This Solicitation opportunity from Pennsylvania was posted on May 29, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Sealed bids for the Raye Road Sewer Replacement project in Caln Township, Chester County, Pennsylvania, are due electronically via PennBid by 2:00 P.M. local time on Tuesday, June 30, 2026, with all bids to be opened online at that time. The project involves installing approximately 560 linear feet of 8-inch gravity sanitary sewer main, a 90-foot Redi-Rock retaining wall, three sewer laterals with concrete encasements across a stream channel, four new concrete manholes, and modifications to existing manholes along a residential stream corridor within easements between Raye Road and Norma Drive. Completion of the work includes traffic control measures, restoration of paved and unpaved surfaces, and comprehensive testing of the new sewer system. All bid documents are available free of charge on PennBid as of May 29, 2026, though an award fee applies to the successful bidder. Each bid must include a bid bond or certified check equal to at least 10% of the bid amount, and no bid may be withdrawn for the period specified in the bid form. The selected bidder must provide Performance and Payment Bonds equal to 100% of the contract amount and a Maintenance Bond equal to 15% of the contract amount, using the forms specified in the Contract Documents. The contract is subject to the Pennsylvania Prevailing Wage Act and will be awarded on a Lowest Price Technically Acceptable basis, with responsiveness and responsibility determined prior to price consideration. The Owner retains the right to waive irregularities, reject all bids, and select the bid most favorable to its interests. Work must comply with all applicable codes, manufacturer specifications, and industry standards, and inspections will be conducted at the project site by the Engineer and Owner, with the Contractor bearing full responsibility for arranging and paying for all required tests and certifications. The contract does not specify a fixed value, but includes a $20,000 stated allowance for optional work. All materials and equipment must be properly stored and protected, with labeling conforming to UL 969 and ANSI Z535 standards using only machine-printed, durable labels. The contract prohibits collusion, requires certification of regulatory compliance, and demands that bidders disclose any prior defaults or violations. No formal FAR clauses, federal accounting codes, electronic invoicing systems, or named contracting officers are referenced, and the contract type remains unspecified. Submission must be completed through PennBid using all required forms,
General Info
Caln Township seeks electronic bids for King’s Grant Pump Station electrical upgrades, due June 15, 2026.
HighAI Summary for 260311 - Excavation, Backfill and Compaction Specifications for King's Grant Pump Station Upgrades: This document, dated March 2026, provides detailed technical specifications for excavation, backfill, and compaction work related to the King's Grant Pump Station Upgrades project by Caln Township Municipal Authority. It covers general work descriptions, quality assurance requirements including compaction testing standards (ASTM and Pennsylvania DOT methods), submittal requirements for certifications and test results, job conditions such as excavation classification and compaction percentages, traffic control, and protection of utilities and vegetation. The document also specifies materials for pipe bedding and embedment, referencing AASHTO and PennDOT standards. It serves as a critical guide for contractors to ensure compliance with project and regulatory requirements.
PDF
PDF, High priority: read this firstwage-determination
HighAI Summary for 260428 - IFB Drawings Prevailing Wage Determination: This document is an appendix to the IFB Drawings for the Kings Grant Pump Station Upgrades project by Caln Township Municipal Authority, dated March 2026. It provides the prevailing minimum wage determination for various labor classifications involved in the electrical upgrades at the wastewater pump station in Caln Township, Chester County. The document includes detailed hourly rates, fringe benefits, and total compensation for trades such as electricians, carpenters, laborers, and others, with effective dates ranging from 2018 to 2026. It serves as a critical reference for compliance with labor wage laws for the project awarded on 3/30/2026.
PDF
PDF, High priority: read this firstwage-determination
HighAI Summary for Appendix A - Prevailing Wage Determination for Kings Grant Pump Station Upgrades: This document is Appendix A - Prevailing Minimum Wage Determination for the Kings Grant Pump Station Upgrades project in Caln Township, Chester County. Issued by the Bureau of Labor Law Compliance, it provides detailed prevailing wage rates for various labor classifications involved in electrical upgrades at a wastewater pump station. The determination date is December 5, 2025, with contract award date March 30, 2026. It includes hourly rates, fringe benefits, and total compensation for trades such as electricians, carpenters, laborers, and others, effective from various dates primarily in 2024 and 2025. The document supports compliance with wage laws for the building project classified under serial number 25-10478.
PDF
PDF, High priority: read this firstwage-determination
HighAI Summary for Appendix B - Public Works Employment Verification Form for King's Grant Pump Station Upgrades: This document is Appendix B, a Public Works Employment Verification Form related to the King's Grant Pump Station Upgrades project in Caln Township, Chester County, PA, dated March 2026. It affirms compliance with the Public Works Employment Verification Act through the federal E-Verify Program, ensuring all employees hired post January 1, 2013, are authorized to work in the U.S. Contractors and subcontractors must verify employment eligibility within five business days of hire and maintain documentation for audits or investigations. The form requires an authorized company representative's attestation of the information's truthfulness and acknowledges legal sanctions for false submissions.
PDF
PDF, High priority: read this firstsow
HighAI Summary for Division 01 - General Requirements for King's Grant Pump Station Upgrades: This document, dated March 2026, is the Division 01 - General Requirements section for the King's Grant Pump Station Upgrades project by Caln Township Municipal Authority. It outlines contract considerations including schedule of values, applications for payment, change procedures, and alternatives. It details coordination and meetings such as preconstruction and progress meetings, submittal procedures, quality control measures, construction facilities and temporary controls, material and equipment handling, system starting, and contract closeout procedures. The document provides instructions on submittals, progress schedules, product data, and cutting and patching requirements, serving as a foundational statement of work for project execution and administration.
PDF
PDF, High priority: read this firstsow
HighAI Summary for Division 01 - General Requirements for King's Grant Pump Station Upgrades: This document, dated March 2026, is the Division 01 - General Requirements section for the King's Grant Pump Station Upgrades project by Caln Township Municipal Authority. It outlines contract considerations including schedule of values, applications for payment, change procedures, and alternatives. It details coordination and meetings such as preconstruction, site mobilization, progress, and pre-installation meetings. The document covers submittal procedures, quality control measures, construction facilities and temporary controls, material and equipment handling, system starting, and contract closeout procedures. It serves as a foundational statement of work guiding project execution and administrative processes.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Division 26 - Electrical Materials and Methods Specification: This document is the Division 26 specification section titled 'Basic Electrical Materials and Methods' for the Caln Township Municipal Authority Kings's Grant Pump Station Upgrades dated March 2026. It covers general electrical installation requirements, coordination drawings, reference standards, submittals, quality assurance, field conditions, product manufacturers, and execution details. Key content includes coordination drawing requirements, electrical equipment installation standards, testing and calibration compliance, and interruption of existing electric service protocols. The document serves as a technical guide for electrical work execution and quality control on the project.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Division 31 12 23 - Restoration of Paved Surfaces - King's Grant Pump Station Upgrades: This document is a technical specification section (31 12 23) for the Restoration of Paved Surfaces related to the King's Grant Pump Station Upgrades project by Caln Township Municipal Authority, dated March 2026. It details the scope of work including temporary paving, permanent paving, and driveway restoration. It references Pennsylvania Department of Transportation standards and specifies materials such as bituminous concrete and aggregates. Execution requirements cover temporary paving maintenance, permanent paving construction and compaction, driveway restoration methods for various surfaces, highway signage reinstallation, tolerances for flatness and thickness, and pavement striping restoration. The document ensures compliance with state specifications and coordination with project representatives and authorities.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Division 31 - Earthwork Excavation, Backfill and Compaction Specifications: This document, dated March 2026, details the specifications for excavation, backfill, and compaction work for the King's Grant Pump Station Upgrades under Caln Township Municipal Authority. It covers general requirements including quality assurance, compaction testing standards (ASTM and Pennsylvania DOT methods), submittals, job conditions, and protection of utilities and vegetation. The document specifies materials and methods for pipe bedding and embedment, compaction percentages, traffic control, and excavation classifications. It references related sections for traffic regulation and surface restoration, ensuring compliance with state regulations and standards.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Division 32 - Exterior Improvements: Restoration of Paved Surfaces: This document is a technical specification section (32 12 23) for the restoration of paved surfaces as part of the King's Grant Pump Station Upgrades project by Caln Township Municipal Authority, dated March 2026. It details the scope of work including temporary and permanent paving, driveway restoration, and related quality assurance standards referencing Pennsylvania Department of Transportation publications. The document specifies materials such as bituminous paving and aggregates, execution requirements for paving and driveway restoration, traffic control measures, tolerances for flatness and thickness, and requirements for pavement striping and signage restoration.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Division 40 - Process Integration - Kings's Grant Pump Station Upgrades: This document is a technical specification for process instrumentation related to the Kings's Grant Pump Station Upgrades project by Caln Township Municipal Authority, dated March 2026. It covers general requirements, submittals, warranty, product performance, and detailed descriptions of level instruments including backup float controllers, float switches, and submersible level transducers. The document specifies manufacturers, functional descriptions, features, electrical and construction requirements, and warranty terms. It serves as a guide for contractors and instrumentation suppliers to ensure proper supply, installation, and integration of process instrumentation systems.
PDF
PDF, High priority: read this firstdrawings
HighAI Summary for IFB Drawings for Kings Grant Pump Station Upgrades: This document contains the drawings for the Kings Grant Pump Station Upgrades project under Contract CAL-01-26 for Caln Township Municipal Authority. It includes an area map, project site addresses, and a detailed drawing set index covering demolition plans, electrical legends, site plans, floor plans, details, schedules, single line diagrams, and interconnection diagrams. Keynotes specify reuse of existing conduit, routing of new conductors, and replacement of the pump control panel as per specification section 409513. The drawings provide critical technical details necessary for the project execution.
PDF
PDF, High priority: read this firstifb
HighAI Summary for IFB Drawings for Kings Grant Pump Station Upgrades Contract CAL-01-26: This document is the Invitation for Bid (IFB) drawing set for the Kings Grant Pump Station Upgrades under Contract CAL-01-26 prepared for Caln Township Municipal Authority. Dated 10/24/2023, it includes detailed electrical and demolition plans, keynotes, general notes, and a proposed sequence of construction. The drawings specify contractor responsibilities such as applying for building permits, reworking junction boxes, installing new equipment like rain gauges and cellular antennas, and procedures for pump rebuild maintenance to ensure continuous station operation during upgrades.
PDF
PDF, High priority: read this firstsow
HighAI Summary for King's Grant Pump Station Upgrades - Basic Requirements: This document titled 'Basic Requirements' is part of the King's Grant Pump Station Upgrades project for Caln Township Municipal Authority, dated March 2026. It outlines general contract considerations including schedule of values, applications for payment, change procedures, and alternatives. It details coordination and meetings such as preconstruction and progress meetings, submittal procedures, quality control measures, construction facilities and temporary controls, material and equipment handling, system startup, and contract closeout procedures. The document serves as a foundational statement of work (SOW) defining administrative and procedural requirements essential for project execution and contract management.
PDF
PDF, High priority: read this firstprocurement-and-contracting-requirements
HighAI Summary for King's Grant Pump Station Upgrades Contract CAL-01-26 Procurement and Contracting Requirements: This document is the Project Manual for the King's Grant Pump Station Upgrades, Contract CAL-01-26, prepared for Caln Township Municipal Authority in March 2026. It includes the Division 00 Procurement and Contracting Requirements, covering procurement requirements such as Advertisement for Bids, Instructions to Bidders, Bid Form, Bid Bond, and bidder qualification forms. Contracting requirements include Agreement, Performance Bond, Payment Bond, Maintenance Bond, and General and Supplementary Conditions. The document also contains a detailed Table of Contents for other divisions and appendices, including prevailing wage determinations. The Advertisement for Bids section specifies bid submission details, bid bond requirements, and contract bonding. The Instructions to Bidders section outlines bidding procedures, qualifications, bid preparation, submission, and evaluation criteria. This document is essential for bidders preparing to submit proposals for the project.
PDF
PDF, High priority: read this firstprocurement-and-contracting-requirements
HighAI Summary for King's Grant Pump Station Upgrades Contract CAL-01-26 Procurement and Contracting Requirements: This document is the Project Manual for the King's Grant Pump Station Upgrades, Contract CAL-01-26, prepared for Caln Township Municipal Authority in March 2026. It includes the Division 00 Procurement and Contracting Requirements, covering introductory information, procurement requirements such as Advertisement for Bids, Instructions to Bidders, Bid Form, Bid Bond, and bidder qualification forms. It also contains contracting requirements including Agreement, Performance Bond, Payment Bond, Maintenance Bond, and General and Supplementary Conditions. The document outlines the bidding process, submission instructions, bond requirements, and compliance with the Pennsylvania Prevailing Wage Act. The manual provides detailed instructions to bidders, qualifications, bid security, contract time, and other critical procurement and contracting details for the electrical equipment upgrades at the wastewater pump station.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for King's Grant Pump Station Upgrades - Excavation, Backfill and Compaction: This document is a technical specification section (31 23 33) for the King's Grant Pump Station Upgrades project by Caln Township Municipal Authority, dated March 2026. It covers excavation, backfill, and compaction work related to utility construction and structure installation. Key content includes quality assurance requirements such as independent compaction testing per ASTM and Pennsylvania DOT standards, submittal requirements for certification of materials and compaction results, job conditions defining excavation classifications and compaction standards, traffic control measures, and protection of existing utilities and vegetation. It also specifies bedding and embedment materials for various pipe types according to AASHTO and PennDOT standards.
PDF
PDF, High priority: read this firstproject-manual
HighAI Summary for King's Grant Pump Station Upgrades Project Manual Contract CAL-01-26: This project manual for the King's Grant Pump Station Upgrades (Contract CAL-01-26) prepared for Caln Township Municipal Authority in March 2026 includes comprehensive procurement and contracting requirements, general requirements, and technical specifications. It contains detailed sections such as advertisement for bids, instructions to bidders, bid forms, bonds, agreements, general and supplementary conditions, and various division specifications including electrical, earthwork, exterior improvements, and process integration. Appendices include prevailing wage determinations and employment verification forms. The document outlines bidding procedures, qualifications, contract security, and project scope involving electrical equipment upgrades for an existing wastewater pump station.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for King's Grant Pump Station Upgrades - Restoration of Paved Surfaces: This document is a specification section (32 12 23) for the King's Grant Pump Station Upgrades project by Caln Township Municipal Authority, dated March 2026. It details the restoration of paved surfaces including temporary and permanent paving, driveway restoration, and related quality assurance standards referencing Pennsylvania Department of Transportation publications. The document outlines materials, execution methods, traffic control, tolerances, and pavement striping requirements to ensure compliance with state specifications and project drawings.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Kings's Grant Pump Station Upgrades - Basic Electrical Materials and Methods: This document is a specification section (26 00 10) for the Kings's Grant Pump Station Upgrades project by Caln Township Municipal Authority, dated March 2026. It covers basic electrical materials and methods, including electrical equipment coordination, installation requirements, related standards (NECA 1, NETA ATS), submittal requirements for coordination drawings, quality assurance, field conditions, product manufacturers, and execution details. The document provides detailed instructions on coordination drawings, equipment location plans, underground raceways, and ductbanks, as well as quality assurance and field coordination to ensure proper installation and testing of electrical systems.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Kings's Grant Pump Station Upgrades - Process Instrumentation Specifications: This document is the Process Instrumentation specifications for the Kings's Grant Pump Station Upgrades project by Caln Township Municipal Authority, dated March 2026. It includes general requirements, submittals, warranty information, and detailed product and performance requirements for level instruments such as backup float controllers, float switches, and submersible level transducers. The document specifies manufacturers, functional descriptions, features, electrical and construction details, and quality control measures. It mandates a single instrumentation supplier responsible for system design and integration, and outlines warranty terms and submittal content including shop drawings, calibration data, and operation manuals.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Kings's Grant Pump Station Upgrades Process Instrumentation Specs: This document, dated March 2026, details the process instrumentation specifications for the Kings's Grant Pump Station Upgrades by Caln Township Municipal Authority. It includes general requirements, submittals, warranty information, and detailed product specifications for level instruments such as backup float controllers, float switches, and submersible level transducers. The document outlines performance requirements, equipment standards, manufacturer qualifications, and installation instructions. It also specifies warranty terms and the need for comprehensive operation and maintenance manuals.
PDF
PDF, High priority: read this firstifb
HighAI Summary for Raye Road Sewer Project - Bank Stabilization Wall Drawings IFB: This document contains the Invitation for Bid (IFB) for the Raye Road Sewer Repair project in Caln Township, Chester County, Pennsylvania. It includes detailed drawings and specifications for the Redi-Rock 5° retaining wall system, such as plan sheet index, retaining wall specifications, cross sections, location plans, profiles, quantity tables, and detailed construction elements like fence or pedestrian guard connections, concrete leveling pads, drainage options, step footing, and corner details. The document is prepared for Caln Township Municipal Authority and serves as a primary solicitation for contractors to submit bids for the bank stabilization wall work.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Raye Road Sewer Replacement Project Manual and Bid Documents: This document is the project manual for the Raye Road Sewer Replacement, Contract CAL-02-26, prepared by Pennoni Associates for Caln Township Municipal Authority, dated May 2026. It includes procurement and contracting requirements such as advertisement for bids, instructions to bidders, bid bond forms, bidder qualification statements, and contract agreements. The manual also contains general requirements, technical specifications for concrete, earthwork, exterior improvements, and utilities, as well as appendices with prevailing wage determinations and permits. The project involves installation of approximately 560 linear feet of 8" diameter gravity sanitary sewer main, a 90-foot retaining wall, sewer laterals, manholes, traffic control, restoration, and testing. Bids are to be submitted electronically via PennBid by June 30, 2026. The document provides detailed instructions for bidders, bonding requirements, and contract conditions.
PDF
PDF, High priority: read this firstifb
HighAI Summary for Raye Road Sewer Replacement Site Improvement Plans: This document is the Invitation for Bid (IFB) for the Raye Road Sewer Replacement project in Chester County, Pennsylvania, prepared for the Caln Township Municipal Authority. Dated May 29, 2026, it includes site improvement plans with a sheet list table covering cover sheet, general notes, existing conditions and demolition plan, sanitary sewer plan and profiles, site details, and erosion and sediment control plans and notes. The document provides detailed technical drawings and specifications necessary for bidding on the sewer replacement project.
LowAI Summary for Appendix B - Public Works Employment Verification Form for King's Grant Pump Station Upgrades: This document is Appendix B, the Public Works Employment Verification Form for the King's Grant Pump Station Upgrades project by Caln Township Municipal Authority, dated March 2026. It verifies that the contractor or subcontractor complies with the Public Works Employment Verification Act by using the federal E-Verify Program to confirm employment eligibility of new hires. The form requires the employer's information and attests to the accuracy of the verification process for employees hired after January 1, 2013, ensuring compliance throughout the contract duration.
Ref. #: Caln Township Municipal Authority, Chester County Sealed bids for the Raye Road Sewer Replacement (Contract CAL-02-26) will be received by the Caln Township Municipal Authority electronically via PennBid until 2:00 P.M. local time, Tuesday, June 30, 2026, at which time all bids will be opened online. The construction project will involve the installation of approximately 560 linear feet of 8" diameter gravity sanitary sewer main, an approximately 90-foot long Redi-Rock retaining wall, three sewer laterals with concrete encasements across a stream channel, four new concrete manholes, and manhole modifications at a site along a stream channel in residential yards (within easements) between Raye Road and Norma Drive in Caln Township, Chester County, Pennsylvania. Completion of the work will also include traffic control, pavement and unpaved ground restoration, and testing of the completed sewer system. All Bid Documents and solicitation details are available on May 29, 2026 at no cost at PennBid https://pennbid.bonfirehub.com. Click on Portal and the "Open Public Opportunities" tab to see current Opportunities. Please note that PennBid charges a fee to the awarded bidder. Each bid must be accompanied by a bid bond or a certified check in an amount not less than ten percent (10%) of the amount of the bid in the form and subject to the conditions provided in the Instructions to Bidders. No bid may be withdrawn for the period of days stated in the bid form from the date the bids are opened. The successful bidder will be required to furnish satisfactory Performance and Payment Bonds in the amount of 100% of the Contract amount and a Maintenance Bond in the amount equal to fifteen percent (15%) of the contract amount, thereafter required on the specified Bond Forms included in the Contract Documents and Waiver of Lien. The right is reserved to waive any informality in the Bid, to reject any or all Bids, and to accept any Bid which is deemed most favorable to the Owner, at the time and under the circumstances stipulated. The work in this contract shall be paid for in accordance with the Pennsylvania Prevailing Wage Act (Act No. 442)
More opportunities from Pennsylvania → Chester County