Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Louisiana was posted on August 5, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Kelly Dr Drainage

Closed
923456-26-28-1State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
FDC-214-102565.1
Solicitation # FDC-214-102565
Project FDC-214-102565.1 involves the demolition of an existing concrete dam and associated infrastructure at Ryerson Station State Park in Richhill Township, Greene County, Pennsylvania. Managed by the Pennsylvania Department of Conservation and Natural Resources, the scope of work encompasses site preparation, including the installation and removal of erosion and sediment control measures and the implementation of a traffic control plan. Technical requirements include stripping and stockpiling topsoil, surface water control, dewatering subgrades, excavation, and the placement of select fill. The project concludes with site restoration, including topsoil application and seeding in all disturbed areas. All work must adhere to specific ASTM International standards for soil analysis and compaction, and the contractor is required to provide a complete set of as-built drawings upon completion. The contract will be awarded to the lowest responsible and responsive bidder, with an engineer's estimate exceeding 1 million dollars. Bidders must meet mandatory participation goals of 19 percent for Small Disadvantaged Businesses and 3 percent for Veteran Business Enterprises. Required securities include a bid guaranty, a 100 percent performance bond, a 100 percent material and labor payment bond, and a 50 percent maintenance bond. Contractors must comply with extensive Pennsylvania state labor laws, including the Prevailing Wage Act and the Construction Workplace Misclassification Act. Payments are processed via Automated Clearing House, and the contractor is responsible for engaging an independent testing laboratory for quality control services, subject to oversight by the Department's quality assurance program.
Commonwealth of Pennsylvania - Department of Conservation and Natural Resources

POSTED

about 12 hours ago

DEADLINE

in 16 days
NAICS: 237990
New
SLED
Design Build Services For 8 New Pickleball Courts With Lighting
Solicitation # S-1397
The City of Garden Grove is soliciting Statements of Qualifications from Design Build Entities for the design and construction of eight new pickleball courts with lighting at Garden Grove Park. This project, estimated to cost between 1,000,000 and 1,200,000 dollars, includes all labor, materials, engineering, and construction services, including site preparation, surfacing, striping, fencing, and electrical infrastructure. All improvements must be ADA-compliant and adhere to California Public Contract Code Section 20164 and Garden Grove Municipal Code. While the contractor is responsible for most testing and inspections, the City will retain a third-party consultant specifically for soil compaction testing. The procurement follows a two-step process where the City will first shortlist the three highest-scoring firms based on experience, technical capabilities, safety records, and financial capacity. These shortlisted firms will then be invited to submit a proposal for final selection based on best value. Interested entities must submit their SOQ via the Planet Bids portal by November 20, 2026. Mandatory requirements include a Certification Form, a Firm Information Form, and a Surety Declaration Form confirming the capacity to obtain performance and payment bonds for 100 percent of the project value from a surety with an AM Best rating of A- Class VII or better.
City of Garden Grove

POSTED

about 13 hours ago

DEADLINE

in 23 days

AI Contract Overview

Show more

The Kelly Dr Drainage solicitation, issued by the St. Tammany Parish Government in Louisiana, seeks competitive bids for drainage improvement and slope stabilization work along Kelly Dr (R081005) in Slidell, Louisiana. The scope of work requires the contractor to provide all labor, equipment, and materials to construct structural drainage walls, stabilize eroded slopes, perform proper grading and compaction, remove unsuitable materials, place topsoil and sod, and install concrete structures meeting LA DOTD Standard Specifications for Roads and Bridges, particularly Sections 305 and 401. The project must be completed within 30 calendar days from the Notice to Proceed, with schedule extensions only permitted for inclement weather or approved change orders. All work must conform to federal, state, and local regulations, including compliance with Title VI, Title VII, the ADA, and Executive Order 11246, and must be performed with new, high-grade materials and workmanship. A resident superintendent must be present on-site continuously, and any replacement requires prior written approval from the Parish. The procurement follows a lowest price technically acceptable (LPTA) methodology, where price is the dominant factor in award, and technical acceptability is assessed on a pass/fail basis without trade-offs. No contract value is specified as pricing fields in the bid schedule are left blank for offerors to complete; however, unit prices are listed for topsoil, concrete structures, mobilization, and temporary signage as lump-sum or volume-based items. Proposals must be submitted via BidExpress or LaPAC electronic portals by 2:00 PM CT on August 20, 2026, or delivered physically to the Parish’s procurement office. Required attachments include a pricing sheet, sample contract, insurance requirements, affidavits affirming no criminal convictions under state law, a certified corporate resolution, and a certificate of insurance naming the Parish as an additional insured with a $1 million commercial general liability limit, $1 million auto liability, statutory workers’ compensation, and $1 million pollution liability coverage. Subcontractors must meet identical insurance and compliance standards. The Parish retains ownership of all records, which must be maintained for five years after final payment, and may terminate the contract for convenience or cause, or if funds are not appropriated. The contractor bears full liability for defects, safety, and all costs associated with corrections, and unauthorized changes are not compensable. No federal acquisition regulation (FAR) clauses are explicitly cited,

