Kashmere Elevators Rehab
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The Kashmere Elevators Rehab project involves the comprehensive rehabilitation of elevator systems at the Kashmere Bus Operating Facility in Houston, Texas, including the demolition of existing elevator interiors, installation of new interiors, pumps, pump housing units, controllers, and associated shaft updates, along with necessary fireproofing. The contractor is responsible for ensuring full operational restoration of the elevators, which includes procuring all required permits, providing replacement hydraulic fluid, and conducting all necessary safety testing to meet regulatory and METRO standards. Work must be performed in strict compliance with Contract Documents, including Exhibit A and Exhibit B, and must adhere to local Houston building, plumbing, electrical, mechanical, and fire codes, as well as ADA and Section 504 accessibility requirements. All materials must be delivered in manufacturer-original, unopened packaging, stored in dry, climate-controlled environments away from sunlight and debris, and labeled with brand, manufacturer, and material type information. The contractor must maintain on-site records of shop drawings, material samples, test reports, and as-built documentation, with final acceptance contingent upon METRO’s inspection and resolution of all punch list items. The project has a fixed 365-calendar-day performance period beginning on the Notice to Proceed, inclusive of eight holidays and ten weather-impacted days, with no additional time allowances. Bids are evaluated solely on the lowest total aggregate price under a Lowest Price Technically Acceptable (LPTA) methodology, requiring full responsiveness and compliance with all bid requirements; failure to bid on all items results in rejection. All proposals must be submitted electronically via the BONFIRE portal and as one hardcopy to METRO’s Procurement Division by 2:00 p.m. CST on June 10, 2026. The contractor must comply with stringent security protocols, including badge requirements, vehicle searches, and prohibitions against unauthorized use of METRO equipment or substances on-site. Subcontractor approvals are mandatory, contract assignments require written consent, and substitution of materials or equipment must be approved through formal change orders. The contractor is responsible for obtaining and paying for all permits, though METRO will reimburse City of Houston permit and bond fees at cost. The contracting officer retains full authority to reject nonconforming work, require immediate removal of personnel, and issue final acceptance only after verified completion. All work must be conducted in alignment with METRO-specific technical specifications and quality controls, with no trade-offs permitted between price and technical compliance.
General Info
Agency
NAICS
Place of Performance
TX, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Interested Companies (48)
See All 48 Interested Companies
Start a free trial to view all interested companies, their contact details, and full contractor profiles.
Full Description
More opportunities from Texas → Metro Houston
Same awarding agency
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 650+ contractors already using CLEATUS