Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Defense was posted on February 24, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Joint Base Pearl Harbor-Hickam Wave Attenuator Install

Closed
NAVMWR-25-R-0007Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Agricultural INNOVATION Farm Project for San Marcos Unified SD
Solicitation # 2026-21
The San Marcos Unified School District is soliciting bids for the Agricultural INNOVATION Farm Project (Solicitation 2026-21) located at 99 Cassou Rd, San Marcos, California. The project scope involves the demolition of an abandoned electrical pole, water pump, and fencing, followed by the installation of underground water and electrical utilities, irrigation lines, a gravel service road, shade structures, storage containers, arbors, and designated planting areas. Work must be performed in strict accordance with the technical specifications, project drawings, and soil report. The estimated period of performance begins December 1, 2026, with a required completion date of April 1, 2027. The contract will be awarded to the lowest responsible bidder. Qualified bidders must hold a valid California Contractor's License and be registered with the California Department of Industrial Relations (DIR), as the project is subject to prevailing wage requirements. Submission requirements include a bid bond for 10 percent of the contract amount, a non-collusion declaration, and references, all submitted via the OpenGov e-procurement portal by November 2, 2026. The successful contractor must provide performance and payment bonds equal to 100 percent of the contract value and adhere to a 3 percent Disabled Veteran Business Enterprise (DVBE) participation goal. All materials must be delivered in original packaging and comply with UL 969 marking and labeling standards.
Curriculum and Instruction

POSTED

about 10 hours ago

DEADLINE

in 5 days
NAICS: 237990
New
SLED
Water Treatment Plant Maintenance Package ‘A’ Degasifier Package (Project No. 25-4261A)
Solicitation # IFB-395-26-JM
The City of Hollywood, Florida, is soliciting bids for the Water Treatment Plant Maintenance Package A Degasifier Package (Project No. 25-4261A). The scope of work involves the replacement of packing media in three degasifiers (units 2, 3, and 4) at the Water Treatment Plant located at 3441 Hollywood Boulevard. Key deliverables include power washing the vessels, replacing media support grids and differential pressure gauges, performing vessel disinfection, and resealing access doors. To ensure continuous plant operation, the contractor must work on only one unit at a time. The project requires a contractor with a project manager possessing at least five years of experience and a track record of at least five similar degasifier servicing projects, as well as the provision of a factory-trained service technician for performance testing. Bids must be submitted electronically via the OpenGov portal by November 4, 2026, at 3:00 PM. The contract will be awarded to the lowest responsive and responsible bidder. Financial requirements include a bid guarantee of 5 percent of the bid amount and the provision of performance and payment bonds. Comprehensive insurance coverage is mandated, including general liability, pollution liability, and vehicle liability, with the City of Hollywood named as an additional insured. The project timeline specifies substantial completion within 180 days and final completion within 210 days, with liquidated damages set at 500 dollars per day. Additionally, the contractor must comply with federal prevailing wage requirements for Broward County and provide a twelve-month warranty against poor workmanship and faulty materials.
Public Utilities

POSTED

about 12 hours ago

DEADLINE

in 20 days

AI Contract Overview

Show more

This contract involves the comprehensive design, procurement, and installation of a floating wave attenuator system at Rainbow Bay Marina in JBPHH, Hawaii. The project encompasses all necessary investigation, surveying, demolition, relocation, temporary construction, and restoration to deliver a fully operational facility. The core component is a approximately 300-foot-long floating wave attenuator, which must be securely anchored to the ocean floor and capable of withstanding significant wave heights and environmental forces as specified in the wind wave analysis. The design process includes detailed engineering, shop drawings, and specifications for the attenuator, mooring systems, anchoring, signage, and related components, ensuring compliance with all governing requirements. The installation involves securing the attenuator with appropriate anchoring systems—either elastic materials like Sea Flex or rigid chains or cables—designed to resist the environmental loads. The project also includes installing solar-powered LED lights for visibility and four mooring balls to accommodate vessels up to 50 feet in length, all in accordance with marine spacing standards. No utilities are to be connected to the system. The project has received all necessary approvals, and the work is scheduled to be completed following the solicitation response deadline, with key contacts provided for contract management.

General Info

Installation of wave attenuator at Joint Base Pearl Harbor-Hickam, responses by March 6, 2025.