General Info

Kelly Dr Drainage solicitation opens Aug 5, 2026, closes Aug 20, 2026, for Louisiana state/local entities, contact Shawn Hoover.

Documents

1

Quote Request 26-28-1 - Kelly Dr Drainage

PDF, High priority: read this firstrfq
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyLouisiana → St. Tammany Parish Government
Contacts1 person available
OfficeLA, USA
Office AddressLA, USA

Full Description

Show more
Kelly Dr Drainage

More opportunities from Louisiana → St. Tammany Parish Government

Same awarding agency

NAICS: 237310
New
SLED
Lake D' Este Dr Drainage
Solicitation # 923456-26-34-1
The St. Tammany Parish Government is soliciting quotes for the Lake D' Este Dr Drainage project in Slidell, Louisiana. The selected contractor must possess a classification for Highway, Street, and Bridge Construction to provide all labor, equipment, and materials necessary for drainage improvements and road repairs. The scope of work includes removing failed inserts, installing new piping, repairing catch basins, installing CIPP liners, and replacing concrete panels. The project must be completed within 45 calendar days from the issuance of the Notice to Proceed. The contract will be awarded to the lowest monetary quote that is in full compliance with the request. Bidders must submit their quotes in writing via certified mail, hand-delivery, or courier by November 10, 2026. Required documentation includes a pricing sheet, corporate resolution, and certificates of liability insurance. The contractor is required to provide performance and payment bonds and must adhere to strict insurance and safety standards, including the preservation of public and private property. Payment is structured through monthly certificates for partial payment, with 90 percent of work and materials paid for contracts under 500,000 dollars. The final 10 percent is released 45 days after filing acceptance in the Mortgage Office and securing a Clear Liens and Privilege Certificate. The contract includes non-negotiable terms regarding audits, which may occur up to five years after project acceptance, and requires compliance with various federal civil rights and environmental laws, including the Clean Air and Clean Water Acts.
Highway, Street, and Bridge Construction

POSTED

2 days ago

DEADLINE

in 14 days
View Details
NAICS: 237310
New
SLED
Wildwood Farms Subdivision Drainage
Solicitation # 923456-26-33-1
The Wildwood Farms Subdivision Drainage project, solicitation number 923456-26-33-1, is issued by the St. Tammany Parish Government in Louisiana. The scope of work requires a contractor with a Highway, Street, and Bridge Construction classification to provide all labor, equipment, and materials to improve drainage in Pearl River, Louisiana. Specifically, the project involves removing and replacing drain pipes, catch basins, and driveway pipes along Max Mercer Rd (R061026) and Cecil Fleming Rd (R061009). All work must be completed within 45 calendar days from the issuance of the Notice to Proceed. The contract will be awarded to the lowest monetary quote that complies with the request. Bidders must submit sealed quotes via certified mail, hand-delivery, or courier to the Procurement Department in Mandeville, Louisiana, by November 12, 2026, at 2:00 PM. Required submissions include a W-9 for new vendors and evidence of corporate authority for signing entities. The successful contractor must maintain specified insurance coverage, provide a performance and payment bond for the full contract amount, and adhere to MUTCD and LADOTD standards for traffic and pavement markings. Payment terms for contracts under $500,000 allow for certificates equal to 90% of work performed and materials stored, with the final 10% released 45 days after filing acceptance and securing a Clear Liens and Privilege Certificate. Contractors are responsible for all public safety measures and must comply with various federal non-discrimination and equal opportunity laws. Project acceptance is determined through a joint inspection between the Parish and the contractor to establish substantial completion and a final punch list.
Highway, Street, and Bridge Construction

POSTED

6 days ago

DEADLINE

in 16 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS