Joint Outfall F Unit 3A Trunk Sewer Rehabilitation

Active
20261019020State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Solicitation JO-P-0505 is a project for the Sanitation Districts of Los Angeles County to rehabilitate the Joint Outfall F Unit 3A Trunk Sewer in Whittier, California. The scope of work involves cleaning approximately 14,238 linear feet of 60-inch diameter reinforced concrete pipe and installing a 54-inch nominal diameter fiberglass reinforced plastic liner pipe. Additionally, the project includes the rehabilitation of 28 manholes and three structures with protective coating systems, the rehabilitation of one structure for the Joint Outfall A Unit 8 Trunk Sewer with a protective liner system, and the replacement of one manhole pressure frame and cover at MH F 0050. Key deliverables include pre- and post-lining CCTV inspections, the implementation of standby flow bypass systems, and full site restoration. The contract requires adherence to the 2024 Standard Specifications for Public Works Construction and specific District amendments. Quality assurance is managed through strict inspection and testing protocols, including a minimum pull strength of 20 pounds per linear inch for PVC protective lining systems, tested every 1,000 square feet. Bidders must provide a bid bond or certified check for 10 percent of the total bid amount. The project is classified as a public work subject to California prevailing wage laws and includes an aspirational goal of 20 percent participation from certified MBE, WBE, DBE, DVBE, or SBE firms. The successful bidder will have 15 calendar days to execute the agreement and provide necessary insurance and bonds. Notably, the contract allows for the suspension of work to accommodate moratorium periods related to the LA28 Olympic and Paralympic Games.

General Info

Rehabilitation of the Joint Outfall F Unit 3A Trunk Sewer in Whittier, California.

Documents

1

Joint Outfall F Unit 3A Trunk Sewer Rehabilitation - Instructions to Bidders

PDF, High priority: read this firstrfb
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Sanitation Districts of Los Angeles County
Contacts1 person available
OfficeN/A

Full Description

Show more
Bid #JO-P-0505: This project will rehabilitate approximately 14,200 linear feet of existing 60-inch diameter reinforced concrete pipe for the Joint Outfall F Unit 3A Trunk Sewer with 54-inch nominal diameter fiberglass reinforced plastic (FRP) liner pipe, rehabilitate approximately twenty-eight (28) manholes with a protective coating system, and rehabilitate three (3) structures with a protective coating system. This project will also rehabilitate approximately one (1) structure for the Joint Outfall A Unit 8 Trunk Sewer with a protective liner system and all appurtenant work.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont, North Carolina, with an estimated value of 16,690,000 dollars. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and comprehensive upgrades to the Morgans Branch Pumping Station. Key infrastructure improvements include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The contractor is responsible for delivering a fully operational facility, including the installation of pumps, a generator, odor control equipment, new gravity sewers, and manholes, while managing by-pass pumping, testing, and commissioning. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on MWBE compliance through the submission of Good Faith Efforts and Table A documentation. Bids are due by November 12, 2026, and must be submitted using the EJCDC C-410 Bid Form. The project is governed by EJCDC standard general and supplementary conditions, requiring performance and payment bonds and proof of insurance. Technical standards include AWWA Specification C-600 for pipelines, NEMA MG1 for motors, and AWS D1.2 for aluminum welding. Project administration is managed by the City of Belmont with Willis Engineers serving as the project engineer. Payment is processed via Applications for Payment, with terms set at 30 days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 8 hours ago

DEADLINE

in 20 days
View Details

More opportunities from California → Sanitation Districts of Los Angeles County

Same awarding agency

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS