properly executed Power of Attorney. Failure to provide these will result in the bid being non-responsive.
PDF
PDF, Low prioritypresolicitation
LowAI Summary for IFB1: 2024-104 - John Martin Reservoir SP New Staff Housing Pre-Bid Meeting: Notice for a non-mandatory pre-bid conference for the John Martin Reservoir SP - New Staff Housing project (IFB1: 2024-104, CPW Project #C20JM1). The meeting is scheduled for December 11, 2023, at 1:00 PM at the project site in Hasty, Colorado.
PDF
PDF, Low priorityindustry-day
LowAI Summary for IFB1: 2024-104 - John Martin Reservoir State Park Staff Housing Pre-Bid Attendance: Attendance sign-in sheet for the pre-bid meeting held on December 11, 2023, regarding the John Martin Reservoir State Park - New Staff Housing project (IFB1: 2024-104). The document lists representatives from Colorado Parks & Wildlife and several attending contracting firms.
PDF
PDF, Low prioritypresolicitation
LowAI Summary for IFB 2024-104: John Martin Reservoir State Park - New Staff Housing Pre-Bid Agenda: Non-mandatory pre-bid conference agenda dated December 11, 2023, for the installation of new staff housing facilities at John Martin Reservoir State Park (IFB 2024-104). The document outlines the question deadline (Dec 14), bid submission deadline (Dec 19), bonding requirements for bids over $150,000, and a project completion timeline of 60 calendar days from the Notice to Proceed, with a final deadline of June 30, 2024.
PDF
PDF, Low prioritycontract-document
LowAI Summary for State of Colorado Construction Agreement - Sample: A sample construction agreement template for the State of Colorado, specifically for the Department of Natural Resources. The document outlines the signature requirements, project summary table, terms of performance, payment structures, and general legal provisions including jurisdiction and modification rules.
OCTE
OCTET-STREAM
AI Contract Breakdown
Uniform Contract Format
Sign up to view the full breakdown with detailed analysis of each section.
Timeline
PhaseClosed
Posted
Solicitation
Response Deadline
Deadline has passed
Submission Closed
Find active opportunities like this
Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.
Organization & Contact Information
Show more
AgencyColorado Department of Natural Resources - Division of Parks & Wildlife