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

Honolulu, HI, 96818, USA

Set-Aside

NONE

Documents

4

NAVMWR-25-R-0007 Amendment 0001

PDF, High priority: read this first1 page · amendment
High

NAVMWR-25-R-0007 Amendment 0002

PDF, High priority: read this first9 pages · amendment
High

NAVMWR-25-R-0007 Amendment 0003

PDF, High priority: read this first26 pages · amendment
High

NAVMWR-25-R-0007 Solicitation

PDF, High priority: read this firstrfp
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

6 updates
PhaseClosed
Posted

Solicitation

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

The point of contact changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Deadline changed

Response deadline changed from Feb 28, 2025 to Mar 6, 2025.

Notice updated

Notice details unchanged. Attachments may have changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Commander Navy Installations Command
Contacts2 people available
OfficeMILLINGTON, TN, 38055-6500, USA
Office AddressMILLINGTON, TN, 38055-6500, USA
Contacts
A'Keesha Stark Contracting Officer
Nika Maldonado Contract Specialist

Full Description

Show more
This project includes all investigation, surveying, and construction necessary to design and install a wave attenuator as described herein. The project includes all demolition, relocation, temporary construction and restoration necessary to produce a complete and useable facility. The project includes installing a new floating wave attenuator system that is approximately 300 feet long and securing it to the ocean floor in the configuration noted herein. The work includes, but is not limited to the following: 1. Design of Wave Attenuator Site Development: There is not landside site development work required. The project has received approval from all authorities as referenced in Section J of the attached solicitation. The work includes developing the detailed engineering, shop drawings and specifications for the floating wave attenuation systems, auger piles, mooring systems (chains, cables, etc) signage, and all related appurtenances and elements as well as specifying construction techniques in accordance with all requirements governing Rainbow Bay Marina JBPHH, Hawaii for certain components of the construction work such as anchoring operations for a complete and usable floating wave attenuation system. 2. Purchase and Installation of Wave Attenuator The new wave attenuator shall be a - whisper wave product (or equal) and secured to the ocean bottom as required. Reference Attachment Section, Wave Attenuator Layout. The attenuation system shall be able to withstand the greater of; waves at least 4 high or as called for in the wind wave analysis. Anchorage to the sea bottom (encl 3c) shall be provided and installed in sufficient size, quantity and spacing to resist the environmental loads listed in the wind wave analysis. The connective ties that connect the floating wave attenuator to the anchors shall be as recommended by the manufacturer and able to withstand the forces listed in the wind wave analysis (encl 3d). They shall be of an appropriate material, that is elastic in nature (i.e. Sea Flex or equal) or rigid (i.e. chains or cables). No utilities are to be installed in or extended to the wave attenuator system. Solar-powered LED lights to mark the location of the floating wave attenuator shall be installed as required by applicable law. Four mooring balls shall be installed an accordance with Marine spacing standards to allow mooring of vessels up to 50 in length.

More opportunities from Department Of Defense → Commander Navy Installations Command

Same awarding agency

NAICS: 339920
New
Federal
Monterey Golf Range Technology
Solicitation # NAVMWR-27-R-0001
Solicitation NAVMWR-27-R-0001 is a design-build project for the renovation and expansion of the Monterey Golf Driving Range at NSA Monterey. The project aims to meet increased customer demand by repairing existing bays and adding 12 new hitting bays via a two-story hitting deck. The scope of work includes complete architectural and engineering designs for all civil, structural, electrical, and mechanical elements, the installation of a golf range technology system for ball flight tracking and interactive virtual golf, the construction of a 250 square foot range maintenance building, a chain-link fence evaluation, and the installation of three surveillance cameras. All work must comply with federal, state, and local codes, including the Uniform Federal Accessibility Standards Architectural Barriers Act. The contract will be awarded based on a best-value tradeoff between technical factors and price, with price weighted approximately equal to technical evaluations. Technical evaluation focuses on the proposed design solution, qualifications and experience, and the project execution method. Proposals must be submitted in two separate volumes, Technical and Price, by December 15, 2026. Key requirements include the appointment of a Chief of Construction Quality Control with at least 10 years of experience, the provision of payment and performance bonds by the prime contractor, and adherence to Davis-Bacon Act wage determinations. The government will retain 10 percent of all payments until final inspection and the delivery of all closeout documentation.
Sporting and Athletic Goods Manufacturing

POSTED

6 days ago

DEADLINE

in about 2 months
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS