KN-000-220-002A - Rooftop Unit Replacement (RTU) @ Western Correctional Institution
Open
BPM059270State & Local
Response Deadline
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
Show more
The Maryland Department of General Services is soliciting bids for the Rooftop Unit (RTU) replacement project at the Western Correctional Institution. The scope of work includes the installation of packaged rooftop air handling units featuring 304 stainless steel drain pans and premium efficiency ODP motors, as well as airflow balancing, DDC HVAC controls conversion, and the replacement of kitchen walk-in cooler and freezer components. Additional tasks include painting and replacing baseboards, floor tiles, and ceiling tiles on the first floor. The project is estimated to be valued between $5 million and $10 million, with a total construction duration of 1095 consecutive calendar days following a written Notice to Proceed.
Bids will be awarded by lot to the responsive and responsible vendor offering the lowest total price. Minimum qualifications require bidders to be licensed in Maryland, possess at least five years of similar experience, and have completed one project of similar scope within the last five years. Due to the location at a correctional facility, contractor personnel must maintain tool inventories and are subject to physical searches, though formal security clearances are not required. The contract is subject to prevailing wage rates, Buy American Steel requirements, and ADA/ABA accessibility guidelines. Payment is processed via AIA documents, and a 1% electronic transaction fee is required for all approved invoices.
General Info
Maryland DGS seeks bids for HVAC and facility upgrades at Western Correctional Institution.
PDF, High priority: read this first14 pages · specifications
HighAI Summary for Appendix 4A - Instructions for Attachment D-1A (MBE Utilization): This document provides detailed instructions for bidders/offerors on how to complete Attachment D-1A, the Minority Business Enterprise (MBE) Utilization and Fair Solicitation Affidavit and MBE Participation Schedule. It defines MBE certification requirements, NAICS code usage, and the process for meeting or requesting waivers for MBE participation goals and subgoals. It emphasizes that failure to accurately submit these forms may result in a bid being deemed non-responsive or a proposal not susceptible for award.
PDF
PDF, High priority: read this first4 pages · specifications
HighAI Summary for Appendix 4 - MBE Participation Goal: This document outlines the Minority Business Enterprise (MBE) participation goals and subgoals for a procurement. It details the requirements for bidders to commit to these goals via Attachment D-1A, the process for requesting waivers, and the mandatory documentation (Attachments D-1 through D-5) required for submission and award eligibility. It specifies that failure to submit accurate MBE documentation may result in a bid being deemed non-responsive or a proposal not susceptible for award.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for Appendix 7 - Bonds: Effective July 2024, this document outlines the bonding requirements for the solicitation and resulting contract. It specifies requirements for Bid, Performance, and Payment bonds, defines acceptable security per COMAR 21.06.07.01, and provides details on the Surety Bond Assistance Program available to qualifying small businesses through the Maryland Small Business Development Financing Authority (MSBDFA).
PDF
PDF, High priority: read this first1 page · contract-document
HighAI Summary for Appendix 9 - Electronic Transaction Fee: This document outlines the requirements for the Contractor to remit a 1% electronic transaction fee to the State based on total approved invoice amounts. It specifies payment methods via ACH or check, the requirement to submit a Monthly Usage Report (Attachment Z), and the effective date of February 2026. Failure to comply is considered a contract default.
PDF
PDF, High priority: read this first2 pages · specifications
HighAI Summary for Construction Supplemental (July 2024): Effective July 2024, this supplemental document outlines additional requirements for construction solicitations. It details security protocols for personnel (ID badges, site access, and searches), bid/proposal bond requirements per Maryland law, contract retainage references, and mandates for the use of American-manufactured goods.
PDF
PDF, High priority: read this first6 pages · wage-determination
HighAI Summary for Exhibit 4 - Prevailing Wage Determination - Replace 14 rooftop units: Prevailing Wage Determination and Instructions for Contractors for Project No: KN-000-220-002 (Replace 14 rooftop units) issued by the State of Maryland Department of Labor. The document outlines requirements for electronic certified payroll submission, apprentice ratios, overtime rates, and mandatory posting of wage rates at the work site.
PDF
PDF, High priority: read this first1 page · amendment
HighAI Summary for KN-000-220-002A Rooftop Unit Replacement - Addendum 1: Addendum No. 1 issued on October 14, 2026, for the State of Maryland Department of General Services project KN-000-220-002A Rooftop Unit Replacement. This document updates the pre-bid meeting location to the Maintenance Shop at Western Correctional Institution for the meeting scheduled on October 19, 2026.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for KN-000-220-002A Rooftop Unit Replacement - Addendum 3: Addendum 3 for the Western Correctional Institution Rooftop Unit Replacement project. The document contains responses to 16 Requests for Information (RFIs) dated 10/27/2026, covering topics such as asbestos, permits, BAS/fire alarm systems, and equipment salvage. Additionally, it includes a new technical specification section (Division 23 Section 232123) for HVAC Pumps.
PDF
PDF, High priority: read this first7 pages · amendment
HighAI Summary for KN-000-220-002A Rooftop Unit Replacement - Addendum No. 2: Addendum No. 2 issued on October 21, 2026, for the State of Maryland Department of General Services project KN-000-220-002A (Rooftop Unit Replacement at Western Correctional Institution). This document provides pre-bid meeting minutes and sign-in sheets, clarifies submission requirements via eMMA, outlines mandatory bid forms, and specifies a question deadline of October 27, 2026, with a bid due date of November 11, 2026.
PDF
PDF, High priority: read this first63 pages · specifications
HighAI Summary for Maryland Department of General Services General Conditions for Construction Contracts: This document contains the General Conditions for Construction Contracts for the State of Maryland Department of General Services, revised January 18, 2023 (based on the July 1, 2022 version). It establishes the legal and operational framework for construction projects, including definitions, owner and contractor responsibilities, change order procedures, payment terms, insurance requirements, and dispute resolution.
PDF
PDF, High priority: read this first7 pages · instructions-to-bidders
HighAI Summary for Maryland Department of General Services - Instructions to Bidders for Construction Projects: Revised October 1, 2025, this document provides standardized instructions for bidders on construction projects for the State of Maryland Department of General Services. It outlines project cost classifications, bid submission requirements via eMMA, definitions for Base Bids and Unit Prices, MBE documentation requirements, and bid bond mandates for projects exceeding $200,000.
PDF
PDF, High priority: read this first22 pages · ifb
HighAI Summary for Maryland DGS IFB BPM059270 - Rooftop Unit Replacement: Invitation for Bids (IFB) issued by the Maryland Department of General Services (DGS) on October 9, 2026, for the replacement of rooftop units at the Western Correctional Institution in Cumberland, MD. The procurement is a Firm Fixed Price contract with a construction duration of 1,095 calendar days and an MBE subcontracting goal of 10%. Bids are due via eMMA by November 11, 2026, at 2:00 p.m. Local Time.
PDF
PDF, High priority: read this first536 pages · specifications
HighAI Summary for Western Correctional Institute Rooftop Unit Replacement Project Manual: 100% Construction Documents Project Manual dated September 11, 2026, for the Rooftop Unit Replacement at Western Correctional Institute (DGS Project No. KN-000-220-002A). The document includes a comprehensive table of contents covering procurement, general requirements, and technical specifications across multiple divisions (Mechanical, Electrical, Plumbing, and Structural), as well as a detailed list of project drawings.
PDF
PDF, Low priority3 pages · supporting-documents
LowAI Summary for Appendix 1 - Abbreviations and Definitions: This document provides a comprehensive list of abbreviations and definitions used within an IFB/RFP issued by the Maryland Department of General Services. It defines key terms such as Bidder/Offeror, Contract Monitor, Procurement Officer, and specific Maryland regulatory terms like COMAR, MBE, and VSBE.
PDF
PDF, Low priority2 pages · vendor-feedback-form
LowAI Summary for Attachment 1 - No Bid Proposal Notice, Vendor Feedback Form: A State of Maryland procurement form (effective July 2024) used by vendors to provide feedback on solicitations or to notify the procurement officer of their decision not to bid, including specific reasons for non-participation.
PDF
PDF, Low priority3 pages · past-performance
LowAI Summary for Attachment AA - Contractor Questionnaire: A contractor qualification questionnaire from the Maryland Department of General Services (DGS 340-8 REV 1/97). The document collects business identification, licensing, bonding capacity, financial data, MBE certification, and a detailed classification index of construction and maintenance services to evaluate a contractor's capabilities and experience.
PDF
PDF, Low priority3 pages · certification-form
LowAI Summary for Attachment AB - Certification of American-Manufactured Goods: A certification form for bidders/offerors to declare whether offered goods are American-manufactured per COMAR 21.11.15.04B(1). It includes options to identify emergency life safety and property safety goods via Form A and non-emergency goods via Form B.
PDF
PDF, Low priority2 pages · bid-bond
LowAI Summary for Attachment C - Bid Bond (KN-000-220-002A Rooftop Unit Replacement): A standard bid bond form for the State of Maryland, effective May 1, 2018, specifically associated with project KN-000-220-002A Rooftop Unit Replacement. The document provides the legal framework for the Principal and Surety to guarantee the execution of the contract upon bid acceptance.
PDF
PDF, Low priority2 pages · bid-bond
LowAI Summary for Attachment C - Bid Bond - Limited Liability Company: A standard bid bond template for Limited Liability Companies, effective May 1, 2018, used for the State of Maryland. This document serves as a legal guarantee that the principal will execute the contract and provide required bonds upon award for project KN-000-220-002A Rooftop Unit Replacement.
PDF
PDF, Low priority1 page · special-notice
LowAI Summary for Exhibit 1 MBE, VSBE, SBR Research Factors - KN-000-220-002A: Effective July 2024, this document provides research factors for Minority Business Enterprise (MBE), Veteran-owned Small Business Enterprise (VSBE), and Small Business Reserve (SBR) participation for solicitation BPM059270 (Rooftop Unit Replacement @ Western Correctional Institute). It lists NAICS and UNSPSC codes for plumbing, electrical, and roofing contractors along with the number of certified businesses available in the MDOT and eMMA directories.
PDF
PDF, Low priority25 pages · contract-document
LowAI Summary for Maryland Department of General Services Sample Contract: A sample contract template from the Maryland Department of General Services (DGS). The document outlines standard terms and conditions, including definitions, scope of contract, period of performance, notice to proceed, and payment terms. It references the incorporation of the IFB, Contract Affidavit, and Bid as exhibits.
PDF
PDF
AI Contract Breakdown
Uniform Contract Format
Sign up to view the full breakdown with detailed analysis of each section.
Timeline
1 update
PhaseSolicitation
Posted
Solicitation
Deadline changed
Response deadline time changed from 5:00 AM UTC to 7:00 PM UTC on Nov 20, 2026.
Response Deadline
Submission deadline
Response Deadline
Ready to pursue this opportunity?
Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.